Verde River (Geographic Keyword)

1-25 (51 Records)

The 1982-1984 Excavations at Las Colinas: Environment and Subsistence, Part I: Reconstruction and Interpretation of Prehistoric Salt River Streamflow (1989)
DOCUMENT Full-Text Donald A. Graybill. David A. Gregory. Fred L. Nails. Suzanne K. Fish. Charles Miksicek. Robert E. Gasser. Christine R. Szuter.

This document consists of Figures 3.2 Reconstructed Flow of the Verde River, 3.3 Reconstructed Flow of the Salt River, 3.4 Reconstructed Flow of the Salt and Verde Rivers, 3.5 Estimated Split Summer Period Flow of the Salt and Verde Rivers, and 5.2 Plots of the Recurrence Intervals for the 631-Year Period of Reconstruction. The remainder of the document (minus figures) is available on tDAR as The 1982-1984 Excavations at Las Colinas: Environment and Subsistence, tDAR ID 4531.


Archaeological Assessment of a Parcel Proposed for Agricultural Development on the Fort McDowell Indian Reservation Maricopa County, Arizona: Report (1993)
DOCUMENT Full-Text Kim Adams.

The Bureau of Reclamation (Reclamation) partnered with the Fort McDowell Indian Community (FMIC) on the FMIC Irrigated Farmland Development Project to develop new agricultural fields in accordance with the stipulations set forth in the Fort McDowell Indian Community Water Rights Settlement Act (Public Law 101-628). At the request of Reclamation, Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resource survey of 200 acres on the Fort McDowell Indian Reservation. The survey...


Archaeological Investigations at AZ U:6:2(ASU), An Historic Camp on the Banks of the Salt River, Maricopa County, Arizona (1978)
DOCUMENT Full-Text Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University conducted a cultural resource study of AZ U:6:2(ASU), an historic site located adjacent to Granite Reef Dam on the south side of the Salt River. A portion of the historic camp was contained within the construction right-of-way of the Salt River Siphon, a feature of the Central Arizona Project which connects the Granite Reef and Salt-Gila...


Archaeological Investigations at AZ U:6:87, U:6:105, and U:6:253(ASM) on the Fort McDowell Mohave-Apache Indian Community, Maricopa County, Arizona: Report (1997)
DOCUMENT Full-Text Uploaded by: Claudine Gravel-Miguel

The Bureau of Reclamation (Reclamation) assisted the Fort McDowell Indian Community (FMIC) with cultural resource investigations in advance of widening and realigning portions of Fort McDowell Road (also known as Mustang Way). These improvements were required to facilitate increased road use associated with the construction and operation of the Fort McDowell Indian Community Irrigated Farmland Development Project. Reclamation requested that Archaeological Consulting Services, Ltd. (ACS)...


Archaeological Investigations for the Fort McDowell Road Improvement Project
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation (Reclamation) assisted the Fort McDowell Indian Community (FMIC) with cultural resource investigations in advance of widening and realigning portions of Fort McDowell Road (also known as Mustang Way). These improvements were required to facilitate increased road use associated with the construction and operation of the Fort McDowell Indian Community Irrigated Farmland Development Project. This project presents the results of these undertakings.


Archaeological Survey and Assessment for the Fort McDowell Indian Community Irrigated Farmland Development Project
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation (Reclamation) partnered with the Fort McDowell Indian Community (FMIC) on the FMIC Irrigated Farmland Development Project to develop new agricultural fields in accordance with the stipulations set forth in the Fort McDowell Indian Community Water Rights Settlement Act (Public Law 101-628). At the request of Reclamation, Archaeological Consulting Services, Ltd. (ACS) conducted two surveys on proposed agricultural parcels for the FMIC Irrigated Farm Development Project in...


An Archaeological Survey of the Orme Reservoir (1975)
DOCUMENT Full-Text Veletta Canouts.

This report is a statement concerning the assessed impact of the proposed Orme Reservoir on the archaeological resources. The Orme Reservoir is one phase of the Bureau of Reclamation's Central Arizona Project plan to impound and distribute water from the Colorado River to central and southern Arizona. To be located at the confluence of the Salt and Verde rivers, the Orme Reservoir will flood approximately 24,000 acres of bottomland along both rivers. Previous archaeological data from the area...


The Bartlett Dam Project: Archaeological Test Excavations at Fourteen Sites in the Lower Verde Valley, Maricopa County, Arizona (1991)
DOCUMENT Full-Text Gregory R. Seymour. Mark Slaughter. WIlliam L. Deaver. Richard V. N. Ahlstrom.

This report documents the results of a testing program completed by SWCA, Inc. Environmental Consultants in August of 1990 in anticipation of the modification of Bartlett Dam. Modifications to the dam were planned as part of the Central Arizona Project's Regulatory Storage Division (Plan 6) and the Safety of Dams Project. During the month of April, 1990, archaeologists from Northland Research, Inc. conducted an archaeological survey of approximately 929 acres located on the Lower Verde River...


Boundary Delineation and Limited Testing of Several Sites on the Fort McDowell Indian Reservation, Maricopa County, Arizona (1994)
DOCUMENT Full-Text Kim Adams.

Archaeological Consulting Services, Ltd. (ACS) conducted survey of 200 acres and limited testing of cultural resources on Fort McDowell Mohave-Apache Indian Community (FMIC) land at the request of Mr. Jon Czaplicki of the Bureau of Reclamation (Reclamation). The work was performed to define the boundaries of archaeological sites to be avoided by agricultural development. Eight sites were slated for preservation; however, only seven sites were relocated and flagged, and two new sites were...


The Central Arizona Project Historic Preservation Program: Conserving the Past While Building for the Future (1986)
DOCUMENT Full-Text Bureau of Reclamation, Lower Colorado Region.

On July 15, 1983, the chairman of the Advisory Council on Historic Preservation (ACHP) ratified a programmatic memorandum of agreement among the Arizona and New Mexico State Historic Preservation Officers (SHPOs), the Bureau of Reclamation, and the ACHP. The subject of that agreement was the construction of the Central Arizona Project (CAP) and its impact upon historic properties. That agreement was negotiated in compliance with Section 2(b) of Executive Order 11593, "Protection and Enhancement...


Class III Cultural Resources Survey of Reclamation Withdrawn Lands along the Lower Verde River: Needle Rock Survey
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation (Reclamation) has identified approximately 4,514 acres of land for a Class III (intensive) cultural resource survey for Section 110 inventory purposes. The land was withdrawn for the Salt River Project (SRP) and is located within the Tonto National Forest (TNF), west of the lower Verde River, south of Bartlett Reservoir, and north of the Fort McDowell Mohave-Apache Indian Community. At the request of Reclamation, ACS conducted an intensive cultural resources survey...


Class III Cultural Resources Survey of Reclamation Withdrawn Lands along the Lower Verde River: Needle Rock Survey: Photo Log (2001)
DOCUMENT Full-Text Sara K. Hanan.

The Bureau of Reclamation (Reclamation) has identified approximately 4,514 acres of land for a Class III (intensive) cultural resource survey for Section 110 inventory purposes. The land was withdrawn for the Salt River Project (SRP) and is located within the Tonto National Forest (TNF), west of the lower Verde River, south of Bartlett Reservoir, and north of the Fort McDowell Mohave-Apache Indian Community. At the request of Reclamation, ACS conducted an intensive cultural resources survey...


Class III Cultural Resources Survey of Reclamation Withdrawn Lands along the Lower Verde River: Needle Rock Survey: Photos (2000)
IMAGE M. McCurdy. S. Reichardt.

The Bureau of Reclamation (Reclamation) has identified approximately 4,514 acres of land for a Class III (intensive) cultural resource survey for Section 110 inventory purposes. The land was withdrawn for the Salt River Project (SRP) and is located within the Tonto National Forest (TNF), west of the lower Verde River, south of Bartlett Reservoir, and north of the Fort McDowell Mohave-Apache Indian Community. At the request of Reclamation, ACS conducted an intensive cultural resources survey...


Class III Cultural Resources Survey of Reclamation Withdrawn Lands along the Lower Verde River: Needle Rock Survey: Report (2004)
DOCUMENT Full-Text Uploaded by: Claudine Gravel-Miguel

The Bureau of Reclamation (Reclamation) has identified approximately 4,514 acres of land for a Class III (intensive) cultural resource survey for Section 110 inventory purposes. The land was withdrawn for the Salt River Project (SRP) and is located within the Tonto National Forest (TNF), west of the lower Verde River, south of Bartlett Reservoir, and north of the Fort McDowell Mohave-Apache Indian Community. At the request of Reclamation, ACS conducted an intensive cultural resources survey...


A Class III Section 110 Cultural Resources Survey of 970 Acres of Bureau of Reclamation Withdrawn Lands Along the Verde River, Prescott National Forest, Yavapai County, Arizona
PROJECT Mark Hackbarth. Michael Terlep. Ted Tsouras. USDI Bureau Reclamation, Phoenix Area Office.

The Bureau of Reclamation (Reclamation) identified approximately 970 acres of land for a Class III cultural resource survey for Section 110 inventory purposes. The land was withdrawn for the Salt River Project and is located within the Prescott National Forest (PNF), south of Camp Verde. At the request of Reclamation, Logan Simpson conducted an intensive cultural resources survey of the project area to provide baseline cultural resource data to assist in the development of density models for...


A Class III Section 110 Cultural Resources Survey of 970 Acres of Bureau of Reclamation Withdrawn Lands Along the Verde River, Prescott National Forest, Yavapai County, Arizona: Report (2016)
DOCUMENT Full-Text Michael Bryk. Ted Tsouras. Michael Terlep.

At the request of Reclamation, Logan Simpson conducted an intensive cultural resources survey of the project area to provide baseline cultural resource data to assist in the development of density models for planning and resource management purposes. The survey was conducted under PNF Permit No. PNF72 between November 17, 2015 and December 6, 2015. Logan Simpson identified four previously recorded sites, 38 newly recorded sites. and 35 Isolated Occurrences. One site (AR-03-09-05-569) was...


A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
DOCUMENT Full-Text Alfred E. Dittert. Paul R. Fish. Don E. Simonis.

The Central Arizona Project (CAP) was authorized by the Colorado River Basin Act (P.L. 90-537) in 1968. The following year, the Department of Anthropology at Arizona State University conducted a survey of the preliminary alignment of the Granite Reef Aqueduct and portions of the Salt-Gila Aqueduct for the Bureau of Reclamation under a National Park Service contract. The feasibility alignment extended from the Agua Fria River, southeast to the Gila River and was divided into eight sections: four...


A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
DOCUMENT Full-Text Alfred E. Dittert, Jr.. Paul R. Fish. Don E. Simonis.

One of several construction programs proposed for inclusion in the Central Arizona Project was a system of aqueducts to link Parker Dam on the Colorado River in western Arizona and the Charleston Damsite on the San Pedro River in southeastern Arizona. Since the possibility existed that archaeological remains might be destroyed by necessary subjugation of lands for the aqueduct, the Southwest Archaeological Center of the National Park Service, U. S. Department of the Interior, made arrangements...


A Cultural Resource Survey Report and Archaeological Monitoring and Discovery Plan for the Salt River Project 69-kV Transmission Line Pole Replacement Between Rio Verde and Fountain Hills, Maricopa County, Arizona (2005)
DOCUMENT Full-Text Jodi Strohmayer.

Salt River Project (SRP) maintains a 69-kilovolt (kV) transmission line between the Glenbrook substation in  Fountain  Hills  and  the  Rio  Verde  substation  in  the  community  of Rio  Verde  in  Maricopa  County, Arizona  (Figure  1).  The  transmission  line  is  currently  supported  by  30-year-old  wooden  poles,  which generally follow the alignment of McDowell Mountain Road.  In order to improve the overall  safety and durability of the transmission line, SRP intends to replace all of...


Cultural Resources Survey of a Portion of Dead Horse Ranch State Park, and a Proposed Alignment for a New Access Road in Yavapai County, Arizona (1991)
DOCUMENT Full-Text M. Zyniecki. Thomas N. Motsinger.

An archaeological survey of a portion of Dead Horse Ranch State Park, Yavapai County, Arizona, was completed for the Arizona Department of Transportation and Arizona State Parks by SWCA, Inc., Environmental Consultants, under contract to Entranco Engineers, Inc., in July 1990. The project was undertaken for a proposed new access road to the park and a bridge across the Verde River as well as for proposed improvements within the park. Sites AZ N:4:18 (ASM) and AZ N:4:31 (ASM) had been formally...


Data Recovery at Four Sites in Dead Horse Ranch State Park, Yavapai County, Arizona (1996)
DOCUMENT Full-Text Karolyn Jackman Jensen. Barbara S. MacNider. Mac McDonnell. Jerryll Moreno. John Rapp. Teresa L. Hoffman.

A data recovery program was completed at four archaeological sites (AZ N:4:37 [NA 25,511], N:4:65 [NA 25,512], N:4:66 [NA 25,513], and N:4:68(ASM) [NA 25,514]) by Archaeological Consulting Services, Ltd. (ACS) for the Phase 3 Roadway Improvement Project (North Campground Facilities) at Dead Horse Ranch State Park (Park) (Figure 1.1). This program represents the last of a series of mitigation actions conducted for an undertaking sponsored by the Arizona Department of Transportation (ADOT) and...


Dead Horse Ranch State Park: An Archeological Overview (1988)
DOCUMENT Full-Text Timothy J. Price.

On February 27, 1974, the Arizona State Parks Board adopted a Master Plan for Dead Horse State Ranch. The park covers some 320 acres. Though the proposed development plan has been altered on several occasions, it has included the construction of three man-made lakes for public fishing, the preservation of natural wildlife habitats and archaeological sites with appropriate interpretive programs, as well as the creation of hiking trails to afford recreational opportunities. Camping areas with...


An Evaluation of Historic Cultural Resources in Relation to the Central Arizona Water Control Study (1984)
DOCUMENT Full-Text Lyle M. Stone. James E. Ayres.

This is a final, summary report on historic cultural resources in relation to the Central Arizona Water Control Study (CAWCS). The objectives of the CAWCS were to identify and evaluate alternative measures for flood control and regulatory water storage in Central Arizona in conjunction with construction of the Central Arizona Project. Having considered numerous alternative plans to meet these objectives, the Bureau of Reclamation defined a preferred alternative (Plan...


HAER No. AZ-12, Technical Report: Historic American Engineering Record, Stewart Mountain Dam (1992)
DOCUMENT Full-Text Donald C. Jackson.

This report provides a written narrative of the events leading to the construction of Stewart Mountain Dam on the Salt River, in Central Arizona. Stewart Mountain Dam was constructed by the Salt River Valley Water Users' Association between 1928 and 1930. The dam provides for water storage and hydroelectric power generation.


HAER No. AZ-24, Horseshoe Dam, Technical Report (1991)
DOCUMENT Full-Text Donald C. Jackson. Clayton B. Fraser.

This report provides a written narrative of the events leading to the construction of Horseshoe Dam on the Verde River, in Central Arizona. Horseshoe Dam was constructed between 1944 and 1946 by the Salt River Valley Water Users' Association and the Phelps Dodge Copper Company. The dam provides water storage for irrigation and domestic use.