Southern Pacific Railroad (Site Name Keyword)

1-8 (8 Records)

Class I Cultural Resource Inventory of Lands Associated with the Desert Basin 230kV Project (2007)
DOCUMENT Full-Text Don W. Jolly.

The Salt River Project Agricultural Improvement and Power District (SRP) contracted with Greystone/An Arcadis Company to compile this Class I Cultural Resources Inventory for the 230kV Power Line Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. The Project includes the construction of a new 230kV transmission line from the Desert Basin Generating Station, located near the intersection of Burris and Korsten roads.


A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...


Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
DOCUMENT Full-Text Tiffany C. Clark. T. Kathleen Henderson.

This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...


A Cultural Resources Survey of Approximately 68 Acres of Salt River Project Land South of Washington Street, Tempe, Maricopa County, Arizona (2001)
DOCUMENT Full-Text Thomas E. Wright.

On December 6, 2000, Archaeological Research Services, Inc. (ARS) conducted a cultural resources survey of approximately 68 acres of land owned by the Salt River Project in northwestern Tempe, Maricopa County, Arizona. The project area is bounded on the north by Washington Street, on the south by the Union Pacific Railroad tracks, on the east by a property boundary approximately 600 feet west of Center Parkway, and on the west by Priest Drive.The project area is being considered for the...


A Cultural Resources Survey of the Proposed Hassayampa-Jojoba Transmission Line, Maricopa County, Arizona (2002)
DOCUMENT Full-Text Regina L. Chapin-Pyritz. Matthew Hill, Jr..

GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG...


Data Recovery Plan for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson. Allison Cohen Diehl.

Salt River Project Agricultural Improvement and Power District (SRP) plans to construct new 12kV /69kV electric lines between the Dinosaur and Hunt substations east of Queen Creek, Arizona. A cultural resources survey has determined that portions of nine archaeological sites which meet criteria for inclusion on the Arizona and National Register of Historic Places are present within the electric lines corridor (Clark 2007). SRP has further established that construction activity for the...


Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1983)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

Flooding along the Salt, Gila, Verde, and Agua Fria Rivers in February and March of 1978 resulted in extensive damage to property in Central Arizona and in the disruption of ground transportation and commerce in the greater Phoenix area. Major flooding also occurred along these rivers in December, 1978 and February, 1980. The recognition of this flooding problem, and of requirements for the regulatory storage of Central Arizona Project (CAP) water, prompted the U.S. Department of the Interior,...