Preclassic Hohokam period (Temporal Keyword)

1-25 (29 Records)

Archaeological Investigations at the City of Tucson Reclaimed Water Treatment Plant (1992)
DOCUMENT Full-Text Bruce B. Huckell.

As part of a long-term commitment to replenish the aquifer which has served as the sole source of water for the Tucson urban area, the City of Tucson has embarked on a project to utilize treated wastewater for ground water recharge. One area which shows promise as a recharge site is in the vicinity of the city and county wastewater treatment plants. In order to determine whether this locality would actually be suitable for the purposes of recharge, CH2M Hill was contracted with by the city to...


Archaeological Investigations of the Eastwing Terminal Mitigation Project, Maricopa County, Arizona (1985)
DOCUMENT Full-Text James B. Rodgers. Jannifer W. Gish. Kenneth J. Lord.

The purpose of this report is to disseminate all relevant information concerning the recent investigation of two sites situated northwest of Phoenix and in the south-central part of Arizona. Limited field excavation and archival research reveal that the Marinette Canal (NA18,267) may have been fed by well water, local runoff, and the seasonal flow of the Agua Fria River. This historic canal was built in 1910 by Mr. R.P. Davie and the Marinette Canal and Land Company. It heads along Calderwood...


An Archaeological Survey in the Blackwater Area, Volume 1: The History of Human Settlement in the Blackwater Area (1994)
DOCUMENT Full-Text David A. Gregory. Gary Huckleberry.

The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...


Archaeological Survey of Red Mountain Freeway (State Route 202) From State Route 87 to US Highway 60, Mesa, Maricopa County, Arizona (1997)
DOCUMENT Full-Text Barbara S. Macnider. Holly DeMaagd. David E. Doyel. Shereen Lerner. Jerryll Moreno.

In conjunction with an Environmental Impact Statement analysis being conducted for the Arizona Department of Transportation (ADOT) Red Mountain Freeway east of State Route (SR) 87 by Entranco Engineers, Inc., Archaeological Consulting Services, Ltd. (ACS) performed cultural resource investigations of proposed alternative alignments. To assist the initial alternative selection process, a Class I survey, or literature review, was first prepared for a 55-square-mile area. A Class III survey of all...


Assessment of Cultural Resources in Red Mountain Freeway (State Route 202) from State Route 87 to US Highway 60, Mesa, Maricopa County, Arizona (1999)
DOCUMENT Full-Text Barbara S. Macnider. Karolyn Jackman Jensen. Holly S. DeMaagd. Jerryll Moreno. Gerald A. Doyle.

In conjunction with an Environmental Impact Statement analysis being conducted for the Arizona Department of Transportation (ADOT) Red Mountain Freeway east of State Route (SR) 87 by ENTRANCO, Archaeological Consulting Services, Ltd. (ACS) performed cultural resource investigations of proposed alternative alignments. To assist the initial alternative selection process, a literature review was prepared for a 55-square-mile area. Survey of undeveloped portions of alternative rights-of-way...


Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...


Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
DOCUMENT Full-Text Ilya Berelov. Teresa L. Pinter.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.


A Cultural Resources Survey for the Proposed El Paso Natural Gas 2039 Line Relocation/Removal, Southwest Phoenix, Maricopa County, Arizona (1999)
DOCUMENT Full-Text Lourdes Aguila.

At the request of Sheila F. Castellano of El Paso Natural Gas Company (EPNG), Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resources survey of approximately 234 acres of private land for the proposed EPNG 2039 pipeline relocation/removal project. The survey, conducted under non-collection permit 99-15BL issued by Arizona State Museum (ASM), was to provide an inventory and assessment of cultural resources that might be impacted by the construction. One new archaeological...


Data Recovery Plan for the Esteban Park Apartments Project, City of Phoenix, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Kris Dobschuetz.

Esteban Group LLC is proposed to develop an apartment complex on privately owned land just south of Esteban Park. In accordance with the archaeological stipulations within the City of Phoenix Zoning Ordinance, Chapter 8, Section 802(B), it is the City’s policy to assist with the preservation of archaeological and historic resources within developments, where appropriate. Arizona Revised Statute § 41-865 states that it is unlawful for persons to disturb human burials and associated grave goods on...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Ceramic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Flotation Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Lithic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photolog (2012)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Pollen Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report for Phased Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Pages (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Report (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Shell Data (2012)
DATASET Archaeological Consulting Sevices, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Letter Preliminary Report of Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2012)
DOCUMENT Full-Text E. Melanie Ryan.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
PROJECT Robert Stokes. USDI Bureau of Reclamation, Phoenix Area Office. E. Melanie Ryan.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photo Log (2012)
DOCUMENT Full-Text Archaeological Consulting Sevices, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
PROJECT Robert Stokes. USDI Bureau of Reclamation, Phoenix Area Office.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Photolog for Photos from Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit 22 sites that had been identified in Reaches 1 and 2 of the Fannin-McFarland portion of the CAP canal. This is the photolog for the photos taken from the...