Archaeological Data Recovery for the Dinosaur to Hunt 12kV/69kV Electric Line, Pinal County, Arizona (2008)
DOCUMENT Full-Text Elizabeth A. Bagwell. Jenny L. Adams. T. Kathleen Henderson. Stacy L. Ryan. Joshua S. Watts.

Results of data recovery investigations at four archaeological sites within the Dinosaur to Hunt (DIR-HUN) 12kV/69kV electric line corridor, east of Queen Creek, Arizona, are presented in this report. All four sites are located on Arizona State Trust Land, and all were found to meet eligibility criteria for inclusion in the Arizona and National Registers of Historic Places (Clark 2007). The archaeological work was conducted to mitigate adverse effects of construction of the Dinosaur to Hunt...


Archaeomagnetic Dates and the Hohokam Phase Sequence (1988)
DOCUMENT Full-Text Jeffrey Eighmy. Randall H. McGuire.

Few things in Southwestern archaeology are so widely and hotly contested as the Hohokam phase sequence and chronology. Presently, no fewer than 12 different Hohokam chronologies exist and more appear to be under production. Disputes concerning the Hohokam chronology involve not only the dating of phases but also, even more basically, challenges to the integrity of the phase definitions. In the last decade, controversy has focused on three aspects of the chronology; (1) the validity and ordering...


Cultural Resources Survey for the Pinal West to Abel/Browning 500 kV Transmission Line, Arizona State Lands Segments, Santa Rosa Substation to Dinosaur Substation, Pinal County, Arizona (2008)
DOCUMENT Full-Text T. Kathleen Henderson. Tiffany C. Clark. Connie A. Darby.

This report presents the results of a Class III cultural resources survey of Arizona State Land right-of-way easements for a new extra-high voltage transmission line to be built between the Santa Rosa Substation, located south of the Ak Chin Indian Community, and the Dinosaur Substation, located east of the Town of Queen Creek, in Pinal County, Arizona (Figure 1). The proposed transmission line is part of the larger Pinal West to Abel/Browning (PW-ABL/BRG) 500 kV Transmission Line Project. The...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.


Cultural Resources Survey for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
DOCUMENT Full-Text Tiffany C. Clark.

Class III cultural resources survey for 12kV/69kV electric lines connecting the Dinosaur Substation and the Hunt Substation southeast of Queen Creek, Pinal County, Arizona.


Data Recovery Plan for Archaeological Sites on Arizona State Trust Land along the SRP Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text Michael Lindeman.

Salt River Project Agricultural Improvement and Power District (SRP) plans to construct an 88-mile-long extra-high voltage transmission line linking the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations. The project corridor traverses the area from the Maricopa/Pinal County line west of the Ak Chin Indian Community, southeastward and eastward past Casa Grande, Arizona, then roughly northward past Coolidge and Florence, Arizona, ending east of Queen Creek, Arizona, along the...


Data Recovery Plan for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
DOCUMENT Full-Text T. Kathleen Henderson. Allison Cohen Diehl.

Salt River Project Agricultural Improvement and Power District (SRP) plans to construct new 12kV /69kV electric lines between the Dinosaur and Hunt substations east of Queen Creek, Arizona. A cultural resources survey has determined that portions of nine archaeological sites which meet criteria for inclusion on the Arizona and National Register of Historic Places are present within the electric lines corridor (Clark 2007). SRP has further established that construction activity for the...


The Dinosaur: Archaeological Investigations Within the Gila River Valley for the Salt River Project's Pinal Central to Dinosaur 500 kV Transmission Line, Pinal County, Arizona (2010)
DOCUMENT Full-Text Uploaded by: adam brin

Salt River Project Agricultural Improvement and Power District (SRP) plans to construct an 88-mile-long 500-kV extra-high voltage transmission line linking the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur substations (ACC CEC Case No. 126). This report presents the results of Phase I data recovery (extent testing) and Phase II data recovery within a 40-m- (130-ft-) wide corridor at seven sites located on State Trust Land administered by the Arizona State Land Department (ASLD) (ASLD...


Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume VIII: Material Culture (1984)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This is the eighth volume of a nine-volume series reporting archaeological investigations in south-central Arizona along the Salt-Gila Aqueduct (SGA), conducted for the U.S. Bureau of Reclamation (USBR) under Contract No. 0-07-32-V0101. The SGA is a 58-mile-Iong component of the Central Arizona Project that begins east of Phoenix and extends to the vicinity of the Picacho Mountains. Specialized analyses of artifacts recovered from 45 sites excavated along the SGA are reported in this volume. The...


Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...