Central Arizona Project

Part of: USDI Bureau of Reclamation, Phoenix Area Office (PXAO)

The Bureau of Reclamation’s Central Arizona Project (CAP) collection presents results of the extensive cultural resource investigations conducted during the planning, construction, and maintenance of the project’s water delivery systems and associated infrastructure. The wide scope and expansive scale of CAP archaeology represent an impressive and now integral contribution to Southwestern archaeology, and much of the work changed and challenged many conceptions of Arizona’s prehistory. The collection’s materials are organized according to the CAP’s water delivery systems and other structures. Within each of these delivery system collections, materials are further divided into archaeological projects and tasks that were conducted to investigate cultural resources

The CAP is a multipurpose water resource development and management project that provides irrigation, municipal and industrial water, power, flood control, outdoor recreation, environmental enhancement and sediment control. The project also provides delivery of Tribal homeland water, partial settlement of Indian water rights claims, and economic benefits accruing from the leasing of Indian agricultural water rights to municipal entities. Water is provided to lands in Maricopa, Pinal and Pima counties, and to several communities, including the metropolitan areas of Phoenix and Tucson. Authorization also was included for development of facilities to deliver water to Catron, Hidalgo, and Grant Counties in New Mexico. In addition to water delivery systems, the CAP includes power generation infrastructure, principally participation in the Navajo Generation Station and a transmission system to supply power to pumping plants and check structures of the Hayden-Rhodes, Fannin-McFarland and Tucson aqueducts

For administration and construction purposes, the CAP was divided into the Granite Reef, Orme, Salt-Gila, Gila River, Tucson, and the Indian and Non-Indian Distribution divisions. During project construction, the Orme Division was re-formulated and renamed the Regulatory Storage Division; it includes New Waddell Dam and Camp Dyer Diversion Dam. Upon completion, the Granite Reef Division was re-named the Hayden-Rhodes Aqueduct, and the Salt-Gila Division was renamed the Fannin-McFarland Aqueduct.

The CAP was authorized by the Colorado River Basin Project Act of 1968. Construction of the project began in 1973 with the award of a contract for the Havasu Intake Channel Dike and excavation for the Havasu Pumping Plant (Mark Wilmer Pumping Plant) on the shores of Lake Havasu. Construction of the other project features followed. The backbone aqueduct system, which runs about 336 miles from Lake Havasu to a terminus southwest of Tucson, was declared substantially complete in 1993. The new and modified dams constructed as part of the project were declared substantially complete in 1994. All of the non-Indian agricultural water distribution systems were completed in the late 1980s, as were most of the municipal water delivery systems. Several Indian distribution systems are either under construction or remain to be built; it is estimated that full development of these systems could require another 20 years or longer.

When authorized, the plan included the construction of Hooker Dam and Buttes Dam on the Gila River to provide conservation storage, flood and sediment control, and recreation opportunities, and the construction of Orme Dam at the junction of the Salt and Verde Rivers to provide flood protection and water conservation. None of these facilities were built. Although authorized, Buttes Dam and Hooker Dam on the Gila River (in New Mexico) and Charleston Dam on the San Pedro River were not constructed because of cost considerations, a lack of demand for the water, lack of repayment capability by the users, and environmental constraints. To fulfill the authorized functions of Orme Dam, Plan 6 was developed. Plan 6 is the Regulatory Storage Division of the project and includes New Waddell Dam and Camp Dryer Diversion Dam located on the Agua Fria River, a tributary of the Gila River, and a modified Roosevelt and Stewart Mountain dams on the Salt River. These two dams predate the project and have been modified for safety and increased storage capacity.


Resources Inside This Collection (Viewing 1-23 of 23)

There are 23 Images within this Collection [remove this filter]


Archaeological Assessment of 16 Sites at Lake Pleasant Regional Park
  1. Archaeological Assessment of 16 Sites at Lake Pleasant Regional Park: Select Photos (2008)
Cultural Resource Assessment of 13 Sites in Lake Pleasant Regional Park, Yavapai County, Arizona
  1. Cultural Resource Assessment of 13 Archaeological Sites Located in Lake Pleasant Regional Park: Select Photos (2006)
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal, Maricopa, Pinal, and Pima Counties, Arizona
  1. Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Photos (2017)
Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal
  1. Photos from the Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
Cultural Resources Assessment of 23 Archaeological Sites Located Along Reach 3 of the Fannin-McFarland Portion of the CAP Canal
  1. Photos from the Cultural Resources Assessment of 23 Archaeological Sites Located Along Reach 3 of the Fannin-McFarland Portion of the CAP Canal (2007)
Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal
  1. Photos from the Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
Cultural Resources Assessment of 39 Sites in the Agua Fria Conservation Area
  1. Cultural Resources Assessment of 39 Archaeological Sites in the Agua Fria Conservation Area: Select Photos (2007)
Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A)
  1. Photos from the Cultural Resources Assessment of 59 Archaeological Sites Located Along Reaches 1 and 2 of the Tucson Aqueduct (Phase A) (2010)
A Cultural Resources Survey of 1,420 Acres Along the Lower San Pedro River, North of Benson
  1. A Cultural Resources Survey of 1,420 Acres Along the Lower San Pedro River, North of Benson: Photos (2002)
Cultural Resources Survey of 34 Acres Along Fossil Creek
  1. Photos from the Cultural Resources Survey of 34 Acres Along Fossil Creek in the Vicinity of Proposed Fish Barriers, Yavapai County, Arizona (2003)
Damage Assessment of AZ T:4:157(ASM) and AZ T:4:156(ASM) in Lake Pleasant Regional Park, Yavapai County, Arizona
  1. Damage Assessment of AZ T:4:157(ASM) and AZ T:4:156(ASM) in Lake Pleasant Regional Park, Yavapai County, Arizona: Select Photos (2003)
Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal
  1. Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal: Photos (2018)
Homesteading and Ranching in the Vicinity of Lake Pleasant Regional Park, Maricopa and Yavapai Counties, Arizona
  1. Homesteading and Ranching in the Vicinity of Lake Pleasant Regional Park, Maricopa and Yavapai Counties, Arizona: Select Photos (2007)
Lake Pleasant 52 Sites Relocation
  1. Lake Pleasant 52 Sites Relocation: Select Photos (2010)
Lake Pleasant 8 Sites Relocation
  1. Lake Pleasant 8 Sites Relocation: Select Photos (2012)
Lake Pleasant Condition Assessments for 41 Sites
  1. Lake Pleasant Condition Assessments for 41 Sites: Select Photos (2009)
Lake Pleasant Regional Park Cultural Resources Management Plan
  1. Lake Pleasant Regional Park Cultural Resource Management Plan: Selected Photos (2002)
Phase 1 Investigations at AZ T:4:150(ASM), a Multicomponent Rockshelter at Lake Pleasant Regional Park, Yavapai County, Arizona
  1. Phase 1 Investigations at AZ T:4:150(ASM), A Multicomponent Rockshelter: Select Photos of Coring and Testing (2009)
  2. Phase 1 Investigations at AZ T:4:150(ASM), A Multicomponent Rockshelter: Select Photos of Surface Collection (2009)
Phase 2 Data Recovery at AZ T:4:150(ASM), a Multicomponent Rockshelter at Lake Pleasant Regional Park, Yavapai County, Arizona
  1. Phase 2 Data Recovery Investigations at AZ T:4:150(ASM), A Multicomponent Rockshelter: Select Photos (2010)
Relocation, Reassessment, and Remapping of 74 Archaeological Sites Located Along Reaches 3, 4, and 5 of the Tucson Aqueduct (Phase B)
  1. Photos from the Relocation, Reassessment, and Remapping of 74 Archaeological Sites Located Along Reaches 3, 4, and 5 of the Tucson Aqueduct (Phase B) (2013)
Salt-Gila (Fannin-McFarland) Aqueduct Central Arizona Project Mapping and Assessment
  1. Salt-Gila (Fannin-McFarland) Aqueduct Central Arizona Project Mapping and Assessment: Photos (2009)
San Xavier Central Arizona Project Extension: Archaeological Investigations At AZ BB:13:16(ASM)-Locus F, Tohono O'odham Indian Reservation, San Xavier District, Pima County, Arizona
  1. Archaeological Investigations at AZ BB:13:16(ASM)-Locus F, Tohono O'odham Indian Reservation, San Xavier District, Pima County, Arizona: Photos (2001)