Hohokam (Culture Keyword)
926-950 (2,690 Records)
The Arizona Public Service Cholla-Saguaro Transmission Line Mitigation Project, an undertaking as large in scope as its full title suggests, began in April of 1977. It is hereafter referred to as Cholla. The project's obvious purpose was to mitigate construction impacts to prehistoric sites along that portion of the line extending from the Cholla generating plant near the Little Colorado River to the upper drainage of Devore Wash south of Lake Roosevelt, a distance of 135 transmission-line...
Chronological Changes in Pottery Production in the Phoenix Basin: Evidence from La Villa (2015)
Recent excavations at La Villa recovered a large quantity of pottery that spanned a broad range of time from the Vakhi (ca. A.D. 500-700) to Early Sacaton phase (ca. A.D. 950-1020). Binocular and petrographic analysis of this corpus provides insights into changes in pottery production and distribution in the Phoenix Basin, particularly for Hohokam decorated ceramic types. The results from examining early red-on-gray through red-on-gray/buff sherds indicates those vessels were made with crushed...
The Chuichu Survey: Evaluation of Archaeological Sites on the Edge of the Papagueria (1983)
Northland Research, Inc. has inspected 3,408 acres of proposed agricultural development land on the Chuichu District of the Sells Papago Indian Reservation. The Bureau of Reclamation sponsored the survey under contract 0-07-30-X0072, for cultural resource services to its Indian Distribution Division of the Central Arizona Project. Within the proposed development area, Northland recorded 50 archaeological sites, most of them being areas of widely scattered cultural debris without evident...
The CityScape Project: Archaeological Investigations of Pueblo Patricio and Block 22 in the Original Phoenix Townsite Phoenix, Maricopa County, Arizona (2012)
Final report of testing and data recovery excavations within Block 22 of the original City of Phoenix Townsite in compliance with the Arizona Antiquities Act under Section 802(A.1) of the City of Phoenix's Historic Preservation Ordinance. Testing determined that significant cultural resources—prehistoric and historic features and cultural deposits—did exist below the asphalt-capped parking lot operated by the City of Phoenix Central Parking System and resulted in the westward expansion of the...
Class I (Overview) Survey of Approximately 700 Acres Along the Upper Gila River Near Fort Thomas (2005)
The Bureau of Reclamation (Reclamation) purchased approximately 700 acres of private land for use as protected habitat for the Southwest Willow Flycatcher. The land is managed by the Salt River Project. At the request of Mr. Jon Czaplicki, Archaeological Consulting Services, Ltd. (ACS) prepared a literature review and culture history overview of the project area to evaluate its potential for cultural resources. The ACS review area includes a 1-mi buffer around the 700-acre project area of...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Photo (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Report (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I Cultural Resource Inventory of Lands Associated with the Desert Basin 230kV Project (2007)
The Salt River Project Agricultural Improvement and Power District (SRP) contracted with Greystone/An Arcadis Company to compile this Class I Cultural Resources Inventory for the 230kV Power Line Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. The Project includes the construction of a new 230kV transmission line from the Desert Basin Generating Station, located near the intersection of Burris and Korsten roads.
A Class I Cultural Resource Literature Review of 11.97 Acres for the Arioso City Lofts Development in Phoenix, Maricopa County, Arizona (2016)
AEI Consultants plans to develop an 11.97-acre parcel of privately owned land for a proposed U.S. Department of Housing and Urban development (HUD). New construction is planned in the northwest portion of the Area of Potential Effect. At the request of AEI Consultants, Archaeological Consulting Services, Ltd. (ACS) conducted a Class I literature review of the project area to provide an inventory and assessment of cultural resources that might be affected by the proposed undertaking. The parcel...
A Class I Cultural Resources Inventory of Approximately 5,820 Acres, Results of Relocation and Evaluation of Fourteen Cultural Resource Sites, for the Proposed Merrill Ranch Development near Florence, Pinal County, Arizona (2004)
This document presents the results of a class I cultural resources inventory and the results of the relocation and evaluation efforts for 14 previously recorded cultural resource sites located within the proposed Merrill Ranch residential community near Florence, Pinal County, Arizona (Figure 1). Vanguard Properties requested that Carter & Burgess, Inc. (C&B) conduct the inventory and relocation as part of the application process to obtain a permit from the United States Army Corp of Engineers...
A Class I Cultural Resources Inventory of Nearly 11 Miles for the Interstate 10 Corridor Improvement Study, Buckeye Road to Baseline Road, Maricopa County, Arizona (2002)
This report presents the results of a Class I cultural resources inventory of nearly 11 miles (mi.) of right-of-way (R/W) owned by the Arizona Department of Transportation (ADOT) along Interstate 10 (I-10) in Maricopa County, Arizona (Figures 1 and 2). Entranco completed the cultural resources inventory for DMJM+HARRIS under Contract No. 00-75, as part of an Environmental Impact Statement (EIS) for the I-10 Corridor Improvement Study. The purpose of the inventory was to determine whether...
A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...
A Class I Cultural Resources Records Search for the Proposed Salt River Project Copper Crossing Energy Center, Florence, Pinal County, Arizona (2016)
Under contract to Salt River Project Agricultural Improvement and Power District (SRP), Northland Research, Inc. (Northland) has completed a Class I cultural resources records search for the proposed SRP Copper Crossing Energy Center (CCEC) generating station located in the Town of Florence, Pinal County, Arizona. The new generating station is intended to meet SRP's projected growth in demand for power. The purpose of this Class I review is to identify and assess any cultural resources located...
Class I Cultural Resources Survey for the Proposed Renewal of Salt River Project's 500kV Palo Verde to Kyrene Transmission Line Right-of-Way Easement in Laveen and adjacent to District 6, Gila River Indian Community, Maricopa County, Arizona (2015)
At the request of Salt River Project (SRP), the Gila River Indian Community (GRIC) Cultural Resource Management Program (CRMP) completed a Class I (records search) cultural resources survey for the proposed renewal of a right-of-way easement along the existing 500kV Palo Verde to Kyrene transmission line in Laveen and adjacent to District 6 of the GRIC, Maricopa County, Arizona. The objective of the review was to assess the potential adverse effect of continued use of the easement on cultural...
A Class I Cultural Resources Survey of a 2-Acre Parcel for the Proposed Maricopa County Sheriff’s Office Complex Located in Phoenix, Maricopa County, Arizona (2012)
The proposed Maricopa County Sheriff’s Office Complex is located within the historic Original Phoenix Townsite (OPT); three historic buildings constructed between 1908 and 1944 were once present. The proposed office building is within, or near, a 250 ft buffer around two known prehistoric archaeological sites: La Villa—AZ T:12:148(ASM), and AZ T:12:95(ASM). Both sites have ill-defined site boundaries because of urban development that obscures evidence of prehistoric archaeological sites. A...
Class I Overview for Tier 1 Planning of Interstate 11, Nogales to Wickenburg, Arizona - Archaeological Sites and Historic Structures (2018)
In December 2015, the United States (US) Congress approved the Fixing America's Surface Transportation Act, which authorized a 5-year program to improve the Nation's surface transportation infrastructure. The Act formally designated Interstate 11 (1-11) through Arizona. The Federal Highway Administration (FHWA) and Arizona Department of Transportation (ADOT) are preparing a Draft Tier 1 Environmental Impact Statement (EIS) for the I-11 corridor between Nogales and Wickenburg, Arizona, pursuant...
A Class I Overview of the South Mountain Freeway Corridor Study Area, Maricopa County, Arizona (2002)
The Arizona Department of Transportation (ADOT) is preparing a new Environmental Impact Statement and Location/Design Concept Report for the South Mountain Freeway Corridor, south and west of the greater Phoenix metropolitan area. As part of that report, this Class I overview provides a detailed inventory of previously recorded archaeological sites and previous archaeological investigations located in the current study area. This document is to be used primarily as a management tool in the...
A Class I Previous Cultural Resources Records Review of the Salt River Project Southeast Power Link Project Study Area Located in Maricopa and Pinal Counties, Arizona (2018)
At the request of Derrik Berg of KP Environmental, Antigua Archaeology, LLC (Antigua) conducted a Class I (previous cultural resources records review) of the Salt River Project Southeast Power Link Project (Figure 1). The Project Study Area (PSA) is located southeast of Phoenix in Maricopa and Pinal Counties, Arizona. Antigua Archaeology, LLC has conducted a Class I (records search) of the Salt River Project Southeast Power Link project area located southeast of Phoenix in Maricopa and Pinal...
Class II (Reconnaissance) Cultural Resource Survey of Reclamation Withdrawn Land Along the East Side of the Lower Verde River
This project is part of the Lower Verde River Survey. Other entries related to that project can be found at the following link: https://core.tdar.org/collection/27743 As required under Section 110 of the National Historic Preservation Act, the Bureau of Reclamation’s (Reclamation) Phoenix Area Office conducted a Class III (intensive) cultural resources inventory of approximately 6,200 acres of Reclamation withdrawn land along the west side of the lower Verde River in early 2000, which was...
Class II (Reconnaissance) Cultural Resource Survey of Reclamation Withdrawn Land Along the East Side of the Lower Verde River: Photo Log (2010)
This project is part of the Lower Verde River Survey. Other entries related to that project can be found at the following link: https://core.tdar.org/collection/27743 As required under Section 110 of the National Historic Preservation Act, the Bureau of Reclamation’s (Reclamation) Phoenix Area Office conducted a Class III (intensive) cultural resources inventory of approximately 6,200 acres of Reclamation withdrawn land along the west side of the lower Verde River in early 2000, which was...
Class II (Reconnaissance) Cultural Resource Survey of Reclamation Withdrawn Land Along the East Side of the Lower Verde River: Photos (2010)
This project is part of the Lower Verde River Survey. Other entries related to that project can be found at the following link: https://core.tdar.org/collection/27743 As required under Section 110 of the National Historic Preservation Act, the Bureau of Reclamation’s (Reclamation) Phoenix Area Office conducted a Class III (intensive) cultural resources inventory of approximately 6,200 acres of Reclamation withdrawn land along the west side of the lower Verde River in early 2000, which was...
Class II (Reconnaissance) Cultural Resource Survey of Reclamation Withdrawn Land Along the East Side of the Lower Verde River: Report (2011)
This project is part of the Lower Verde River Survey. Other entries related to that project can be found at the following link: https://core.tdar.org/collection/27743 As required under Section 110 of the National Historic Preservation Act, the Bureau of Reclamation’s (Reclamation) Phoenix Area Office conducted a Class III (intensive) cultural resources inventory of approximately 6,200 acres of Reclamation withdrawn land along the west side of the lower Verde River in early 2000, which was...
Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...
Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona: Photo Log (2010)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...