Browse all Documents in tDAR
-
A Phase I Cultural Resources Assessment of the Proposed Alabama Port Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Albertville Cellular Tower, Near Albertville, Marshall County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Altadena Woods Cellular Tower in Hoover, Shelby County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Apple Grove Cellular Tower Near Laceys Spring, Morgan County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Ardmore Cellular Tower in Ardmore, Limestone County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Ashland Sewer Line in Clay County, Alabama (1998)
-
A Phase I Cultural Resources Assessment of the Proposed Athens West Cellular Tower in Athens, Limestone County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Barber's Lake Impoundment at Leeds, Jefferson County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Battles Landing Development Near Point Clear, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Bay Bridge Road Cellular Tower and Visual Impact Area, Mobile County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Bay Gas 11 Mile Loop Pipeline Mobile and Washington Counties, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Beaver Creek, LLC Development in Orange Beach, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed BIR Boyles Cellular Tower in Birmingham, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed BIR Industrial Cellular Tower in Birmingham, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Black Warrior Cellular Tower Near Demopolis, Greene County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Blards Cellular Tower Near Brent, Bibb County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Bridge Replacement on County Road 1043 Over Blevens Creek, Cullman County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Bridge Replacement on County Road 234 Over Dry Creek, Talladega County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Bridge Replacement Over Turkey Creek, Jefferson County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Brookley Cellular Tower in Mobile, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Browns Cellular Tower in Browns, Dallas County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Burwell Springs Cellular Tower Near Huntsville, Madison County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Castleberry Cellular Tower in Castleberry, Conecuh County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Chelsea Park Cellular Tower in Huntsville, Madison County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Coalmont Cellular Tower Site in Shelby County, Alabama (1998)
-
A Phase I Cultural Resources Assessment of the Proposed Construction Site of a Telecommunications Tower in Blount County, Alabama (Palmerdale Site) (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Construction Site of a Telecommunications Tower in Blount County, Alabama (Remlap Site) (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Construction Site of a Telecommunications Tower in Colbert County, Alabama (Milk Springs Site) (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Construction Site of a Telecommunications Tower in Elmore County, Alabama (Site 2) (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Construction Site of a Telecommunications Tower in Limestone County, Alabama (Morris Springs Site) (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Cottage Hill Park Cellular Tower in Mobile, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Crossbrook Farms Cellular Tower Near Chelsea, Shelby County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Cunningham Lake in Washington County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Dawes Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Dog River Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed East Bay Minette Cellular Tower and Visual Impact Area, Baldwin County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Eight Mile Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed El Dorado Park Cellular Tower in Roebuck, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Exit 13 Cellular Tower Near Theodore, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Extension of Highway 13, Baldwin County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Garden City Cellular Tower Near Garden City, Blount County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Gay Bridge Replacement Project, Jackson County, West Virginia (1994)
-
A Phase I Cultural Resources Assessment of the Proposed Gayles Celllular Tower Near Marion in Perry County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Geraldine Cellular Tower in Geraldine, DeKalb County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Ginch Cellular Tower Near Summerdale, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Glenwood Gem Cellular Tower in Huntsville, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Grady Radio Tower Near Grady, Montgomery County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Grand Bay Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Green Bay Cellular Tower Near Opp, Covington County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Guntersville Cellular Tower Near Scottsboro, Jackson County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Hayneville Hammond Cellular Tower Near Hayneville in Lowndes County, Alabama (2000)
-
Phase I Cultural Resources Assessment of the Proposed Heath Nature Trail, Hoback Park, City of Heath, Licking County, Ohio (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Highland Home Cellular Tower Near Highland Home, Crenshaw County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Highway 78 Cellular Tower Near Twin, Marion County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Hokes Bluff / Firestone Cellular Tower in Hokes Bluff, Etowah County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Hollis Crossroads Cellular Tower in Randolph County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed HUN Bailey Cove Cellular Tower in Huntsville, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed I-10 AL / FL Border Cellular Tower, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed I-173 / 134 Cellular Tower Site Near Headland, Henry County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Indian Springs Cellular Tower in Forester, Autauga County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed J. C. Duke Lake, Southern Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Johnson School Cellular Tower in East Limestone County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Kelly Springs Cellular Tower Near Madison, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Kilpatrick Cellular Tower in Painter, DeKalb County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Kirkland Cellular Tower Near Brewton, Escambia County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Knollwood Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Kushla Cellular Tower and Visual Impact Area, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lake Impoundment Tract, St. Clair County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Landersville Cellular Tower Near Moulton, Lawrence County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lanham Bridge Replacement Project, Kanawha County, West Virginia (1994)
-
A Phase I Cultural Resources Assessment of the Proposed Laurendine Cellular Tower in Bellefontaine, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lawrence Cellular Tower Near Cedar Bluff, Cherokee County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Leslie Branch Cellular Tower Near Harvest, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lexington Sewer Treatment Plan in Lauderdale County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Proposed Lexington Sewer Treatment Plant in Lauderdale County, Alabama (1998)
-
A Phase I Cultural Resources Assessment of the Proposed Little Stoney Creek Bridge Replacement Project, Summers County, West Virginia : DRAFT (1993)
-
A Phase I Cultural Resources Assessment of the Proposed Logan Martin Lake II Cellular Tower Near New London, St. Clair County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lowe Cellular Tower and Visual Impact Area, Mobile County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Luverne Cellular Tower Near Rutledge, Crenshaw County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Lyon-Glisson Development Near Daphne, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Madison City Cellular Tower in Madison, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Magby Creek Cellular Tower Near Ethelsville, Pickens County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Markton Cellular Tower Near Southside, Etowah County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Mastin Lake School Cellular Tower in Huntsville, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed McCoy Cellular Tower in Gadsden, Etowah County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed McShan Cellular Tower Near McShan, Pickens County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Meridianville Cellular Tower in Meridianville, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed MOB Dauphin Cellular Tower in Mobile, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed MOB Dog River Celluar Tower in Mobile, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Moody Cellular Tower Near Moody, St. Clair County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Moundville Cellular Tower in Tuscaloosa County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Mount Olive Cellular Tower in Mount Olive, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Mt. Hope Cellular Tower Near Moulton, Lawrence County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Mulberry Cellular Tower Near Mulberry, Autauga County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Muscle Shoals Cellular Tower in Colbert County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Muscle Shoals Cellular Tower in Colbert County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Muscle Shoals Cellular Tower in Colbert County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Narrow Gap Cellular Tower Near Elberta, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed North Courtland Cellular Tower Near Courtland, Lawrence County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed North Gadsden Cellular Tower in Etowah County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Old Spanish Trail Cellular Tower Near Loxley, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Opp Downtown Cellular Tower in Opp, Covington County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Orange Beach Cellular Tower Near Orange Beach, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Owens Cross Roads Cellular Tower in Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Panther Branch Cellular Tower in Western Madison County, Alabama (2001)
-
Phase I Cultural Resources Assessment of the Proposed Pass Chateau Marina Complex, Dauphin Island, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Pearson Avenue Cellular Tower in Birmingham, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Petry Cellular Tower Near Fullers Crossroads, Crenshaw County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Poarch Cellular Tower Near Freemanville, Escambia County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Poley Creek Cellular Tower Near Opp, Covington County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Pugh Hill Cellular Tower Near Grove Hill, Clarke Couunty, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Regency Cellular Tower and Visual Impact Area, Mobile County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Riderville Cellular Tower in Riderville, Chilton County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Risers Mountain Cellular Tower in Talladega County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Riverton Road Cellular Tower Near Moores Mill, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Rocky Ridge Road Development in Hoover, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Roebuck Cellular Tower in Roebuck, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Sewage Disposal Plant Cellular Tower in Huntsville, Madison County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Shades Creek Cellular Tower in Mountain Brook, Jefferson County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Silver Pine Development, Western Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Skyline Acres Cellular Tower Near Madison, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Stedman Cellular Tower Near Florala, Covington County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed STPMB-7518(2) Materials Disposal at the Intersection of Schillinger and Grelot Roads, Western Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Summerdale Cellular Tower and Visual Impact Area, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Summerdale Cellular Tower and Visual Impact Area, Baldwin County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Summit Industries Materials Pit, Baldwin County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Sycamore Church Cellular Tower in Talladega County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Toney Cellular Tower Near Toney, Madison County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Town of Cherokee Water Tank in Colbert County, Alabama (1996)
-
A Phase I Cultural Resources Assessment of the Proposed Trimmer Park Cellular Tower in Mobile, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed TUS Highway 43 Cellular Tower in Northport, Tuscaloosa, Alabama (2001)
-
Phase I Cultural Resources Assessment of the Proposed University Drive Widening Project, West Huntsville, Madison County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Village Creek Cellular Tower in Birmingham, Jefferson County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Vincent Cellular Tower Near Vincent, Talladega County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed West Clanton Cellular Tower in Clanton, Chilton County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed White-Smith Lake in Washington County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Proposed Whitehouse Cellular Tower Near Mon Louis, Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Widening of a Segment of SR-216 Near Brookwood, Tuscaloosa County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Widening of a Two Mile Section of Old Shell Road, Western Mobile, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Widening of Rock Road, Southern Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Wilcox East Cellular Tower and Visual Impact Area, Baldwin County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Wiley Cellular Tower and Visual Impact Area, Conecuh County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Proposed Wills Creek Cellular Tower in Ft. Payne, DeKalb County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Woodland Forrest Cellular Tower in Cottondale, Tuscaloosa County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Proposed Yaupon Cellular Tower and Visual Impact Area, Baldwin County, Alabama (2000)
-
A Phase I Cultural Resources Assessment of the Replacement Bridge Site Over Beeswax Creek on Highway 30, Shelby County, Alabama (1998)
-
A Phase I Cultural Resources Assessment of the Roberts Brothers Property on Cottage Hill Road, Mobile County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the Sanitary Sewer Line Proposed for the City of West Blocton in Bibb County, Alabama (1999)
-
A Phase I Cultural Resources Assessment of the Shoal Creek Bridge Replacement in Shelby County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of the SR 86 Bridge Replacement in Shelby County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the Town of Lexington Hiking Trail Tract (1997)
-
A Phase I Cultural Resources Assessment of the Turner Project on McFarland Drive, Western Mobile County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of the West End Masonic Temple, Birmingham, Alabama (2000)
-
A Phase I Cultural Resources Assessment of Three Proposed Borrow Pits Near Montgomery, Montgomery County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of Three Proposed Soil Disposal Areas Near Dadeville, Tallapoosa County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of Two Proposed Borrow Pits Near Bay Minette, Baldwin County, Alabama (2002)
-
A Phase I Cultural Resources Assessment of Two Proposed Borrow Pits Near Old Town, Conecuh County, Alabama (2001)
-
A Phase I Cultural Resources Assessment of Two Proposed Borrow Pits Near Ozark, Dale County, Alabama (2001)
-
Phase I Cultural Resources Assessment Permit Applicaiton FR:00-300-Multi. Burning Springs Mining Project Area, Wood & Ritchie Counties, West Virginia (2000)
-
Phase I Cultural Resources Assessment Permit Application FR:00-300-Multi. Burning Springs Mining Project Area, Wood & Ritchie Counties, West Virginia (2000)
-
Phase I Cultural Resources Assessment Survey of a Proposed Borrow Pond, Avon Park Air Force Range, Highlands County (2006)
-
Phase I Cultural Resources Assessment Survey of Florida Power and Light Glenn Substation and Transmission Lines Right of Way Corridor, Cape Canaveral Air Force Station, Brevard County, Florida (2017)
-
Phase I Cultural Resources Assessment Survey of Manatee County North Wastewater Treatment Plant and Manatee County Southeast Wastewater Treatment Plant (1985)
-
Phase I Cultural Resources Assessment Survey of Manatee County North Wastewater Treatment Plant, Pursley Tract,..., Manatee County, Florida (1986)
-
Phase I Cultural Resources Assessment Survey of Manatee County Rye Wilderness Park & Youth Ranch, Manatee County, Florida (1987)
-
Phase I Cultural Resources Assessment Survey of Manatee County Southeast Wastewater Treatment Plant (1985)
-
Phase I Cultural Resources Assessment Survey of Manatee County, Southeast Wastewater Treatment Plant Effluent Pipeline Corridor, Manatee County, Florida (1986)
-
Phase I Cultural Resources Assessment Survey of the Carillon Project, a DRI in Section 11, T30S-R16E (1984)
-
Phase I Cultural Resources Assessment Survey of the Joe Bay Project, Lying Within Sections 22 and 27, Township 33 South, Range 17 East, Terra Ceia Island, Manatee County, Florida (1984)
-
Phase I Cultural Resources Assessment Survey of The Semiannual JIFE Mortar Firing Points, Avon Park Air Force Range, Highlands and Polk Counties (2006)
-
Phase I Cultural Resources Assessment Survey, Lake County, Florida (1988)
-
Phase I Cultural Resources Assessment, Affordable Housing Program, Montgomery, Alabama (2002)
-
Phase I Cultural Resources Assessment, Autauga Creek Bridge Replacement, Autauga County, Alabama (2002)
-
Phase I Cultural Resources Assessment, Four Bridge Replacements, Lowndes County, Alabama (2001)
-
Phase I Cultural Resources Assessment, Oak Tree Road Bridge Replacement, Sparkill Creek, Orangetown, Rockland County (2001)
-
Phase I Cultural Resources Assessment, Proposed Alagasco Liberty Park Reinforcement Gas Pipeline, Jefferson County, Alabama (2002)
-
Phase I Cultural Resources Assessment, Proposed Chaney Thompson Road Widening Project, East Huntsville, Alabama (2000)
-
A Phase I Cultural Resources Assessment, the Proposed 255 Acre Oyster Bay Resort, LLC Development in Gulf Shores, Baldwin County, Alabama (2000)
-
Phase I Cultural Resources Evaluation
-
Phase I Cultural Resources Evaluation Along Carpenteria Ave., Santa BarbaraCounty (1981)
-
Phase I Cultural Resources Evaluation of Shadow Hills Condominium Development Goleta, California (1980)
-
Phase I Cultural Resources Evaluation of the Proposed Bartow Bridge Replacement and Intersection Improvements to US Route 250, WV Route 28,WV Route 92, Pocahontas COunty Route 3, Pocahontas County, WV (1995)
-
Phase I Cultural Resources Evaluation of the Proposed Coastal Housing Project, APN 73-090-13 and 50, Goleta, California (1982)
-
Phase I Cultural Resources Evaluation of the Proposed Lower Gassaway Truss Bridge Replacement Braxton County, West Virginia (1997)
-
Phase I Cultural Resources Evaluation of the Proposed Shannondale Bridge Replacement, Jefferson County, WV. (1997)
-
Phase I Cultural Resources Evaluation of the Proposed Shenandoah Mountain US 33 Truck Climbing Lanes, Pendleton County, WV. (1997)
-
Phase I Cultural Resources Evaluation of the Proposed Short Creek Road Project Brooke and Ohio Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed Short Creek Road Project Brooke and Ohio Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed Trout Rock Curve Relocation : US Route 220 South of Franklin Pendleton County, West Virginia (1994)
-
Phase I Cultural Resources Evaluation of the Proposed Upgrade of Appalachian Corridor L : US Route 19 from Hico to Mount Nebo in Fayette and Nicholas Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed Upgrade of Appalachian Corridor L : US Route 19 from Hico to Mount Nebo in Fayette and Nicholas Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed Upgrade of Appalachian Corridor L: US Route 19 from Hico to Mount Nebo in Fayette and Nicholas Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed Upgrade of Appalachian Corridor L: US Route 19 from Hico to Mount Nebo in Fayette and Nicholas Counties, West Virginia (1993)
-
Phase I Cultural Resources Evaluation of the Proposed US 33 Road Improvements, Pendleton County. (1997)
-
Phase I Cultural Resources Evaluation of the Vista Del Mar Union School Property (1982)
-
Phase I Cultural Resources Executive Summary: Mason County, West Virginia Shadle Bridge Replacement Project (1996)
-
Phase I Cultural Resources Final Report For the Cathedral Oaks Circulation Link Segment II (1993)
-
Phase I Cultural Resources Final Report For the Proposed Mountain View Residential Development (1994)
-
Phase I Cultural Resources for Proposed Five Acre Pond Material to Be Used for Borrow Associates with Polk County Paving and Grading Project # L-2820(3)--73-77 NE 54th Ave. IN Delaware Township, Polk County (1996)
-
Phase I Cultural Resources Identification Survey of U.S. Naval Academy North Severn, Annapolis, Anne Arundel County, Maryland (1996)
-
Phase I Cultural Resources Identification Survey: U.S. Naval Academy Golf Course, U.S. Naval Academy North Severn, Annapolis, Anne Arundel County, Maryland (1995)
-
Phase I Cultural Resources IN Bridge Replacement BRS-9033(40)--8J-33 Eden Township, Fayette County (1998)
-
Phase I Cultural Resources Inventigation of Two Proposed Borrow Areas For Rural Improvements, Stage I, Souris River Basin Project, Ward County, North Dakota (1991)
-
Phase I Cultural Resources Inventory and Phase II Evaluation of the Proposed X-33 Launch Pad at the Haystack Butte, Eafb, Kern, Los Angeles and San Bernardino Counties, CA. 32PP (1997)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement (F-15) IN Marshall County, Iowa [Chc-99-IA-Mr-002] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement (LB-131730) IN Plymouth County, Iowa [Chc-99-IA-Pm-003] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement (LB-162960) IN Plymouth County, Iowa [Chc-99-IA-Pm-004] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement (LB-332850) IN Plymouth County, Iowa [Chc-99-IA-Pm-002] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement (N-4) IN Marshall County, IA [Chc-99-IA-Mr-Oo3] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement and Borrow Area IN Calhoun County, Iowa [Chc-99-IA-Ch-001] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement Project (BROS (73) IN Clay County, Iowa [Chc-99-IA-Cy-001] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement Project (BROS (74) IN Clay County, Iowa [Chc-99-IA-Cy-002] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement Project (BROS (75) IN Clay County, Iowa [Chc-99-IA-Cy-003] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement Project (BROS (76) IN Clay County, Iowa [Chc-99-IA-Cy-004] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Bridge Replacement Project (BROS (77) IN Clay County, Iowa [Chc-99-IA-Cy-005] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Guy Tower Site IA-502P-A) IN Pottawattamie County, Iowa (Chc-99-IA-PW-001) (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Road Grading Project IN Marshall County, Iowa [Chc-99-IA-Mr-004] (1999)
-
A Phase I Cultural Resources Inventory at a Proposed Wireless Tower Site (IA-518) IN Missouri Valley, Harrison County, Iowa [Chc-99-IA-Hr-001] (1999)
-
Phase I Cultural Resources Inventory at Proposed Bridge Replacement Project BROS-71()--8J-71 IN O'Brien County (1999)
-
Phase I Cultural Resources Inventory at Proposed Bridge Replacement Project BROS-71(36)--8J-71 IN O'Brien County (1999)
-
Phase I Cultural Resources Inventory at Proposed Bridge Replacement Project BRS-71(25)--60-71 IN O'Brien County (1998)
-
Phase I Cultural Resources Inventory at Proposed Bridge Replacement Project BRS-71(35)--60-71 IN O' Brien County (1998)
-
A Phase I Cultural Resources Inventory at the Proposed Candle Ridge Apartments IN Winterset, Iowa [Chc-98-IA-MD-001] (1998)
-
Phase I Cultural Resources Inventory Blue Mountain Minerals Permit Area, Tuolumne County, California. (1998)
-
Phase I Cultural Resources Inventory for a Portion of Sheep Creek in the San Gabriel Mountains, San Bernardino County, CA. 12PP (1998)
-
Phase I Cultural Resources Inventory for Proposed Road Alignment and Regarding Project IN Benton and Linn Counties (1998)
-
Phase I Cultural Resources Inventory Lourence / Presidio Group Property, San Joaquin County, California, APN #240-20-03 (1999)
-
Phase I Cultural Resources Inventory of Cultural Resources Associated with the Proposed Norfolk Southern Railway Company and Williams Communications, Inc., Fiber Optics Line and Regeneration Station, Washington County, Maryland (2000)
-
Phase I Cultural Resources Inventory of Six Temporary Workspaces Associated with the Proposed Southern Natural Gas Company 10 in O.D. Montgomery-Columbus Line Replacement Pipeline Project, Lee County, Alabama (1998)
-
A Phase I Cultural Resources Inventory of the Fontana Unified School District Site #4 in the City of Fontana. 20PP (2000)
-
Phase I Cultural Resources Inventory Survey of the Proposed Garten Land Exchange (1982)
-
Phase I Cultural Resources Inventory, Gateway Apartments, San Joaquin County, California, APN #209-270-030 and 209-270-031. (1999)
-
Phase I Cultural Resources Investiagtion of a 40 Acre Parcel East of Adobe Canyon, Santa Ynez Valley, Santa Barbara County (Apn 137-100-07) (1989)
-
A Phase I Cultural Resources Investigatioin of the Proposed Aerie Networks Houston to Chicago Fiber Optic Cable Project, Anderson, Fannin, Harris, Henderson, Houston, Hunt, Kaufman, Montgomery, and Walker Counties (2001)
-
A Phase I Cultural Resources Investigation Along County State Aid Highway 29 in Itasca County, Minnesota (2000)
-
Phase I Cultural Resources Investigation Along the Proposed Hwy. 101 Expansion, Lake Susan, Chanhassen, Carver County, Minnesota (1993)
-
A Phase I Cultural Resources Investigation Along Trunk Highway 232 in Aitkin County, Minnesota (2000)
-
A Phase I Cultural Resources Investigation Along Trunk Highway 73 in St. Louis County, Minnesota (2000)
-
Phase I Cultural Resources Investigation and Phase II Testing at the City of East grand Forks, Polk County, Minnesota (2001)
-
Phase I Cultural Resources Investigation at Lake Pulaski, Wright County, Minnesota (1985)
-
Phase I Cultural Resources Investigation Cottage Grove Wastewater Treatment Plant Expansion Study (1993)
-
Phase I Cultural Resources Investigation Dam Safety Assurance Program, Mississippi River Headwaters, Pine River Reservoir, Crow Wing County, Minnesota (1996)
-
Phase I Cultural Resources Investigation El Prado Motel 1601 State Street, Santa Barbara, California (1990)
-
Phase I Cultural Resources Investigation for a Proposed Bridge Replacement and Bank Stabilization Project, Red Oak Township, Montgomery County, Iowa (1996)
-
Phase I Cultural Resources Investigation for a Proposed Bridge Replacement Within Cedar Township, Black Hawk County (1997)
-
Phase I Cultural Resources Investigation for a Proposed Bridges Replacement and Road Improvement Project Washigton Township, Lucas County (1997)
-
A Phase I Cultural Resources Investigation for a Proposed Improvement Project, Scott Township, Madison County (1999)
-
Phase I Cultural Resources Investigation for a Proposed Industrial Park Within the City of Brunswick, Medina County, Ohio (1998)
-
Phase I Cultural Resources Investigation for a Proposed Otter Creek Channel Change Project, Mott Township, Franklin County (1995)
-
Phase I Cultural Resources Investigation for a Proposed Residential Development Within the City of Brecksville, Cuyahoga County, Ohio (1998)