SRP (Other Keyword)

251-267 (267 Records)

Salt River Project Pinnacle Peak to Papago Buttes Project, Assessment of Cultural Resources (1985)
DOCUMENT Full-Text Richard W. Effland.

Salt River Project (SRP) proposes to construct a 230 kV transmission line to connect the Pinnacle Peak, Brandow, and Papago Buttes substations. Archaeological Consulting Services (ACS) was contracted to perform an assessment of impacts to cultural resources that would be caused by the project. ACS is responsible for assessing potential impacts to historical and archaeological sites as well as architectural resources in the vicinity of the new right-of -way. One hundred percent survey of the...


Salt River Project, Archaeological Clearance Investigation: Coronado Generating Station, Coal Haul Railroad Wye and Repair Workshop, Private Land, Apache County, Arizona: Final Report for Archaeological Clearance Survey for the Coal Haul Wye and Repair Workshop (1977)
DOCUMENT Full-Text Bill J. Gossett.

On December 17-18, 1976, at the request of the Salt River Project, the Museum of Northern Arizona conducted an archaeological survey of the proposed Coal Haul Railroad Wye and an area selected as a Repair and Welding Workshop, both areas on private land. The area was surveyed from west to east beginning at surveyors stake No. 1, to a point 150 meters east and parallel to the railroad right-of-way base line. The area chosen as a repair and welding workshop includes an 800 ft. x 3000 ft. tract of...


Salt River Project, Coronado Generating Station Project, State and Private Lands, Apache and Navajo Counties, Arizona: Final Report for Phase I and II: Archaeological and Ethnohistorical Research (1974)
DOCUMENT Full-Text David N. Siegel. James E. Bradford.

Between January 27 and February 15, and February 25 to May 6, 1974, the Museum of Northern Arizona acted as a consultant to Wirth Associates to study a series of alternate transmission line corridors to connect proposed Salt River Project coal-fired power plants at either the Snowflake or St. Johns localities to three substations in the Phoenix area. Then from April 11 to May 3, 1974, the Museum was contracted by Bechtel Power Corporation to complete Phase I survey investigations of the proposed...


Salt River Project, Coronado Generating Station, Ash Disposal Area and Evaporation Pond Site on Private Lands, Apache County, Arizona: Interim Report for Phase II and Phase III Operations in the Ash Disposal and Evaporation Pond Site for the Salt River Project Coronado Station, A 76-6 (1976)
DOCUMENT Full-Text Eileen Camilli.

Between February 18, 1976 and April 25, 1976 archaeological field work was conducted on the Coronado Generating Station ash disposal area and evaporation pond site for the Salt River Project, During this time 3.25 square miles were surveyed and 33 sites recorded. In addition to the fieldwork, analytical and write up phases of the project were carried out between May 3 and July 19, 1976. These phases provide a description and analysis of archaeological sites and artifactual materials from the...


Salt River Project, Coronado Generating Station, Coal Haul Railroad - Realignments 1 & 2 and the Western Alignment, Private, Federal, and State Lands, Apache County, Arizona: Final Report for Preliminary Evaluation of Realignments 1, 2, and the Western Alignment of the Salt River Project Coronado Station Coal Haul Railroad (1976)
DOCUMENT Full-Text J. James Trott. Gale M. McPherson.

During the months of April and May, 1976, Salt River Project requested that the Museum of Northern Arizona inspect a number of test pit and bore hole locations along the proposed Coronado Generating Station Coal Haul Railroad. Proposed test locations were examined along three alternative alignments, Realignment 1, Realignment 2, and the Western Alignment. A total of 19 archaeological sites were found during these investigations. Based on the data collected during this time, numerical evaluations...


Salt River Project, Coronado Generating Station, Coal Haul Railroad - Realignments 1 & 2, Private, Federal, and State Lands, Apache County, Arizona: Final Report for Preliminary Evaluation of Realignments 1 and 2 of Coronado Generating Station Coal Haul Railroad (1976)
DOCUMENT Full-Text J. James Trott.

At the request of Salt River Project, an evaluation of Realignments 1 and 2 of the proposed D-2 alignment of the Coronado Generating Station Coal Haul Railroad has been prepared. Archaeological investigations of both realignments were conducted on two occasions. On April 13, 1976, an aerial reconnaissance of the realignments was conducted and on May 3-7, 1976, the proposed locations of 24 bore holes and 19 test pits, located along the realignment were surveyed. Based on information collected...


Salt River Project, Coronado Station: Mitigation Plans for Seven Impacted Bureau of Land Management Properties - NA14,638; NA14,640; NA14,642; NA14,650; NA15,208; NA13,911; NA14,869 (2017)
DOCUMENT Full-Text William S. Marmaduke.

Responding to a request from the Bureau of Land Management (BLM), Phoenix District, the Museum of Northern Arizona has prepared a description of work that the Museum will undertake at sites on BLM managed lands during the Coronado Station Archaeological Project. The total number of BLM sites impacted by Coronado Station construction is seven: five sites (NA's 14,638; 14,640; 14,642; 14,650; 15,208) in right-of-way of the Coal Haul Railroad, and two sites (NA13,911 and NA14,869) in the...


Salt River Project, Kyrene Expansion Project, Technical Proposal (1999)
DOCUMENT Full-Text Desert Archaeology Inc..

This proposal is Desert Archaeology's response to Salt River Project’s request for archaeological testing at the Kyrene Generating Station in Tempe, Arizona. This proposal presents an efficient program to determine if significant cultural resources are present within the project area. The program is designed to address the needs of Salt River Project for phased investigations within a specified time frame and in a cost-effective manner. Our work combines high professional standards with...


SRP 69 kV Subtransmission Line Reconductoring Project, Final Environmental Assessment (2002)
DOCUMENT Full-Text Environmental Services Group, ENTRANCO, Inc..

This Environmental Assessment (EA) has been prepared at the request of the Salt River Pima Maricopa Indian Community (SRPMIC) to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303,...


SRP and the Bureau of Reclamation: A Political Analysis of the Past, Present and Future Relationship (1994)
DOCUMENT Full-Text Fred Andersen.

The U.S. Bureau of Reclamation was created by Congress in 1902 to build irrigation projects in the West. The Salt River Project, as one of the first reclamation projects, in a sense owes its life to the Bureau. However, the passage of the Reclamation Act was due in large part to the political influence of private citizens in the West, with prominent roles played by citizens of the Salt River Valley. So the Bureau at least partly owes its life to the Salt River Project. The two organizations have...


The Structure and Organization of Basketmaker III Field Houses at the Cottonwood Seep Site (1993)
DOCUMENT Full-Text David H. Greenwald.

Early settlement of the Cottonwood Seep Site consisted of small, informal pit structures and large jacal surface structures that were used on a seasonal basis for a period from approximately A.D. 500 until about A.D. 800. This paper examines the structure and organization of the Basketmaker III settlement, focusing on group organization, site function, resource availability, and environmental considerations. Unlike many of the surrounding Basketmaker III field house sites, the Cottonwood Seep...


Supplemental Cultural Resources Survey and Monitoring for Expansion and Rehabilitation of Wetlands Within the Arlington Wildlife Area, Maricopa County, Arizona (2006)
DOCUMENT Full-Text David A. Bild.

The Salt River Project (SRP), Arizona Game and Fish Department (AZGFD), and Ducks Unlimited (DU) are involved in a cooperative project designed to expand and rehabilitate wetlands for Yuma clapper rail habitat at the Arlington Wildlife Area (AWA), Maricopa County, Arizona. The project area is located on AZGFD land on the west side of the Gila River. The project area consists of a 14.4-acre AZGFD parcel that measures 2,264 ft (690 m) north-south by 262 to 328 ft (80 to 100 m) east-west. Project...


Theodore Wirth Associates, Arizona Station Transmission System, Salt River Project, State, Private, Federal, and Indian Lands, Coconino, Navajo, Apache, Maricopa, Pinal, Gila Counties, Arizona and Catron and Valencia Counties, New Mexico: Final Report for Phase II: Archaeological Impact Study, Arizona Station Transmission System Study (1974)
DOCUMENT Full-Text Howard M. Davidson. Michael D. Metcalf.

The Museum of Northern Arizona developed a location analysis research design for Phase II archaeological investigations of the proposed transmission line corridor route for the Arizona Station Project. Through coupling this research design with a survey of sample archaeological units in the corridor areas, a projection of archaeological sensitivity was generated. This projection was based on a categorization of the total study areas in terms of environmental sensitivity to each. Variable for...


Trenching South of the Grand Canal at Pueblo Grande, Phoenix, Maricopa County, Arizona (1993)
DOCUMENT Full-Text Holly S. DeMaagd.

At the request of Janice Cunningham of U.S. West Communication (US West), Archaeological Consulting Services, Ltd. (ACS) performed subsurface testing along a proposed utility (fiber optic communication cable) right-of-way. The right-of-way will be located within the southern access road for the Grand Canal, which passes through Pueblo Grande Historic Landmark (Pueblo Grande). The canal is owned by the Bureau of Reclamation (Reclamation) and administered by the Salt River Project (SRP)....


Wirth Associates Palo Verde Nuclear Generating Station Transmission System, Salt River Project, Maricopa County, Arizona: Final Report for Archaeological Impact Study: Palo Verde Nuclear Generating Station Routing Alternate to Westwing Receiving Station (1975)
DOCUMENT Full-Text Richard A. Brook.

Wirth Associates contracted with the Museum of Northern Arizona to conduct an archaeological impact study of a proposed Salt River Project Palo Verde Nuclear Generating Station Routing Alternate to Westwing Receiving Station. This study delineates areas with three levels of potential site occurence for the project area, and investigates potential effects on the cultural resources of the alternative corridors proposed by Salt River Project. A short data gathering phase, prior to field work,...


Wirth Associates, Arizona Station Transmission System, Salt River Project, State, Private, and Federal Lands, Coconino, Navajo, and Apache Counties, Arizona, Valencia and Catron Counties, New Mexico: Preliminary Draft for Phase I: Archaeological and Ethno-historical Research (1974)
DOCUMENT Full-Text Michael D. Metcalf. Howard M. Davidson. Kathleen E. Moffitt.

At the request of Wirth Associates, the Museum of Northern Arizona conducted a Phase I archaeological study of an area in east-central Arizona to identify prehistoric and ethno-historic groups in to delineate areas of potential archaeological sensitivity within the study area. Existing archaeological site data were gathered from various Arizona and New Mexico institutions, and archaeological site density per township was mapped. Site density figures were compared with vegetational and...


A Work Plan for Further Investigations of Archaeological Sites Along the 500kV Tonto National Forest Boundary to Kyrene Transmission Line Route, Coronado Station Project, Pinal and Maricopa Counties, Arizona (1977)
DOCUMENT Full-Text John M. Antieau.

An intensive survey of approximately 67 km (42 mi) of transmission line right-of-way between Kyrene and the Tonto National Forest boundary was completed by a 3-man crew in 15 days. A total of 144 field numbers were assigned to cultural materials encountered, ranging from a single flake or sherd to a large site or component thereof. Material recovered is summarized in Table 1, and locations are plotted on accompanying aerial photos. Isolated artifacts and small scatters were collected; samples (1...