Steven D. Creasman
No description specified.
1-50 (297 Records)
Documents
- 1982 End of Year Report (1983)
- 1985 End-Of-The Year Report Showing Class III Inventories Performed On Public Lands in Utah (1986)
- 9 American Gilsonite Core Holes (1983)
- Addendum: Panhandle Eastern Proposed 10" Pipeline To Serve Davis Buccaneer Well #1 (1981)
- Additional Archaeological Survey for the Proposed Realignment of KY 7 (Item No. 9-126.00) in Elliott County, Kentucky (2002)
- Affidavit of Cultural Materials Survey of Access Roads for Maggie State #1 Location (1979)
- Affidavit of Cultural Resource Inventories of #7-3 Federal Clay Basin Well and Access Road (1982)
- Affidavit of Cultural Resource Inventories of Redwash-Fidlar Pipeline Crossing (1983)
- Affidavit of Cultural Resource Inventories of Wexpro's Proposed Island Unit #15 Well Location and Access Road (1983)
- Affidavit of Cultural Resource Inventories On Wexpro's Island Unit #14 Well Location and Access Road (1983)
- Affidavit of Cultural Resource Inventories, Mobil Oil Corporation Tank Battery Location, Access Road, and Transmission Line (1981)
- Archaeological Investigations Along the Trailblazer Pipeline, Volume I (1982)
- Archaeological Investigations In the Canyon Pintado Historic District - Phase II: Inventory and Test Excavations (1981)
- Archaeological Investigations in the Canyon Pintado Historic District, Rio Blanco County, Colorado, Phase I-Inventory and Test Excavations (1981)
- Archaeological Investigations in the Canyon Pintado Historic District, Rio Blanco County, Colorado: Phase I - Inventory and Test Excavations (1981)
- Archaeological Investigations In the Canyon Pintado Historic District: Phase I Inventory and Test Excavations (1981)
- Archaeological Investigations of the Arch Mineral Corporation Proposed Hanna South Lease Area (1982)
- Archaeological Monitor and Salvage Excavations Along the Trailblazer Pipeline, Southern Wyoming, Volume I (1983)
- Archaeological Reconnaissance of Little Snake Unit No. 1, Andarko Production Company, Moffat County, Colorado (1977)
- Archaeological Reconnaissance of the Proposed Union-Florence Road, U.S. 42 Upgrade, Boone County, Kentucky (1993)
- An Archaeological Reconnaissance Survey of the Proposed Mariba-Denniston U.S. 460 Realignment, Alternates 5 and 6, Menifee County, Kentucky (1993)
- An Archaeological Reconnaissance Survey of the Proposed Mariba-Denniston U.S. 460 Realignment, Menifee County, Kentucky (1993)
- Archaeological Research Design and Data Recovery Plan for the South Haystack Coal Mine and Conveyer System, Uinta County, Wyoming (1983)
- Archaeological Research Design and Data Recovery Plan for the South Haystack Coal Mine and Conveyor System, Uinta County, Wyoming- Appendix D3: South Haystack Archaeology Pit Area and Conveyor Introduction (1983)
- Archaeological Survey of 20.9 Km of Seismic Lines in Moffat County, Colorado (1984)
- An Archaeological Survey of a Material Borrow Area, Capitol View Park, City of Frankfort, Franklin County, Kentucky. (1992)
- An Archaeological Survey of a Proposed Coal Mine Operation Along Little Sturgeon Creek in Owsley County, Kentucky (2002)
- An Archaeological Survey of a Proposed Industrial Park at Owensboro, Daviess County, Kentucky (1992)
- An Archaeological Survey of a Proposed Landfill in Pearl Hollow, Hardin County, Kentucky (1992)
- Archaeological Survey of General Crude Oil Seismograph Lines and Access Roads in the Pinyon Ridge Area, Rio Blanco County, Colorado (1977)
- An Archaeological Survey of the Proposed Cardinal Pipeline in Meade County, Kentucky (2002)
- An Archaeological Survey of the Proposed County Road 1388 Bridge Replacement Project in Logan County, Kentucky (Item No. 3-1054.00) (2002)
- An Archaeological Survey of the Proposed East Dry Ridge Connector, Grant County, Kentucky (2002)
- An Archaeological Survey of the Proposed KY 536 (Mt. Zion Road) Reconstruction, Boone County, Kentucky (2002)
- An Archaeological Survey of the Proposed Little Black Cellular Communication Tower Location in Harlan County, Kentucky (2002)
- Archaeological Survey of the Proposed Realignment of Kentucky Highway 61, Burksville-Columbia, in Adair, Cumberland, and Metcalfe Counties, Kentucky (1993)
- An Archaeological Survey of the Proposed Upgrade of US 60 from the Intersection of KY 425 to the Intersection of US (2001)
- An Archaeological Survey of the Proposed US 52 Reconstruction (Item No. 10-274.00), Lee County, Kentucky (2002)
- Archeological Investigations at the Mills Site (15BL80), Bell County, Kentucky (1995)
- Archeological Reconnaissance of the Federal Oil Shale Lease Tract C-B Sediment Stations, USGS (1976)
- Archeological Reconnaissance of the Horse Draw Drilling Site Access Road, Bureau of Mines (1977)
- Archeological Reconnaissance of the Rangely Oil Field Electrical Powerlines, Moon Lake Electric Association (1975)
- Archeological Survey of the Proposed Hindman Sewage Treatment Plant Expansion, Knott County, Kentucky (1993)
- Archeological Survey of the Proposed Phase II Expansion Areas To an Existing Landfill in Montgomery County, KY (1993)
- Beard 1-35 Fed Well and Access (1981)
- Belco Oil Overhead Electric Line (1982)
- Canyon Pintado Historic District Preliminary Report (1977)
- Celsius Enerfy Company: Island Unit Well No. 26 and Access Road (1986)
- Celsius Energy Company Federal Well 25-1 and Access Road (1984)
- Celsius Energy Company Proposed Rabbit Mountain Well 6-1 and Access Road (1984)