La Paz County (County) (Geographic Keyword)

1-10 (10 Records)

Archaeological Survey and Investigations Along Reach 1, Granite Reef Aqueduct, Central Arizona Project, La Paz County, Arizona
PROJECT Glen Rice. Patricia E. Brown. USDI Bureau Reclamation, Phoenix Area Office.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 1 and several adjacent roads that would be added or modified for its construction. Reach 1 of the Granite Reef Aqueduct extends about 18 miles from the Buckskin Mountain Tunnel, east to the Bouse Hills Pumping Plant. Following the survey, OCRM archaeologists conducted archaeological investigations...


Archaeological Survey and Investigations Along Reach 2, Granite Reef Aqueduct, Central Arizona Project, La Paz County, Arizona
PROJECT USDI Bureau Reclamation, Phoenix Area Office. Patricia E. Brown. Glen Rice.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 2. Reach 2 of the Granite Reef Aqueduct extends about 18 miles from the Bouse Hills east to Highway 72, near Vicksburg. Following the survey, OCRM archaeologists conducted archaeological investigations at four sites located along Reach 2 to mitigate the adverse effects of disturbance in the project...


Archaeological Survey and Investigations Along Reach 3, Granite Reef Aqueduct, Central Arizona Project, La Paz County, Arizona
PROJECT USDI Bureau Reclamation, Phoenix Area Office. Glen Rice. Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 3. Reach 3 of the Granite Reef Aqueduct extends about 15 miles from Highway 72, northwest of Vicksburg, southeast to Hovatter Road, south of Interstate 10. Following the survey, OCRM archaeologists conducted archaeological investigations at six sites located along Reach 3 to mitigate the adverse...


Archaeological Survey and Investigations Along Reach 4, Granite Reef Aqueduct, Central Arizona Project, La Paz County, Arizona
PROJECT Glen Rice. Patricia E. Brown. USDI Bureau Reclamation, Phoenix Area Office.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of Reach 4 and several access roads that would be modified for its construction. Reach 4 of the Granite Reef Aqueduct extends about 14 miles from the Hovatter Road exchange with Interstate 10 to the Centennial Wash Siphon Outlet. Following the survey, OCRM archaeologists conducted archaeological investigations...


Archaeological Survey and Investigations Along Reach 5A, Granite Reef Aqueduct, Central Arizona Project, Yuma and Maricopa Counties, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University completed an archaeological survey to identify and evaluate the cultural resources in the area of a flood water detention basin along Reach 5A of the Granite Reef Aqueduct, upslope from the aqueduct right-of-way, and then conducted archaeological investigations at four sites to mitigate the adverse effects of the detention basin. This project...


Archaeological Survey and Investigations Along the Bouse Hills-Harcuvar-Little Harquahala 115 kV Transmission Lines, Granite Reef Aqueduct, Central Arizona Project, La Paz County, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office. Glen Rice. Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of the Bouse Hills-Harcuvar-Little Harquahala 115 kV transmission lines. The Bouse Hills-Harcuvar Transmission Line stretches 23.3 miles from the Harcuvar Substation to the Bouse Hills Pumping Plant. The Harcuvar-Little Harquahala Transmission Line stretches 41.7 miles from the Harcuvar Substation to the Little...


Archaeological Survey and Investigations Along the Liberty-Parker-Hassayampa Transmission Line, Granite Reef Aqueduct, Central Arizona Project, La Paz and Maricopa Counties, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office. Glen Rice. Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of realigned portions of the Liberty-Parker and Parker-Havasu 230 kV transmission line, a 100 meter wide corridor adjacent to the non-realigned portions of the Liberty-Parker 230kv transmission line, the Liberty-Parker-Hassayampa 115kV transmission line, and the Harcuvar Substation. In total OCRM surveyed 115...


Archaeological Survey and Investigations of the Havasu Pumping Plant Borrow Area, Mohave County, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office. Glen Rice. Patricia E. Brown.

Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of the Havasu Pumping Plant borrow area of the Granite Reef Aqueduct. The Havasu Pumping Plant borrow area is about 3 miles east of the pumping plant site. The Havasu Pumping Plant lifts water from the Bill Williams arm of Lake Havasu to the Buckskin Mountains Tunnel. Following the survey, OCRM archaeologists...


A Class I Cultural Resources Records Review for the 3,418-acre Planet Ranch Property for the U.S. Bureau of Reclamation-Lower Colorado Regional Office, La Paz and Mohave Counties, Arizona
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation (Reclamation) plans to acquire rights to a 3,418-acre parcel of Planet Ranch to create a protected riparian area in order to comply with the Lower Colorado River Multi-Species Conservation Program (LCR MSCP). The LCR MSCP is a 50-year federal and non-federal partnership created to balance the use of the Lower Colorado River water resources and to conserve the native species and habitats in order to comply with the Endangered Species Act. In February 2005, the...


The Hayden Rhodes Large Site Resurvey Phase II
PROJECT Erin Davis. USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Logan Simpson Design, Inc. was asked to relocate and record 5 sites that...