Historic (Culture Keyword)

10,501-10,525 (12,401 Records)

Response from Stan Graves to Richard Strimel, Construction of Masonry Pillars at Grayson Street, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission wrote this letter to Fort Sam Houston notifying them of their violation of the Section 106 process of the National Historic Preservation Act. The project in question is the recent construction of masonry pillars at the entry to the Infantry Post area of the Landmark District at Grayson Street.


Response from Stan Graves to Richard Strimel, Convenience/Gas Exchange Building, Consolidated General Maintenance Facility, and Brooke Army Medical Center Linear Accelerator, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

This letter states that the Texas Historical Commission is in receipt of documentation describing Fort Sam Houston's project design for the Convenience/Gas Exchange Building, Consolidated General Maintenance Facility, and Brook Army Medical Center's Linear Accelerator. The Commission has decided that there will be "no adverse effect" to the historic districts of Fort Sam Houston and has agreed that the plan can go forward. Carbon copied to this letter is Curtis Trent, Texas Historical...


Response from Stan Graves to Richard Strimel, Correction of Surface Drainage Housing Area 3, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Teresa Kinsey. Stanley O. Graves.

This letter from the Texas Historical Commission is in response to Fort Sam Houston's 95% design drawings and specifications for the project of correction of surface drainage in Housing Area 3. Listed are several concerns regarding the project, as well as recommendations. Carbon copied to this correspondence is Michael Hilger and Dan Prikryl.


Response from Stan Graves to Richard Strimel, Edges and Entrances Section of Installation Design Guide, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission reviewed the draft chapter of "Edges and Entrances" to be included in the Installation Design Guide. This letter details the Commission's corrections, suggestions and concerns.


Response from Stan Graves to Richard Strimel, Family Housing Improvements Infantry Post Area, Buildings 630, 632, 634, 636, 638, 640, and 642, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans and specifications to the Texas Historical Commission for the 35% design review of modifications proposed for the family housing in the Infantry Post area. The structures included in the project are buildings 630, 632, 634, 636, 638, 640, and 642. This letter is the Commission's response to the 35% design review and details the recommendations and modifications they would like to impose on the project.


Response from Stan Graves to Richard Strimel, Foulois House Interior Renovations, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This letter is a confirmation of a mutual understanding between the Texas Historical Commission and Fort Sam Houston regarding the changes in the scope of work and details of interior renovation of the Foulois House. Carbon copied to this correspondence is Michael Hilger, Army Corp of Engineers.


Response from Stan Graves to Richard Strimel, Garden Sales Center Structure Adjacent to Toyland, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The plans and photographs for the proposed Garden Sales Shelter were sent by Fort Sam Houston and received by the Texas Historical Commission. The Commission has reviewed the materials and concluded that the Garden Sales Center will have "no adverse effect" on the historic Building 330 or the surrounding site.


Response from Stan Graves to Richard Strimel, Golf Course Building Additions, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission is writing in reference to a construction project proposed by Fort Sam Houston. The project entails additions being added to the golf course building and after reviewing the locator map and photo documentation of the existing building and proposed building footprints, the Commission has given its approval for the project to move forward.


Response from Stan Graves to Richard Strimel, Housing Area 3 Improvements, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves. Teresa Kinsey.

Fort Sam Houston submitted to the Texas Historical Commission a 90% design phase drawings for modifications to housing in Artillery Post. The project scope has been reduced to cover HVAC, kitchen, bathroom, and storage remodeling. The Commission concurs with Fort Sam Houston’s determination of No Adverse Effect for this project. Carbon copied to this letter is Michael Hilger.


Response from Stan Graves to Richard Strimel, Housing Area 3 Proposed Modifications and Design Analysis, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Comments contributed by the Texas Historical Commission regarding Fort Sam Houston's submittal of a design analysis of proposed work in Housing Area 3, part of the National Historic Landmark District.


Response from Stan Graves to Richard Strimel, Installation of Handicap Ramp to Building 4015, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Confirmation that the installation of a handicap ramp to the southern entry of Building 4015 as described will have "no effect" on the structure.


Response from Stan Graves to Richard Strimel, Lavatory and Wall Replacement at Brooks Army Medical Center Building 1000, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves. Demetrio Jimenez.

The Texas Historical Commission has received and reviewed the work proposal for the new lavatories and replacement walls at the Medical Center of Brooks Army Base, submitted by Fort Sam Houston. It has been determined that this scope of work will have "no adverse effect" to the historic building.


Response from Stan Graves to Richard Strimel, Maintenance and Repairs of Building 2791 and Partial Remodel of Building 602, Fort Sam Houston, Texas (1988)
DOCUMENT Full-Text Stanley O. Graves.

A letter in response to a project proposal submitted for review and comments under Section 106 guidelines. The project entails maintenance and repairs of Building 2791 and a partial remodel of Building 602 - both historic buildings are located at Fort Sam Houston. The letter goes on to list the concerns related to the project by the Texas Historical Commission.


Response from Stan Graves to Richard Strimel, New Commissary Site Location Proposal, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

This correspondence by the Texas Historical Commission is aimed at starting a discussion with Fort Sam Houston on their proposal for a new site location for the construction of a "Defense Commissary Agency Superstore." The concern of the Commission is the historically sensitive nature of the site and this letter details these concerns.


Response from Stan Graves to Richard Strimel, Post-wide Bus Stop Designs, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission has reviewed preliminary design drawings, submitted by Fort Sam Houston, for bus stops to be located throughout the Post. The concern is the recreation of Historic elements on a building or site feature that is not historic - creating a false sense of history for the casual observer.


Response from Stan Graves to Richard Strimel, Priority List of Buildings to Receive New Roofs, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission received a list from the Environmental Management Office of buildings on the Fort Sam Houston Post which are proposed to receive new roofs in the 1991 fiscal year. This letter is the Commission's feedback on each building and whether or not the project would have "no effect" for each historical structure.


Response from Stan Graves to Richard Strimel, Proposed Utility Building Behind Building 369, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission reviewed the proposed project of a new utility building being constructed behind Building 369. They determined "no adverse effect" and this letter details their conditions.


Response from Stan Graves to Richard Strimel, PX Expansion Design, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

This letter gives a lengthy set of recommendations and concerns by the Texas Historical Commission in regards to the design drawings received from Fort Sam Houston for the PX expansion project. Carbon copied to this correspondence is Mike Hilger (Base Historical Architect) and Larry Taylor (AAFES).


Response from Stan Graves to Richard Strimel, Removal of Rail Line Trestle Bridge and New Construction of Branch Exchange Shopette (1991)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission sent this letter to Fort Sam Houston to inform them that the rail line trestle bridge that was being considered for removal was recently determined eligible for the National Register of Historic Places. As a result, the propose demolition of the structure will clearly have an "adverse effect" on the structure and its environment. Carbon copied to the letter is Michael Hilger, Army Corp of Engineers and Claudia Nissley, ACHP.


Response from Stan Graves to Richard Strimel, Renovation of Second Floor of Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

Design plans and specifications for the renovation of the second floor at the Quadrangle, Building 16, have been received by the Texas Historical Commission. This letter details the Commission's suggestions and comments after review. Carbon copied to this correspondence is Amy Dase, National Register Historian.


Response from Stan Graves to Richard Strimel, Restoration of the Quadrangle, Fort Sam Houston, Texas (1993)
DOCUMENT Full-Text Stanley O. Graves.

Letter confirming that the Texas Historical Commission has received revised specifications for the restoration of the Quadrangle at Fort Sam Houston. Carbon copied is Mike Hilger.


Response from Stan Graves to Richard Strimel, Sallyport Restoration at the Quadrangle, Fort Sam Houston, Texas (1992)
DOCUMENT Full-Text Stanley O. Graves.

The design plans and specifications for the restoration of the sallyport at the Quadrangle, Building 16, were sent by Fort Sam Houston to the Texas Historical Commission. This letter details the Commission's suggestions and comments on the documents submitted.


Response from Stan Graves to Richard Strimel, Screen Door Installation at Quadrangle, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

Requests by the Texas Historical Commission concerning the design of screen door installations at the Quadrangle, Fort Sam Houston. If these design requests are agreed upon then the project will have "no effect" on the Landmark.


Response from Stan Graves to Richard Strimel, Staff Post 12 Closet Installation, Fort Sam Houston, Texas (1990)
DOCUMENT Full-Text Stanley O. Graves.

The Texas Historical Commission writes that they have received Fort Sam Houston's letter documenting a recent site visit and can now determine "no effect" on Staff Post #12 for the installation of interior bedroom closets.


Response from Stan Graves to Richard Strimel, Structural Repairs to Quarters 115, 35 Percent Review, Fort Sam Houston, Texas (1991)
DOCUMENT Full-Text Stanley O. Graves.

Fort Sam Houston submitted plans and related conditional information for the 35% design review of structural repairs to Quarters 115. This letter gives the Commission's recommendations.