San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project


Resources Inside This Collection (Viewing 1-51 of 51)

China Wash Flume Historic American Engineering Record, Pinal County, Arizona
  1. China Wash Flume Historic American Engineering Record, Pinal County, Arizona
  2. China Wash Flume Documentation Report (2016)
  3. China Wash Flume Historic American Engineering Record GIS (2016)
  4. Historic American Engineering Record: China Wash Flume (2016)
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona
  1. Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona
  2. Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Photo (2009)
  3. Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Report (2009)
Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona
  1. Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona
  2. Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona: Photo Log (2010)
  3. Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona: Photos (2010)
  4. Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona: Report (2010)
Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3
  1. Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3
  2. A Class III Cultural Resource Survey for the San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project in Reach 1 of the SCIDD and Joint Works Irrigation Facilities, Pinal County, Arizona. (2017)
  3. A Class III Cultural Resource Survey for the San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project in Reach 2 of the SCIDD and Joint Works Irrigation Facilities, Pinal County, Arizona. (2017)
  4. A Class III Cultural Resource Survey for the San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project in Reach 3 of the SCIDD and Joint Works Irrigation Facilities, Pinal County, Arizona. (2017)
  5. Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3: Photos (2017)
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
  1. A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
  2. A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona
  1. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona
  2. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Artifact Analysis Data (2022)
  3. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Photo Log and Contact Sheets (2022)
  4. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Project Area Shapefiles (2022)
  5. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Report (2022)
  6. Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Site Boundary Shapefiles (2022)
Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
  1. Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
  2. Addendum Report to the Class III Survey Along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation: Report (2014)
  3. Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photo Log (2012)
  4. Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photos (2011)
  5. Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Report (2012)
Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
  1. Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
  2. Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photo Log (2012)
  3. Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
  4. Preliminary Report for Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2011)
Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona
  1. Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona
  2. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Ceramic Analysis Data (2016)
  3. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Faunal Analysis Data (2016)
  4. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Lithic Analysis Data (2016)
  5. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Photo Log and Contact Sheets (2016)
  6. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Report (2016)
  7. Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Shell Analysis Data (2016)
Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
  1. Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
  2. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Ceramic Data (2012)
  3. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Flotation Data (2012)
  4. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Lithic Data (2012)
  5. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photolog (2012)
  6. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
  7. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Pollen Data (2012)
  8. Final Report for Phased Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Pages (2012)
  9. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Report (2012)
  10. Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Shell Data (2012)
  11. Letter Preliminary Report of Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2012)