Red-on-Grayware (Material Keyword)

1-3 (3 Records)

Archaeological Investigations: Salt River Project Palo Verde to Kyrene 500 kV Transmission Line Right-of-Way, Private, State and Bureau of Land Management (Phoenix District Office) Lands, Maricopa, Arizona: Final Report for an Archaeological Survey of the Palo Verde to Kyrene 500 kV Transmission Line, Maricopa, County, Arizona (1978)
DOCUMENT Full-Text Margaret A. Powers. Mark J. Keane. Donald E. Weaver, Jr..

At the request of Salt River Project, the Museum of Northern Arizona conducted an archaeological survey of a proposed 500kV transmission line between the Palo Verde Nuclear Generating Station (near Wintersburg, Arizona) and the Kyrene Substation (near Tempe, Arizona). During survey of the 73.3 mi right-of-way, evidences of historic and prehistoric activity were recorded at 10 sites and 43 loci of isolated artifacts or features. With few exceptions, all identified remains could be assigned to the...


Archaeological Survey in Catalina State Park with a Focus on the Romero Ruin (1987)
DOCUMENT Full-Text Mark D. Elson. William H. Doelle.

Catalina State Park is situated approximately 22 km (14 miles) north of Tucson, Arizona. Within this beautiful and pristine desert area lie a large number of relatively undisturbed archaeological sites. The park has witnessed a long and varied history. Sometime after 5000 B.C. Archaic period hunters and gatherers first roamed through the park area in their search for game and edible plants. During the following Hohokam period the park area was intensively occupied. A wide range of sites are...


An Archaeological Survey in the Blackwater Area, Volume 2: Site Descriptions and Related Data (1994)
DOCUMENT Full-Text David A. Gregory. Diane L. Douglas.

The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...