Crimped Seam Can (Other Keyword)

1-2 (2 Records)

An Archaeological Survey in the Blackwater Area, Volume 2: Site Descriptions and Related Data (1994)
DOCUMENT Full-Text David A. Gregory. Diane L. Douglas.

The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...


A Cultural Resources Survey of 17.5 Miles of State Route 88, the Apache Trail, Between Apache Junction and Tortilla Flat, Pinal and Maricopa Counties, Arizona (1995)
DOCUMENT Full-Text Andrew I. Duff.

Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefore, the Arizona Department of Transportation requested that a 200 foot wide right-of-way be surveyed for the entire project length unless clearly marked property boundaries or other right-of-way indications were present. The 17.5 mile long survey...