Pinal (County) (Geographic Keyword)

126-150 (315 Records)

A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
DOCUMENT Full-Text Uploaded by: Sulgi Lotze

Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...


A Class I Cultural Resources Records Search for the Proposed Salt River Project Copper Crossing Energy Center, Florence, Pinal County, Arizona (2016)
DOCUMENT Full-Text Gina S. Gage.

Under contract to Salt River Project Agricultural Improvement and Power District (SRP), Northland Research, Inc. (Northland) has completed a Class I cultural resources records search for the proposed SRP Copper Crossing Energy Center (CCEC) generating station located in the Town of Florence, Pinal County, Arizona. The new generating station is intended to meet SRP's projected growth in demand for power. The purpose of this Class I review is to identify and assess any cultural resources located...


Class I Overview for Tier 1 Planning of Interstate 11, Nogales to Wickenburg, Arizona - Archaeological Sites and Historic Structures (2018)
DOCUMENT Full-Text Douglas R. Mitchell. Andrea Gregory. Tom Jones. Kristin L. David. Zachary Rothwell.

In December 2015, the United States (US) Congress approved the Fixing America's Surface Transportation Act, which authorized a 5-year program to improve the Nation's surface transportation infrastructure. The Act formally designated Interstate 11 (1-11) through Arizona. The Federal Highway Administration (FHWA) and Arizona Department of Transportation (ADOT) are preparing a Draft Tier 1 Environmental Impact Statement (EIS) for the I-11 corridor between Nogales and Wickenburg, Arizona, pursuant...


Class I Overview for Tier 1 Planning of Interstate 11, Nogales to Wickenburg, Arizona - Historic Districts and Buildings (2018)
DOCUMENT Full-Text Don W. Ryden. J. Erik Ryden. Jamie Jachowski.

In December 2015, the United States (US) Congress approved the Fixing America's Surface Transportation Act, which authorized a 5-year program to improve the Nation's surface transportation infrastructure. The Act formally designated Interstate 11 (I-11) through Arizona. The Federal Highway Administration (FHWA) and Arizona Department of Transportation (ADOT) are preparing a Tier 1 Environmental Impact Statement (EIS) for the I-11 Corridor Study Area (Study Area) between Nogales and Wickenburg,...


A Class I Previous Cultural Resources Records Review of the Salt River Project Southeast Power Link Project Study Area Located in Maricopa and Pinal Counties, Arizona (2018)
DOCUMENT Full-Text Sarah Luchetta. Jim Moses.

At the request of Derrik Berg of KP Environmental, Antigua Archaeology, LLC (Antigua) conducted a Class I (previous cultural resources records review) of the Salt River Project Southeast Power Link Project (Figure 1). The Project Study Area (PSA) is located southeast of Phoenix in Maricopa and Pinal Counties, Arizona. Antigua Archaeology, LLC has conducted a Class I (records search) of the Salt River Project Southeast Power Link project area located southeast of Phoenix in Maricopa and Pinal...


Class III Cultural Resource Inventory of 175.4 Acres for the Salt River Project Abel-Pfister-Ball 230kV Transmission Line in the City of Mesa, the Towns of Gilbert and Queen Creek, and the San Tan Valley, Maricopa and Pinal Counties, Arizona (2022)
DOCUMENT Full-Text Jennifer K. Deats. Ximena Lemoine. Thomas Grew. Matthew Steber. Joshua Steinbeck.

To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project would connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen Creek, and the Abel Substation east of San Tan Valley. This Project was approved by the...


A Class III Cultural Resource Survey of Approximately 20.7 Acres at Boyce Thompson Arboretum State Park, Pinal County, Arizona (2017)
DOCUMENT Full-Text Will Russell.

Boyce Thompson Southwestern Arboretum (BTA), a 501(c)(3), non-profit organization, owns a portion of the land within Boyce Thompson Arboretum State Park (BOTH). At the request of BTA, this office completed a Class III cultural resource survey of approximately 20.7 ac of this property in September of 2017. Survey encountered one previously recorded site and one site which had not been previously recorded. In addition, nine IOs were encountered


A Class III Cultural Resource Survey of the Proposed Desert Basin South Gas Pipeline, Casa Grande, Pinal County, Arizona (2000)
DOCUMENT Full-Text S. Jerome Hesse.

On September 25, 2000, SWCA, Inc. completed a Class ID cultural resources survey for an approximately 7-mile long gas pipeline alignment near Casa Grande, Pinal County, Arizona. The purpose of the survey was to determine if any cultural resources existed that may be adversely impacted by the installation and maintenance of a proposed gas pipeline from Reliant Energy's Desert Basin Generating Facility on Burris Road south approximately seven miles to an existing El Paso Natural Gas pipeline. This...


Class III Cultural Resources Survey for the Salt River Project 115kV Coolidge to Hayden Electrical Transmission Line Right-of-Way Easement Renewal in District 1 of the Gila River Indian Community, Pinal County, Arizona (2015)
DOCUMENT Full-Text Craig M. Fertelmes.

This document presents the results of a Class III cultural resources survey with management recommendations for the Salt River Project’s (SRP) 115kV Coolidge to Hayden electrical transmission line right-of-way (ROW) in District 1 of the Gila River Indian Community (GRIC), Pinal County, Arizona. The survey was completed by the GRIC Cultural Resources Management Program (CRMP; Project No. 2015.16sl), at the request of SRP, and in compliance with Section 106 of the National Historic Preservation...


A Class III Cultural Resources Survey of 12.49 Acres for Two SRP Distribution Lines in the Mesa and Globe Ranger Districts, Tonto National Forest, Maricopa and Pinal Counties, Arizona (2020)
DOCUMENT Full-Text David Zimmerman.

At the request of SRP, North Wind Resource Consulting, LLC (North Wind) conducted a Class III cultural resources survey of 12.49 acres for two distribution lines and access routes on land managed by TNF the in the Mesa and Globe Ranger Districts in Maricopa and Pinal Counties, Arizona. The surveys were requested to address areas where SRP lacks surveys of its facilities and access routes. As a result of routine line inspections, SRP has identified three poles (Numbers 11879, near Apache...


A Class III Cultural Resources Survey of 7.58 Acres for Campground Improvements at the Lost Dutchman State Park, Apache Junction, Pinal County, Arizona (2013)
DOCUMENT Full-Text Sophia Kelly.

Arizona State Parks Development plans to install a new camping area at Lost Dutchman State Park north of Apache Junction in Pinal County, Arizona. The proposed camping area is located in the southeastern section of the park off an existing paved road. The Area of Potential Effect (APE) for the camping area construction project is approximately 7.58 acres. Because the parcel is on state land, a cultural resources inventory must be completed before construction can proceed pursuant to Arizona...


A Class III Cultural Resources Survey of the Salt River Project 230-kV and 500-kV Transmission Line Rights-of-Way from Silver King to the Western Forest Boundary, Tonto National Forest, Mesa and Globe Districts, and Private Lands near Superior, Pinal County, Arizona (2020)
DOCUMENT Full-Text Branden R. Fjerstad. Paul Rawson. Jerome Hesse. Christopher Papalas. Eric Petersen. Caitlin Hayden.

SRP contracted SWCA Environmental Consultants (SWCA) to conduct a Class III cultural resources survey along a 15.1-mile-long stretch of the Goldfield-Silver King 230-kilovolt (kV) and Browning to Silver King 500-kV electrical transmission line right-of-way (ROW) in Pinal County, Arizona. The purpose of the survey was to identify cultural resources that are listed in or eligible for listing in the National Register of Historic Places (NRHP) so that SRP can take the necessary measures to avoid or...


Class III Cultural Resources Survey Report: Carrel Interconnection Project, Pinal County, Arizona (2005)
DOCUMENT Full-Text Beau J. Goldstein.

On October 20, 2004, Transcon Infrastructure, Inc. (Transcon) conducted a Class III (Intensive Field Inventory) cultural resources survey of approximately 28 acres for the proposed construction of an electrical distribution substation and transmission line interconnection in the vicinity of Apache Junction, Pinal County, Arizona. Four transmission line alternatives, each with a 200 foot wide right-of-way (ROW), are being considered for interconnection with an existing 115kV transmission line....


Cultural Resource Evaluation of Proposed Temporary Construction Use Area and Access Road (Site 3), for Kyrene to Silver King Link of Kyrene to Coronado 500kV Transmission Line (1977)
DOCUMENT Full-Text Lyle M. Stone.

On December 22, 1977, Lyle M. Stone of Archaeological Research Services performed a cultural resource evaluation of a 1.2 mile long road and an approximate 10 acre area. The road will be used for access to a 660 foot square temporary construction use area (Site 3) which is adjacent to the Kyrene to Silver King link of the Kyrene to Coronado 500 kV transmission line being constructed by Salt River Project. This evaluation was conducted on behalf of Salt River Project in order to determine if...


A Cultural Resource Inventory of the Santan Expansion Project Natural Gas Pipe Line, Maricopa and Pinal Counties, Arizona (2002)
DOCUMENT Full-Text John M. Lindly. Douglas R. Mitchell. Cynthia Keller.

The project involves an archaeological survey conducted along a proposed 36-mile natural gas pipeline corridor and associated facilities. The proposed gas line is part of the Salt River Project Santan Expansion Project. The corridor includes lands under the jurisdiction of the Arizona State Land Department (state-owned and leased), Maricopa and Pinal Counties, private land, Municipalities, and SRP-owned land.


Cultural Resource Overview for the Arizona Portion of the All-American Pipeline and Brenda Alternative (1984)
DOCUMENT Citation Only Richard W. Effland, Jr.. Margerie Green.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


A Cultural Resource Survey for a Proposed Evaporation Pond, Pinal County, Arizona (2001)
DOCUMENT Full-Text Sharon K. Bauer. A.E. (Gene) Rogge.

Reliant Energy, Inc. (Reliant) is planning to construct an evaporation pond just to the east of evaporation ponds recently completed for the Desert Basin Power Plant. The U.S. Army Corps of Engineers (COE) has purview over the "jurisdictional waters of the United States" on the proposed evaporation pond site, and construction of the ponds will require a permit from the COE under Section 404 of the Clean Water Act. The COE must comply with Section 106 of the National Historic Preservation Act in...


A Cultural Resource Survey of 160 Acres for a Proposed Prison Facility at the ASPC - Special Management Unit Near Florence, Pinal County, Arizona (1993)
DOCUMENT Full-Text R. Thomas Euler.

On September 21, 1993, archaeologists from SWCA, Inc., Environmental Consultants of Tucson, Arizona, conducted an intensive archaeological survey of approximately 160 acres for a proposed prison expansion. The purpose of these investigations is to locate and describe all cultural resources within the parcel that might be adversely affected by construction of the proposed Special Management Unit prison facility. The entire quarter section in which the project area is located was surveyed. The...


Cultural Resource Survey of a 4 Mile (6.4 Kilometer) Transect Along the Maricopa-Pinal County Line, Central Arizona; a Survey For a Subsidence Test Well Project Along the Salt-Gila Aqueduct, Central Arizona Project (1978)
DOCUMENT Citation Only A. Gene Rogge.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Cultural Resource Survey of a Portion of the Hayden to Coolidge Power Line, Near Coolidge, Pinal County, Arizona (1996)
DOCUMENT Full-Text Johna Hutira.

Northland Research, Inc. (Northland) was contracted by Salt River Project (SRP) to perform a Class III cultural resources survey (Arizona Antiquities Act Permit 96-61-BL) of a portion of the Hayden to Coolidge Power Line which crosses through the known boundaries of the prehistoric Hohokam Grewe site (AZ AA:2:2[ASM]). The survey was conducted on a 500 ft (152 m) long by 66 ft (20 m) wide stretch of land, covering .23 acres, located north of Coolidge, Arizona. The work was conducted on 23 May...


Cultural Resource Survey of Proposed 12kV Distribution Line Right-of-Way in Section 5, T2S, R10E Near Florence Junction, Pinal County, Arizona (1985)
DOCUMENT Full-Text Lyle E. Stone.

On July 9, 1985, Lyle M. Stone of Archaeological Research Services, Inc. (ARS) performed a cultural resource survey of a 5777 ft long by 10 ft wide right-of-way for a proposed distribution line located about two miles north-northwest of Florence Junction in Pinal County, Arizona. The survey was requested by Salt River Project in order to determine if cultural resources (prehistoric or historic archaeological sites, historically or architecturally significant structures or build­ings) were...


Cultural Resource Survey of the Alvarado Parcel, Casa Grande, Pinal County, Arizona (2001)
DOCUMENT Full-Text Sharon K. Bauer. David E. Doyel. A. E. (Gene) Rogge.

Reliant Energy has acquired an option to purchase a 40-acre parcel known as the Alvarado property. Reliant is conducting “due diligence” studies that will be considered in deciding whether to purchase the property as a potential industrial development site. Reliant retained URS Corporation to assist in those studies by conducting a Phase 1 environmental site assessment, determining whether there are jurisdictional waters of the United States on the property, evaluating whether special status...


Cultural Resource Survey of the Proposed Pecos-Price Canal Alignment, Santan Extension (Memorial) Management Area, Pima-Maricopa Irrigation Project, Gila River Indian Community, Maricopa and Pinal Counties, Arizona. (1996)
DOCUMENT Citation Only Mark Broadbeck.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


A Cultural Resource Survey of the Proposed Santan to Roosevelt Water Conservation District (RWCD) Canal, Santan Management Area, Pima-Maricopa Irrigation Project (P-MIP), Gila River Indian Community, Arizona (1997)
DOCUMENT Citation Only Robert B. Neily.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


A Cultural Resource Survey of the Salt River Project 47E-1.35S and 45E-1.5S Proposed Substation Sites, Pinal County, Arizona (1996)
DOCUMENT Full-Text Cameron S. Griffith.

Northland Research, Inc. was contracted by Salt River Project to perform a Class III records search and cultural resources survey for two proposed substation sites. The survey was conducted on two separate parcels (Areas 1 and 2) located south of Siphon Draw, on state trust lands administered by the Arizona State Land Department. In addition to the parcels to be purchased, Northland examined a 50 ft. buffer zone on all four sides of each parcel (Areas 1B and 2B, respectively). Area 1 and 1B...