Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project

Summary

In May 2015, PacifiCorp (doing business as Rocky Mountain Power, Proponent) requested that SWCA Environmental Consultants conduct archaeological laboratory analyses and report preparation from data recovery testing and excavations conducted for the Sigurd to Red Butte No. 2 – 345kV Transmission Project (Project).The 277.32-kilometer (172.32-mile) Sigurd to Red Butte No. 2 – 345-kilovolt (kV) transmission line runs from the existing Sigurd Substation in Sevier County, Utah, to the existing Red Butte Substation in Washington County, Utah. During the Project, 81 archaeological sites were investigated through some combination of Phase I testing, Phase II archaeological excavation, and/or Level II historic documentation.

Cite this Record

Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project. ( tDAR id: 436481) ; doi:10.6067/XCV86W9D8V

Individual & Institutional Roles

Submitted To(s): Bureau of Land Management

Record Identifiers

Utah State Project No.(s): U-13-ST-0001

Resources Inside this Project (Viewing 1-10 of 10)

There are 10 Documents within this Project [remove this filter]

Documents

  1. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Beaver County (2017)
  2. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Iron County (2017)
  3. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Millard County (2017)
  4. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Sevier County (2017)
  5. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1 Appendix A: IMACS Site Forms, Washington County (2017)
  6. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 1: Project Background and Field Results (2017)
  7. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 2: Prehistoric Synthesis (2017)
  8. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 3 Appendix A: Level II Historic Documentation Packets (2017)
  9. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah, Volume 3: Historic Context and Synthesis (2017)
  10. Archaeological Investigations for the Sigurd to Red Butte No. 2 – 345kV Transmission Project in Beaver, Iron, Millard, Sevier, and Washington Counties, Utah: Volume 2 Appendices (2017)