Tempe Canal Company (Other Keyword)

1-3 (3 Records)

Consolidated Canal, Chandler Power Plant - AZ-55-B - Written Historical and Descriptive Data, Photographs (2023)
DOCUMENT Full-Text Catherine L. May. SRP Research Archives Department.

The Chandler Power Plant was constructed by the Consolidated Canal Company as a power source for supplemental groundwater production in the Southeast Salt River Valley. It also provided power to Tempe, Arizona and Mesa, Arizona. By World War I, the plant was incorporated into the SRP power system. The plant operations ceased in 1950. The Consolidated Canal was a relative latecomer to the southside canal system, and the water-rights claims made by earlier settlers took precedence over any...


The Early History of the Tempe Canal Company (1965)
DOCUMENT Full-Text Christine Lewis.

In 1892 Judge Joseph H. Kibbey, one of Arizona's illustrious pioneers, described the Salt River Valley before the settlers came as a desert, uninhabited except by jack rabbits, coyotes, and rattlesnakes. Its main vegetation was sagebrush and cactus. It was a level, fertile valley about fifteen miles wide, through which the Salt River flowed west for forty miles to its junction with the Gila. The Salt River was a fluctuating stream. Sometimes it was a raging torrent which flooded the level land...


HAER No. AZ-16, Tempe Canal, South Side of Salt River, Tempe, Mesa and Phoenix, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data (1989)
DOCUMENT Full-Text Fred Andersen.

Historic American Engineering Record (HAER) No. AZ-16 presents a written historical summary and relevant historical documentation about the construction and use of the Tempe Canal, which provides irrigation waters to the Southeast valley cities of Tempe, Mesa, and Chandler, Arizona. The report contains a narrative description, photographs, drawings, and maps. The oldest canal in continuous use in the Salt River Valley, the Tempe Canal is the site of early hydropower projects and the last...