San Carlos Irrigation Project (Other Keyword)

1-5 (5 Records)

A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


HAER No. AZ-50, San Carlos Irrigation Project, North and South of Gila River, Vicinity of Coolidge, Pinal County, Arizona: Photographs, Written Historical and Descriptive Data (1996)
DOCUMENT Full-Text Christine Pfaff.

The San Carlos Irrigation Project (SCIP) is significant for creating an integrated irrigation system to serve both Indian and non-Indian lands along the Gila River. Prior to project construction, irrigation of area lands was piecemeal and non-Indian agricultural development above the Gila River Indian Reservation had depleted water supplies for the Indians. Initial authorization of the project in 1916 and the passage of the San Carlos Act on June 7, 1924 culminated years of studies and efforts...


HAER No. AZ-7, Coolidge Dam, Pinal County, Arizona: Photographs, Written Historical and Descriptive Data, and Reduced Copies of Drawings (1986)
DOCUMENT Full-Text David M. Introcaso.

Coolidge Dam was authorized in 1924 and was completed in 1928. It was built by the U.S. Indian Service. Today Coolidge Dam supplies water from the Gila River to the Gila River Indian Community and to non-Indian growers as well. This report satisfies Historic American Engineering Record (HAER) standards as established by the National Park Service. A copy of this report, along with a complete set of archival negatives and photographs, has been deposited in the HAER collection at the Library of...


Historic American Engineering Record: Coolidge Dam, Pinal County, Arizona (1986)
DOCUMENT Full-Text David M. Introcaso.

Historic American Engineering Record (HAER) No. AZ-7 presents a written historical summary and relevant historical documentation about the construction and use of the Coolidge Dam, which impounds water along the Gila River to form the San Carlos Reservoir 30 miles southwest of Globe, Arizona. It also contains a summary of Gila River water usage and conflicts over water access, from native Pima and Maricopa water use to Historic era, multi-community uses. The report contains a narrative...