Grand Canal (Site Name Keyword)

1-20 (20 Records)

Addendum Cultural Resources Monitoring and Discovery Plan for the Grand Canalscape Phase II (TIGER) Shared-use Path Project Construction, Phoenix, Maricopa County, Arizona (2018)
DOCUMENT Full-Text Glennda Gene Luhnow. Nancy Shelton.

The Grand Canalscape Phase II (TIGER) Shared-use Path project is a City of Phoenix (City) pathway improvement project that would complete a shareduse path along the Grand Canal from Interstate 17 (1-17) in Phoenix to the City of Tempe border at 56th Street. The pathway improvements would occur along three discontiguous segments of the Grand Canal (designated as segments 1, 2, and 3). Phase I of the Grand Canalscape, which is under construction, would provide the connection between the three...


Arizona Department of Transporation Environmental & Enhancement Group: An Addendum Cultural Resources Class I Overview Report for the 202L, South Mountain Freeway EIS & L/DCR Project, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Mark Brodbeck. Jewel Touchin.

An addendum Class I overview to cover expanded portions of the State Route Loop 202 (202L), South Mountain Freeway, Environmental Impact Statement (EIS) & Location/Design Concept Report (L/DCR) study area along Interstate I-10 (I-10) and the State Route Loop 101 (101L) freeways that were not included in the initial Class I report (Burden 2002). This overview presents a comprehensive assessment of previous archaeological investigations and recorded archaeological sites and historic building...


Central Phoenix Basin - Archaeology Map - Maricopa County, Arizona (1992)
IMAGE Uploaded by: Katelyn Roessel

"Funding for data collection and map production provided by Arizona Department of Transportation Contract No. 85-33. This map is based on the named USGS 7.5 minute series topographic map. Prehistoric information compiled from various sources by Jerry B. Howard. See Howard and Huckleberry (1991: Chapter 2) for further explanation of data sources and map compilation methods. Some errors and inconsistencies could not be rectified during the production process by Soil Systems, Inc. and GEO-MAP,...


Cultural Resources Survey of a CA 1.19 Mile Long Corridor for a Proposed Drainage Channel Associated with the Agua Fria Freeway (State Route 101L), Located Directly North of the Grand Canal and Bethany Home Road in Glendale, Maricopa County, Arizona (1998)
DOCUMENT Full-Text Bradford W. Stone.

On December 29, 1997, and January 9 and February 20, 1998, Archaeological Research Services, Inc. (ARS) conducted a cultural resources (archaeological) survey along a portion of the Grand Canal in Glendale, Maricopa County, Arizona. The survey was performed at the request of the Arizona Department of Transportation (ADOT) to determine if important cultural resources were present within or immediately adjacent to the study area which could be affected by the construction of a proposed drainage...


A Cultural Resources Survey of Approximately 68 Acres of Salt River Project Land South of Washington Street, Tempe, Maricopa County, Arizona (2001)
DOCUMENT Full-Text Thomas E. Wright.

On December 6, 2000, Archaeological Research Services, Inc. (ARS) conducted a cultural resources survey of approximately 68 acres of land owned by the Salt River Project in northwestern Tempe, Maricopa County, Arizona. The project area is bounded on the north by Washington Street, on the south by the Union Pacific Railroad tracks, on the east by a property boundary approximately 600 feet west of Center Parkway, and on the west by Priest Drive.The project area is being considered for the...


Cultural Resources Survey of the Salt River Project Canals, Maricopa County, Arizona, Revised (1998)
DOCUMENT Full-Text Lourdes Aguila.

Archaeological Consulting Services, Ltd. (ACS) conducted a Class III (Intensive), non-collection cultural resources survey on approximately 170 miles of the Arizona, Arizona Crosscut, Grand, Tempe, Tempe Crosscut, Consolidated, Eastern, South, Western, Highline, and Kyrene Branch Canals in Maricopa County, Arizona. The survey was undertaken at the request of Jon S. Czaplicki, U.S. Bureau of Reclamation (Reclamation) archaeologist and Contracting Officer's Technical Representative for Contract...


Draft Archaeological Monitoring Report for the SRP Grand Canal Lining Project between 40th Street and State Route 143 in Phoenix, Maricopa County, Arizona (2008)
DOCUMENT Full-Text Kimberley A. Ryan.

SRP is responsible for management of a 131-mile system of canals, which must be maintained year round. To allow for the performance of routine maintenance and canal improvements, portions of main canals within the SRP network are "dried up" for a one-month period during the fall and winter seasons. As part of a larger effort to reduce erosion and water loss through ground seepage, the Grand Canal lining project was conducted to install a protective concrete lining along a previously unlined...


Farming on the Floodplain: Archaeology fo the Phoenix Sky Harbor International Airport Center Runway (Runway 7L-25R) Reconstruction Project, Part 2: Appendices (2007)
DOCUMENT Full-Text Uploaded by: system user

Between December 2000 and June 2005 Archaeological Consulting Services, Ltd. (ACS) of Tempe, Arizona, completed five field sessions of archaeological monitoring, testing/data recovery I, and data recovery II. The entire airport is highly modified by grading, modern fill, paving, and building; thus, the ground surface offers few clues to what lies beneath. However, the airport is bounded by known historic and prehistoric archaeological sites, including Pueblo Salado to the immediate west and...


Farming on the Floodplain: The Archaeology of the Phoenix Sky Harbor International Airport Center Runway (Runway 7L-25R) Reconstruction Project, Part 1: The Report (2007)
DOCUMENT Full-Text Uploaded by: system user

Between December 2000 and June 2005 Archaeological Consulting Services, Ltd. (ACS) of Tempe, Arizona, completed five field sessions of archaeological monitoring, testing/data recovery I, and data recovery II at the Phoenix Sky Harbor International Airport Runway 7L-25R and Taxiways D-E (collectively referred to hereinafter as the Center Runway project). The first session monitored geotechnical boring and coring (Ryan 2001); the second through fourth seasons included additional monitoring plus...


HAER No. AZ-17 and AZ-30, Grand Canal and Crosscut Hydro Plant, North Side of Salt River, Tempe and Phoenix, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1990)
DOCUMENT Full-Text Fred Andersen. Carol Noland.

Historic American Engineering Record (HAER) No. AZ-17 presents a written historical summary and relevant historical documentation about the construction and use of Grand Canal, which delivers water to users on the north side of the Salt River for agricultural, industrial, and municipal uses. Historic American Engineering Record (HAER) No. AZ-30 provides similar documentation about the construction and operation of the Crosscut Hydroelectric Plant, which sits at the head of Grand Canal and relies...


Historic American Engineering Record: Grand Canal and Crosscut Hydro Plant, North Side of Salt River, Tempe and Phoenix, Maricopa County, Arizona (1990)
DOCUMENT Full-Text Fred Andersen. Carol Noland.

Historic American Engineering Record (HAER) No. AZ-17 presents a written historical summary and relevant historical documentation about the construction and use of Grand Canal, which delivers water to users on the north side of the Salt River for agricultural, industrial, and municipal uses. Historic American Engineering Record (HAER) No. AZ-30 provides similar documentation about the construction and operation of the Crosscut Hydroelectric Plant, which sits at the head of Grand Canal and relies...


Historic American Engineering Record: Old Crosscut Canal, North Side of Salt River, Maricopa County, Arizona (1991)
DOCUMENT Full-Text Fred Andersen.

Historic American Engineering Record (HAER) No. AZ-21 presents a written historical summary and relevant historical documentation about the construction and use of the Old Crosscut Canal, which unified irrigation systems near Phoenix's urban core on the north side of the Salt River and contributed to flood control. The report contains a narrative description, photographs, drawings, and maps. The Old Crosscut Canal stretched from approximately Indian School Road to south of Washington Street...


Historic Documentation of Lateral 19 of the Grand Canal, Located Along 67th Avenue Between Lower Buckeye Road and Broadway Road, Maricopa County, Arizona (2008)
DOCUMENT Full-Text Judith Breen.

Tolleson Union High School District plans to construct a high school on the west side of 67th Avenue between Lower Buckeye Road and Broadway Road. As part of the construction project, the road will be widened in front of the new school, which will necessitate that a segment of a historic open lateral be piped underground. ADM Group Inc., the project architects, requested that Logan Simpson Design Inc. prepare a report documenting the history of the lateral.


Historic Documentation of Lateral 22 of the Grand Canal, Located Along 91st Avenue Between Interstate 10 and Van Buren Street, Tolleson, Maricopa County, Arizona (2006)
DOCUMENT Full-Text Judith Breen.

The City of Tolleson (City) is planning to widen 91st Avenue between Interstate 10 and Van Buren Street. As part of the project, an open, unlined, historic lateral canal that runs along the east side of 91st Avenue will be replaced by an underground pipe. Dibble & Associates, the project engineers, requested that Logan Simpson Design Inc. (LSD) prepare a historic documentation of the canal. The documentation of the lateral canal was conducted in compliance with a Programmatic Agreement (PA)...


A Historic Properties Inventory for the Sky Harbor Airport Comprehensive Asset Management Plan, Sky Harbor International Airport, Phoenix, Maricopa County, Arizona (2021)
DOCUMENT Full-Text Annie J. Lutes. Paul Rawson. Adrienne M. Tremblay.

The City of Phoenix (COP) Aviation Department has prepared a Comprehensive Asset Management Plan (CAMP) Short Range Development Plan for the Sky Harbor International Airport (Sky Harbor) in Phoenix, Arizona, to guide development at the airport over the next 20 years (herein referred to as the Sky Harbor CAMP Project). The plan proposes improvements to the airfield and the construction of two new Crossfield Taxiways, expansion of the passenger terminal, a grade change of the Union Pacific...


Historical, Archaeological, and Traditional Cultural Places Technical Report for the Proposed Sky Harbor International Airport Development Program, Phoenix, Arizona (2005)
DOCUMENT Full-Text A.E. (Gene) Rogge. Kirsten Erickson.

The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act of 1969 (NEPA) to evaluate potential impacts of a proposed Airport Development Program and its reasonable alternatives at Phoenix Sky Harbor International Airport (Airport). The FAA is responsible for complying with NEPA and FAA Orders 1050. 1E, Environmental Impacts: Policies and Procedures (U.S. Department of Transportation, FAA 2004), and 5050.4A,...


Salt River Project Diversion and Conveyance System Historic District: National Register of Historic Places Nomination Form (2017)
DOCUMENT Full-Text Jim Bailey.

The Salt River Project Diversion and Conveyance Historic District consists of nine main canals, the diversion dam that feeds water to those canals, and one hydropower plant situated on one of those canals. The contributing properties are: Granite Reef Diversion Dam (a structure); the Southside Gatekeeper’s house at the dam (a building); three canals serving land on the north side of the Salt River (the Arizona, Grand, and New Crosscut canals, all structures); six canals serving land on the south...


The Salt River Project, Arizona, a Federal Reclamation Project: National Register of Historic Places Multiple Property Documentation Form (2017)
DOCUMENT Full-Text Lynne MacDonald. Jim Bailey.

Pursuant to a 2009 Programmatic Agreement between the Bureau of Reclamation, Phoenix Area Office, the Salt River Project, and the Arizona State Historic Preservation Office, the Bureau of Reclamation prepared documentation formally nominating the Salt River Project system of dams and main canals to the National Register of Historic Places (Register). The Salt River Project Multiple Property Submission (MPS) was formally accepted and listed on the Register on August 7, 2017. This is the Salt...


Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume I: Introduction, Background, and Preliminary Field Studies (2011)
DOCUMENT Full-Text Uploaded by: system user

This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...


Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume IV, Part 1: Technical Analyses and Material Culture (2011)
DOCUMENT Full-Text Uploaded by: system user

This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...