Dolores Project - Dove Creek Canal Reach II Fairview Pumping Plant; Cahone Pumping Plant and Dove Creek Canal Reach I.
Author(s): Mary Erickson Ives Gay A
Year: 1983
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Dolores Project - Dove Creek Canal Reach II Fairview Pumping Plant; Cahone Pumping Plant and Dove Creek Canal Reach I.. Mary Erickson Ives Gay A. 1983 ( tDAR id: 303915)
Keywords
Investigation Types
Reconnaissance / Survey
Geographic Keywords
08083 (Fips Code)
•
Colorado (State / Territory)
•
Montezuma (County)
•
North America (Continent)
•
United States of America (Country)
Spatial Coverage
min long: -109.046; min lat: 36.999 ; max long: -107.969; max lat: 37.64 ;
Individual & Institutional Roles
Prepared By(s): Bureau of Reclamation-Upper Colo Region
Record Identifiers
NADB document id number(s): 622201
NADB citation id number(s): 000000350341
Notes
General Note: Sent from: Bureau of Reclamation-Upper Colo Region