Archaeological Investigations: Arizona Nuclear Power Project, Salt River Project, Bureau of Land Management, State, and Private Lands, Maricopa County, Arizona: Final Report for Palo Verde to Westwing Transmission System: An Intensive Survey of the Transmission Line and Access Roads (1977)
DOCUMENT Full-Text Pat H. Stein. Stanley Granger. Cynthia L. Freeman.

Seven archaeological sites and 26 isolated finds were recorded during a recent survey of the right-of-way and access roads for the proposed Palo Verde to Westwing Transmission Line. The sites ranged from Hohokam camps and special-purpose, limited activity sites to Anglo homesteads of the early 20th century. Other archaeological loci usually consisted of isolated sherds or a pot-drop, though one flaked tool and several pieces of ground stone were also found. The three prehistoric sites were...


Archeological Investigations Along the Salt-Gila Aqueduct (1979)
DOCUMENT Full-Text Pat H. Stein.

In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....


The Beeline Archaeological Project (1990)
DOCUMENT Full-Text Richard W. Effland. Scott Fedick.

The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...


Boundary Delineation and Limited Testing of Several Sites on the Fort McDowell Indian Reservation, Maricopa County, Arizona (1994)
DOCUMENT Full-Text Kim Adams.

Archaeological Consulting Services, Ltd. (ACS) conducted survey of 200 acres and limited testing of cultural resources on Fort McDowell Mohave-Apache Indian Community (FMIC) land at the request of Mr. Jon Czaplicki of the Bureau of Reclamation (Reclamation). The work was performed to define the boundaries of archaeological sites to be avoided by agricultural development. Eight sites were slated for preservation; however, only seven sites were relocated and flagged, and two new sites were...


Mitigation Plan for the Salt-Gila Aqueduct (1979)
DOCUMENT Full-Text Pat H. Stein.

In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....


Preliminary Report: Archaeological Monitoring of a U S West Communications Fiber Optic Cable Trench Along the South Side of the Grand Canal near Pueblo Grande National Historic Landmark, Phoenix, Maricopa County, Arizona (1994)
DOCUMENT Full-Text Holly S. DeMaagd. Barbara S. Macnider.

At the request of U S West Communications (US West), Archaeological Consulting Services, Ltd. (ACS) performed archaeological monitoring along a utility right-of-way. The right-of-way is within the south side access road for the Grand Canal, which passes through the City of Phoenix administered Pueblo Grande National Historic Landmark (Pueblo Grande; AZ U:9:7(ASM)). The canal is administered by the Salt River Project and owned by the Bureau of Reclamation. Limited testing within the right-of-way...