Hohokam (Culture Keyword)

1,126-1,150 (2,690 Records)

A Cultural Resource Survey for the Proposed Southwest Valley 500kV Transmission Line Project, Maricopa County, Arizona (2002)
DOCUMENT Full-Text Kris Dobschuetz. Glenn Darrington.

The proposed project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area. Also, the proposed 500kV transmission line will be double circuited with a 230kV transmission line for approximately 10 miles. The double­ circuit 500/230kV transmission line will extend between the proposed Southwest Valley Substation to the existing Liberty ...


A Cultural Resource Survey of 160 Acres for a Proposed Prison Facility at the ASPC - Special Management Unit Near Florence, Pinal County, Arizona (1993)
DOCUMENT Full-Text R. Thomas Euler.

On September 21, 1993, archaeologists from SWCA, Inc., Environmental Consultants of Tucson, Arizona, conducted an intensive archaeological survey of approximately 160 acres for a proposed prison expansion. The purpose of these investigations is to locate and describe all cultural resources within the parcel that might be adversely affected by construction of the proposed Special Management Unit prison facility. The entire quarter section in which the project area is located was surveyed. The...


A Cultural Resource Survey of 8.85 Acres West of State Route 303L, Maricopa County, Arizona (2009)
DOCUMENT Full-Text Jill Heilman.

At the request of Ritoch-Powell and FHWA and ADOT, EcoPlan conducted a Class III cultural resources survey along SR 303 in Surprise, Maricopa County, Arizona. Prior to conducting the field survey, a search of records at ASM, SHPO, and ADOT was undertaken. The field effort occurred on 18 November 2009, amounting to two days of effort. No cultural resources were encountered in the survey area. Additionally, no cultural resources were encountered by previous survey throughout the project area....


A Cultural Resource Survey of a 50-Acre Parcel Near Tucson, Arizona (2004)
DOCUMENT Full-Text David B. Tucker.

On July 25 and 29, 2003, SWCA Environmental Consultants (SWCA) conducted a Class III cultural resource inventory of a 50-acre parcel of privately-owned land in anticipation of a planned housing development. The work was requested by Mr. Joe Heater and conducted under the authority and conditions of Arizona Antiquities Act Blanket Permit No. 2003-17bl. The survey was required in order to comply with Pima County regulations concerning cultural resources. The project area was thoroughly examined,...


Cultural Resource Survey of a Portion of the Hayden to Coolidge Power Line, Near Coolidge, Pinal County, Arizona (1996)
DOCUMENT Full-Text Johna Hutira.

Northland Research, Inc. (Northland) was contracted by Salt River Project (SRP) to perform a Class III cultural resources survey (Arizona Antiquities Act Permit 96-61-BL) of a portion of the Hayden to Coolidge Power Line which crosses through the known boundaries of the prehistoric Hohokam Grewe site (AZ AA:2:2[ASM]). The survey was conducted on a 500 ft (152 m) long by 66 ft (20 m) wide stretch of land, covering .23 acres, located north of Coolidge, Arizona. The work was conducted on 23 May...


Cultural Resource Survey of Proposed 12kV Distribution Line Right-of-Way in Section 5, T2S, R10E Near Florence Junction, Pinal County, Arizona (1985)
DOCUMENT Full-Text Lyle E. Stone.

On July 9, 1985, Lyle M. Stone of Archaeological Research Services, Inc. (ARS) performed a cultural resource survey of a 5777 ft long by 10 ft wide right-of-way for a proposed distribution line located about two miles north-northwest of Florence Junction in Pinal County, Arizona. The survey was requested by Salt River Project in order to determine if cultural resources (prehistoric or historic archaeological sites, historically or architecturally significant structures or build­ings) were...


A Cultural Resource Survey of Reach 1 of the Granite Reef Aqueduct, Central Arizona Project (1979)
DOCUMENT Full-Text Edward A. Dobbins.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed archaeological survey of Reach 1 and several adjacent roads that would be added or modified for its construction. Reach 1 of the Granite Reef Aqueduct extends about 18 miles from the Buckskin Mountain Tunnel, east to the Bouse Hills Pumping Plant. This report describes the results of the archaeological surveys conducted along Reach 1...


A Cultural Resource Survey of Reach 11 of the Granite Reef Aqueduct, Central Arizona Project (1978)
DOCUMENT Full-Text Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of undisturbed portions of Reach 11 and its associated recreation areas. Reach 11 was previously surveyed in 1969 (Dittert et al. 1969) and 1972 (Kemrer et al. 1972), and one site (AZ U:5:13) was mitigated prior to construction (Reynolds 1974). The majority of Reach 11 had already been constructed when this...


A Cultural Resource Survey of Reach 12 of the Granite Reef Aqueduct, Central Arizona Project (1979)
DOCUMENT Full-Text Connie Stone.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 12 and associated access roads. Reach 12 of the Granite Reef Aqueduct extends about 11 miles from Taliesin West Architectural School east to Schlechts Butte. This report describes the results of the archaeological surveys conducted along Reach 12 of the Granite Reef Aqueduct. Results suggest that the...


A Cultural Resource Survey of Reach 4, Granite Reef Aqueduct, Central Arizona Project (1979)
DOCUMENT Full-Text Edward A. Dobbins.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed archaeological survey of Reach 4 and several access roads that would be modified for its construction. Reach 4 of the Granite Reef Aqueduct extends about 14 miles from the Hovatter Road exchange with Interstate 10 to the Centennial Wash Siphon Outlet. This report describes the results of the archaeological surveys conducted along Reach...


A Cultural Resource Survey of Reach 8 of the Granite Reef Aqueduct, Central Arizona Project, (1978)
DOCUMENT Full-Text Connie L. Stone.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 8 and associated access roads. Reach 8 of the Granite Reef Aqueduct extends about 13 miles from the Hassayampa River east to U.S. 60. This report describes the results of the archaeological surveys conducted along Reach 8 of the Granite Reef Aqueduct. Results suggest that the project area was part of a...


A Cultural Resource Survey of Realigned Portions of the Liberty-Parker and Parker-Havasu Transmission Lines and Harcuvar Substation (1978)
DOCUMENT Full-Text Ed Dobbins.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of the realigned portions of the Liberty-Parker and Parker-Havasu 230kV transmission lines and the Harcuvar Substation. The Liberty-Parker 230kV Transmission Line of the Granite Reef Aqueduct extends from the Liberty Substation to the Hassayampa Tab Substation. This report describes the results of the...


Cultural Resource Survey of the Alvarado Parcel, Casa Grande, Pinal County, Arizona (2001)
DOCUMENT Full-Text Sharon K. Bauer. David E. Doyel. A. E. (Gene) Rogge.

Reliant Energy has acquired an option to purchase a 40-acre parcel known as the Alvarado property. Reliant is conducting “due diligence” studies that will be considered in deciding whether to purchase the property as a potential industrial development site. Reliant retained URS Corporation to assist in those studies by conducting a Phase 1 environmental site assessment, determining whether there are jurisdictional waters of the United States on the property, evaluating whether special status...


A Cultural Resource Survey of the Bouse Hills-Harcuvar-Little Harquahala 115 kV Transmission Lines, Central Arizona Project (1979)
DOCUMENT Full-Text Ed Dobbins.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of the Bouse Hills-Harcuvar-Little Harquahala 115 kV transmission lines. The Bouse Hills-Harcuvar Transmission Line stretches 23.3 miles from the Harcuvar Substation to the Bouse Hills Pumping Plant. The Harcuvar-Little Harquahala Transmission Line stretches 41.7 miles from the Harcuvar Substation to the Little...


A Cultural Resource Survey of the Proposed APS 230 kV Lincoln to Ocotillo Transmission Line (1982)
DOCUMENT Full-Text Margerie Green. Richard W. Effland, Jr..

At the request of Ramon Fierros of the Environmental Management Department, Arizona Public Service Company (APS), Archaeological Consulting Services (ACS) initiated a cultural resource survey for the proposed relocation of the 230 kV transmission line which links the Lincoln and Ocotillo substations (Figure 1). The Lincoln substation is located on Lincoln Street and Third Avenue in Phoenix, and the Ocotillo substation is on University and McClintock in Tempe . Relocation of the line is necessary...


Cultural Resource Survey of the Proposed Granite Reef Recharge Project, Salt River Indian Reservation, Maricopa County, Arizona (1990)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger. David H. Greenwald.

An archaeological survey of a portion of the Salt River Indian Reservation was completed for the Salt River Project (SRP) by SWCA, Inc., Environmental Consultants, during July and August, 1990. Work was performed under special use permit Number 440 issued by the Bureau of Indian Affairs, Phoenix District, and a letter of authorization from the Salt River Indian Community. The project was undertaken for a proposed ground water recharge system located north of Mesa, Arizona, along the north side...


Cultural Resource Survey of the Proposed Granite Reef Recharge Project, Salt River Pima and Maricopa Indian Community, Maricopa County, Arizona (1990)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger. David H. Greenwald.

An archaeological survey of a portion of the Salt River Pima and Maricopa Indian Community (SRPMIC) was completed for the Salt River Project (SRP) by SWCA, Inc., Environmental Consultants, during July and August, 1990. Work was performed under special use permit Number 440 issued by the Bureau of Indian Affairs, Phoenix District, and a letter of authorization from the Salt River Pima and Maricopa Indian Community. The project was undertaken for a proposed ground water recharge system located...


A Cultural Resource Survey of the Reach 9 Completion, Granite Reef Aqueduct, Central Arizona Project (1979)
DOCUMENT Full-Text Connie L. Stone.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of the completion of Reach 9. The project area extends about 1 mile from the Agua Fria River Siphon east to the New River Siphon. This report describes the results of the archaeological survey conducted along the eastern end of Reach 9 of the Granite Reef Aqueduct. Results suggest that the project area was part...


A Cultural Resource Survey Report and Archaeological Monitoring and Discovery Plan for the Salt River Project 69-kV Transmission Line Pole Replacement Between Rio Verde and Fountain Hills, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Jodi Strohmayer.

Salt River Project (SRP) maintains a 69-kilovolt (kV) transmission line between the Glenbrook substation in  Fountain  Hills  and  the  Rio  Verde  substation  in  the  community  of Rio  Verde  in  Maricopa  County, Arizona  (Figure  1).  The  transmission  line  is  currently  supported  by  30-year-old  wooden  poles,  which generally follow the alignment of McDowell Mountain Road.  In order to improve the overall  safety and durability of the transmission line, SRP intends to replace all of...


Cultural Resource Survey Report for the Road Culvert Cleanout and Grading Project, Phoenix, Maricopa County, Arizona (2007)
DOCUMENT Full-Text Daniel H. Sorrell.

The City of Phoenix (COP) is removing aggrading sediments and performing surface grading on approximately 0.5 acres of land administered by the Arizona State Land Department (ASLD) in and around a box culvert in Maricopa County, Arizona. Because these activities were believed to hold the potential to adversely affect a previously documented cultural resource site AZ T:8:89 (ASM) (Marshall 1998a), COP requested that EcoPlan Associates, Inc. (EcoPlan) conduct a cultural resources survey of terrain...


A Cultural Resource Survey Report of 204 Acres along for the Northern Parkway, near El Mirage, Maricopa County, Arizona (2012)
DOCUMENT Full-Text Uploaded by: system user

MCDOT plans to expand and extend Northern Parkway to be a parkway with grade-separated intersections at major cross streets to eliminate traffic signals and provide a higher-speed, higher-capacity, east-west route in the northwestern portion of the Phoenix metropolitan area where no freeways are planned. The current cultural resources assessment is in support of the Northern Parkway construction project, including geotechnical investigations. Before ground disturbance can begin, pursuant to the...


Cultural Resource Survey Results from Reach 7 of the Granite Reef Aqueduct, Central Arizona Project (1978)
DOCUMENT Full-Text Don E. Simonis.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 7, the Hassayampa, Jackrabbit, and Centennial Wash Siphons, and two borrow areas. Reach 7 of the Granite Reef Aqueduct extends about 11 miles from the Hassayampa-Wickenburg Road west to the Hassayampa River. This report describes the results of the archaeological surveys conducted along Reach 7 of the...


A Cultural Resources Assessment for the Western Canal Multi-use Path Project, City of Tempe, Maricopa County, Arizona (2004)
DOCUMENT Full-Text Mark Brodbeck.

In coordination with the Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHW A), the City of Tempe is planning to construct a six-mile-long multi-use path along alternating banks of the Western Canal. The multi-use path alignment, identified in the Tempe Multi-use Path System Detailed Plan (Plan) prepared in August 2000, will start on the west side of the Loop 101 Freeway halfway between Elliot and Guadalupe Roads and will extend west to the intersection of...


Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal, Maricopa, Pinal, and Pima Counties, Arizona
PROJECT Douglas Mitchell. Bureau of Reclamation.

In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...


Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Artifact Inventory and Analysis (2017)
DATASET Jennifer Rich. Lesley Rodriguez. Brad Dilli. Archaeological Consulting Services, Ltd..

ACS conducted testing at 10 sites within Reclamation’s CAP ROW seeking to resolve the National Register of Historic Places (Register) eligibility status of sites within the CAP ROW. This document presents the results of that testing. This file includes the artifact inventory and analysis collected during this project.