Basketmaker III (Temporal Keyword)

251-275 (4,629 Records)

5MT10631, Photo #23835, Plan view (2016)
IMAGE Rebecca (Becca) Simon.

Representative sample of sandstone slabs from Structure 102 (pithouse antechamber).


5MT10631, Photo #23836, Plan view (2016)
IMAGE Rebecca (Becca) Simon.

Representative sample of sandstone slabs from Structure 102 (pithouse antechamber).


5MT10631, Photo #23837, Plan view (2016)
IMAGE Rebecca (Becca) Simon.

Possibly abraded sandstone slab not in situ, but pulled from Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23838, Plan view (2016)
IMAGE Rebecca (Becca) Simon.

Possibly abraded sandstone slab not in situ, but pulled from Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23839, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Pieces of of Feature 4 (wing wall) that broke off during excavation and not in situ, but recovered from the southeast quadrant of Structure 101 (pithouse main house).


5MT10631, Photo #23840, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Pieces of of Feature 4 (wing wall) that broke off during excavation and not in situ, but recovered from the southeast quadrant of Structure 101 (pithouse main house).


5MT10631, Photo #23841, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

In progress views of Features 3 and 4, as well as pre-excavation view of Feature 6. All features in Surface 1 of Structure 114 (pithouse additional room).


5MT10631, Photo #23842, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

In progress views of Features 3 and 4, as well as pre-excavation view of Feature 6. All features in Surface 1 of Structure 114 (pithouse additional room).


5MT10631, Photo #23843, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 7, 8, and 9 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23844, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Features 7, 8, and 9 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23845, Plan view, feature before excavation (2016)
IMAGE Steve Copeland.

Features 7 and 8 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23846, Plan view, feature before excavation (2016)
IMAGE Steve Copeland.

Feature 9 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23847, Plan view, feature before excavation (2016)
IMAGE Steve Copeland.

Features 7 and 8 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23848, Plan view, feature before excavation (2016)
IMAGE Steve Copeland.

Features 7 and 8 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23849, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 7 Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23850, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 7 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23851, Plan view, feature (2016)
IMAGE Steve Copeland.

Close-up of base of Feature 7 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23852, Profile view, feature (2016)
IMAGE Steve Copeland.

Close-up of profile of Feature 7 in Surface 1 in the northeast quadrant of Structure 101 (pithouse main chamber).


5MT10631, Photo #23853, Plan view, feature (2016)
IMAGE Rebecca (Becca) Simon.

Excavation in progress of Features 3, 4, and 6 in Surface 1 in Structure 114 (pithouse additional room).


5MT10631, Photo #23854, Plan view, feature before excavation (2016)
IMAGE Rebecca (Becca) Simon.

Feature 7 in Surface 1 of Structure 114 (pithouse additional room).


5MT10631, Photo #23855, Plan view, feature before excavation (2016)
IMAGE Caitlin Sommer.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Feature 7 is visible and was dug into Feature 8.


5MT10631, Photo #23856, Plan view, feature before excavation (2016)
IMAGE Caitlin Sommer.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Feature 7 is visible and was dug into Feature 8.


5MT10631, Photo #23857, Plan view, feature before excavation (2016)
IMAGE Daniel Hampson.

Feature 10 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Note rodent disturbance to the west and south.


5MT10631, Photo #23858, Plan view, feature before excavation (2016)
IMAGE Daniel Hampson.

Feature 10 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Note rodent disturbance to the west and south.


5MT10631, Photo #23859, Plan view, feature (2016)
IMAGE Steve Copeland.

Feature 8 in Surface 1 of the northeast quadrant of Structure 101 (pithouse main chamber). Includes depressed area to the east.