Hohokam Village (Geographic Keyword)

1-3 (3 Records)

Archaeological Monitoring of the Salt River Project Kyrene Expansion Project Waterlines and Landscaping, Tempe, Maricopa County, Arizona (2002)
DOCUMENT Full-Text John M. Lindly. Michael S. Foster. Douglas R. Mitchell. Cara Schmidt.

This report presents the results of archaeological monitoring at a project area located at the northeast comer of Kyrene and Elliot Roads in Tempe, Arizona. The monitoring was conducted during waterline construction and landscaping around the Kyrene Generating Station at the request of Salt River Project. The project area is located adjacent to and within the boundaries of the Hohokam village site of Los Guanacos (AZ U:9:116 [ASM]), located in Section 10, T1S R4E, Gila and Salt River Baseline...


Kyrene Data Recovery Preliminary Field Report (For the North Half of the Pole Yard Locus) (2001)
DOCUMENT Full-Text SWCA Environmental Consultants. Salt River Project.

This document is the preliminary report on archaeological data recovery at a portion of the Hohokam village of Los Guanacos (AZ U:9:116 [ASM]). Salt River Project (SRP) is proposing to construct a new generating station adjacent to the existing Kyrene Generating Station in Tempe, Arizona. Prior to construction of the generating station, SRP implemented an archaeological data- recovery project within the proposed project area (Figure 1) and contracted with SWCA, Inc., Environmental Consultants...


Preliminary Report on Data Recovery Efforts at the Crismon Ruin, AZ U:9:173 (ASM), Within the Proposed Red Mountain Freeway Corridor, Mesa, Arizona (2001)
DOCUMENT Full-Text T. Kathleen Henderson. Tiffany C. Clark.

The purpose of this report is to summarize the methods and findings of Desert Archaeology, Inc.'s, recent data recovery effort at the Crismon Ruin, due to be impacted by construction of the Red Mountain Freeway, Gilbert Road to Higley Road segment; and to provide a recommendation that the Arizona Department of Transportation (ADOT) be allowed to proceed with construction activities as planned in said freeway corridor. The project was authorized by the Federal Highway Administration and ADOT, as...