Historic (Culture Keyword)

10,976-11,000 (12,401 Records)

Sacred or Secular: Religious Materiality on the French Colonial Frontier (2011)
DOCUMENT Full-Text Andrew Beaupré.

My research examines archaeologically recovered artifacts and documentary sources to gain an understanding of the role that religious material culture played on the French colonial frontier, ca. 1608-1763. This study revisits the claims made by Rinehart (1990), stating that religious items are more likely to be recovered from the archaeological record at sites near Jesuit missions. I examined a large portion of the French colonial archaeological literature and located 30 sites that have yielded...


Safeguard Missile Training Program, Fort Bliss, Texas - Brochure (2008)
DOCUMENT Full-Text Russell Sackett.

This public brochure discusses the training that occurred on Fort Bliss under the Safeguard Missile Program, which was at the forefront of the U.S. nuclear strategy.


Safety Harbor 8PI2 Testing 2019
PROJECT Uploaded by: Thomas Pluckhahn

Field and laboratory documentation associated with archaeological testing of the Safety Harbor site (8PI2), conducted by Dr. Thomas Pluckhahn (University of South Florida), in 2019.


Salado Preserve Addendum I: Cultural Resources Monitoring of Seismic Testing within the Salado Preserve South of St. Johns, Apache County, Arizona (2011)
DOCUMENT Full-Text Grant Fahrni. Michael S. Foster.

During cultural resources monitoring of seismic testing within the SRP owned Salado Preserve, LSD recorded six new prehistoric archaeological sites (LSD 5-10) and updated the description of the previously recorded site, LSD-2.The seismic crew complied with all avoidance requests and no significant impacts to known or newly recorded cultural resources occurred. This report serves as an addendum to a previous cultural resources survey report entitled A Class III Cultural Resources Survey of 84...


Salado Preserve Addendum II: Cultural Resources Survey of 3.5 Miles of Fence Line within the Salado Preserve South of St. Johns, Apache County, Arizona (2011)
DOCUMENT Full-Text Grant Fahrni. Michael S. Foster.

At the request of SRP, LSD completed a Class III cultural resources survey of 3.5 miles of fence line on the Salado Preserve south of St. Johns, Arizona. The survey resulted in the recording of three previously unrecorded sites, LSD-11, LSD-12, and LSD-13 and a total of 12 isolated occurrences (lOs). The locational data for 7 of the lOs was inadvertently lost. However, lOs are not eligible for listing in the National Register of Historic Places (NRHP) and require no further investigation or...


Salamonie Reservoir Survey 1982
PROJECT Donald R. Cochron. US Army Corps of Engineers, Louisville District. US Army Corps of Engineers Mandatory Center of Expertise for the Curation and Management of Archaeological Collections, St. Louis District. US Department of the Interior, Heritage Conservation and Recreation Service. William R. Wepler.

An archaeological survey of the Salamonie Reservoir was carried out by principal investigators William R. Wepler and Donald R. Cochran, from Ball State University in 1982. Salamonie Reservoir is located in the Huntington and Wabash counties of Indiana. The survey was conducted to identify the variables that influenced site selection, refine the cultural history of the area, develop hypotheses concerning Early Archaic settlement patterns, investigate the seeming lack of Middle Archaic occupation...


Salt River Project (1993)
DOCUMENT Full-Text Robert Autobee.

Humanity's resourcefulness inspired two attempts to draw life out of the desolation of Central Arizona's Salt River Valley over the past 1,500 years. Building over the remains of an irrigation culture left behind by lost Indian tribe, the Hohokam, federal and private engineers of the early 20th Century adapted much when the United States Reclamation Service completed first its major work, the Theodore Roosevelt Dam. The scale of Reclamation's plans separate the two efforts. The Roosevelt Dam...


Salt River Project - Project Map (1914)
IMAGE Department of the Interior - U.S. Reclamation Service. Salt River Project.

July 22, 1914. Department of the Interior, United States Reclamation Service, Salt River Project - Project Map prepared by the Board of Survey in Limiting the Area of the Project. Map depicts canals, ditches, and waterways within SRPs service territory, along with transmission lines, and other developed areas of Maricopa County.


Salt River Project - Project Map (1916)
IMAGE Department of the Interior - U.S. Reclamation Service. Salt River Project.

March 1, 1916 Department of the Interior United States Reclamation Service, Salt River Project - Project Map prepared in the Department of Operation and Maintenance, Phoenix, Arizona. Map depicts canals, ditches, waterways and transmission lines within SRP's service territory in 1916, along with developments within Maricopa County.


Salt River Project Cholla-Dinosaur Transmission Line, Tonto National Forest, Pinal County, Arizona, Final Report for Archaeological Survey of Four Proposed Substations and Access Roads (1975)
DOCUMENT Full-Text Paul R. Fish.

At the request of Salt River Project, four potential substation sites for the Cholla-Dinosaur transmission line were intensively surveyed by the Museum of Northern Arizona. The four alternative substation locations are in the Tonto National Forest near Superior, Arizona. Two of the substation localities contained archaeological remains. Reconnaissance level survey of access roads leading to the substations was also undertaken.


Salt River Project Diversion and Conveyance System Historic District: National Register of Historic Places Nomination Form (2017)
DOCUMENT Full-Text Jim Bailey.

The Salt River Project Diversion and Conveyance Historic District consists of nine main canals, the diversion dam that feeds water to those canals, and one hydropower plant situated on one of those canals. The contributing properties are: Granite Reef Diversion Dam (a structure); the Southside Gatekeeper’s house at the dam (a building); three canals serving land on the north side of the Salt River (the Arizona, Grand, and New Crosscut canals, all structures); six canals serving land on the south...


Salt River Project Forest 500 Vegetation Management Cultural Resources Data Comparison (2022)
DOCUMENT Full-Text Meghann M. Vance.

The Salt River Project (SRP) is planning to conduct 5-year vegetation management along their Coronado-Silvering 500 kV transmission line beginning in May 2022. The portion of the transmission right-of-way (ROW) that crosses Tonto National Forest (TNF)’s Tonto Basin and Pleasant Valley Ranger Districts will be subject to vegetation management during this cycle. The entire length of the proposed treatment corridor has been previously surveyed, with the most recent survey conducted by Logan...


Salt River Project Map (1934)
IMAGE T.A. Hayden.

Birdseye view of artist, T.A. Hayden depiction of the Salt River Valley and SRP's service territory with the dams they operate.


Salt River Project Pinnacle Peak to Papago Buttes Project, Assessment of Cultural Resources (1985)
DOCUMENT Full-Text Richard W. Effland.

Salt River Project (SRP) proposes to construct a 230 kV transmission line to connect the Pinnacle Peak, Brandow, and Papago Buttes substations. Archaeological Consulting Services (ACS) was contracted to perform an assessment of impacts to cultural resources that would be caused by the project. ACS is responsible for assessing potential impacts to historical and archaeological sites as well as architectural resources in the vicinity of the new right-of -way. One hundred percent survey of the...


Salt River Project, Arizona Region 3 (1950)
IMAGE U.S. Department of the Interior - Bureau of Reclamation.

June 1950. United States Department of the Interior, Bureau of Reclamation - Salt River Project, Arizona Region 3, map no. 25-300-2. This map depicts Salt River Project service territory, dams at the time with the transmission lines and voltage listed, and the major canals.


The Salt River Project, Arizona, a Federal Reclamation Project: National Register of Historic Places Multiple Property Documentation Form (2017)
DOCUMENT Full-Text Lynne MacDonald. Jim Bailey.

Pursuant to a 2009 Programmatic Agreement between the Bureau of Reclamation, Phoenix Area Office, the Salt River Project, and the Arizona State Historic Preservation Office, the Bureau of Reclamation prepared documentation formally nominating the Salt River Project system of dams and main canals to the National Register of Historic Places (Register). The Salt River Project Multiple Property Submission (MPS) was formally accepted and listed on the Register on August 7, 2017. This is the Salt...


Salt River Project, Coronado Generating Station, Ash Disposal Area and Evaporation Pond Site on Private Lands, Apache County, Arizona: Interim Report for Phase II and Phase III Operations in the Ash Disposal and Evaporation Pond Site for the Salt River Project Coronado Station, A 76-6 (1976)
DOCUMENT Full-Text Eileen Camilli.

Between February 18, 1976 and April 25, 1976 archaeological field work was conducted on the Coronado Generating Station ash disposal area and evaporation pond site for the Salt River Project, During this time 3.25 square miles were surveyed and 33 sites recorded. In addition to the fieldwork, analytical and write up phases of the project were carried out between May 3 and July 19, 1976. These phases provide a description and analysis of archaeological sites and artifactual materials from the...


Salt River Project: Superior to Silver King 115kV Transmission Line Reroute, Pinal County, Arizona (2012)
DOCUMENT Full-Text WIlliam L. Deaver.

Salt River Project (SRP) plans to reroute a segment of the Superior-Silver King 115 kV transmission line that crosses lands owned by Resolution Copper Mining (Resolution) west of Superior, Pinal County, Arizona. The transmission line draws power from the existing SRP Silver King to Kyrene East End Transmission System (SKKEETS). The transmission line is located entirely on lands owned by Resolution, and the project is the relocation of an existing 115 kV line segment. The relocation of the power...


Salt River Valley Water Users Association Operating Salt River Project - Project Map (1918)
DOCUMENT Full-Text Salt River Valley Water Users' Association.

1918, map of Salt River Project service territory with canals, waterways, and transmission lines marked.


Salt River Valley, Arizona (1907)
DOCUMENT Full-Text J. W. Crenshaw.

A promotional pamphlet to entice people to move to "A Land of Sunshine, Health and Prosperity. A Soil Unsurpassed in Productiveness. A Country of Wonderful Opportunities." by the Commissioner of Immigration of Maricopa County. "For sometime the tide of immigration has been turned towards the great Southwest and in recent years, by reason of the possibilities and opportunities offered in mining, stock raising and agricultural pursuits, Arizona, which for so long a time was regarded as a desert...


Salt River Valley, Arizona 1887 Map (1887)
IMAGE Rand, Mc Nally & Co., Engr's, Chicago. C.J. Dyer.

1887 map depicting the Salt River Valley, Arizona with the main canals and waterways with townsites marked.


The Salt River Valley, Arizona Map (1907)
IMAGE Uploaded by: Katelyn Roessel

1907 map of the Salt River Valley, Arizona irrigated by the Roosevelt Dam. "In this valley under the irrigation project. The valley has been under cultivation since 1865, no pioneering to be done. Neighbors are close at hand, churches and schools at regular intervals as shown below. For further information write Geo. W. Cowgill, Secretary Phoenix Board of Trade, Phoenix, Arizona."


Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...


Salty Crew : Salt In Food Of Sailors In The 17th And 18th Centuries. (2023)
DOCUMENT Citation Only Gaëlle Dieulefet.

This is an abstract from the session entitled "Sal, Bacalhau e Açúcar : Trade, Mobility, Circular Navigation and Foodways in the Atlantic World", at the 2023 annual meeting of the Society for Historical Archaeology. Salt is an essential food. Among maritime populations first, then for crews especially during the Early Modern Period with the development of ocean navigation. In the diet of crews, salt is subject to an administrative organization with French Ordinance of the Navy. It allows...


Salvage Archaeology at a Site Near Fort Thompson, South Dakota (1961)
DOCUMENT Full-Text Robert W. Neuman.

This report concerns the 1953 investigations conducted by a field party of the Missouri Basin Project, Smithsonian Institution, at the Farm School Site (39BF220), which is situated on an extensive floodplain along the left side of the Missouri River in Buffalo County, South Dakota. The site was first recognized in 1956 by a survey team of the Missouri Basin Project under the direction of Harold A. Huscher. The 1958 investigations, from July 7 to July 11, were supervised by Robert W. Neuman;...