In May 2015, PacifiCorp (doing business as Rocky Mountain Power, Proponent) requested that SWCA Environmental Consultants conduct archaeological laboratory analyses and report preparation from data recovery testing and excavations conducted for the Sigurd to Red Butte No. 2 – 345kV Transmission Project (Project).The 277.32-kilometer (172.32-mile) Sigurd to Red Butte No. 2 – 345-kilovolt (kV) transmission line runs from the existing Sigurd Substation in Sevier County, Utah, to the existing Red...
Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Millard County (2017)
IMACS site forms for sites in Millard County investigated as part of the Sigurd to Red Butte No. 2 – 345kV Transmission Project.
Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 3 Appendix A: Level II Historic Documentation Packets (2017)
Level II historic documentation packets for historic sites investigated as part of the Sigurd to Red Butte No. 2 – 345kV Transmission Project.