Phase II Testing and National Register Evaluation of Archeological Site 36 Co 9: Catawissa Bridge Replacement, L.R. 183 (T.R. 42), Section A12, Columbia County, Pennsylvania
Author(s): Thomas L. Struthers
Year: 1983
Summary
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded.
If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cite this Record
Phase II Testing and National Register Evaluation of Archeological Site 36 Co 9: Catawissa Bridge Replacement, L.R. 183 (T.R. 42), Section A12, Columbia County, Pennsylvania. Thomas L. Struthers. 1983 ( tDAR id: 159802)
Keywords
General
Archaeological Site
•
Archeological Overview / Synthesis-Project Spec
•
Archeological Site
•
Cultural Chronology
•
Evaluation
•
Highway Archaeology
•
Highway Archeology
•
Lithics
•
National Register of Historic Places
•
Owasco
•
Prehistory
•
Significance / Management
•
Site Settlement
Geographic Keywords
42037 (Fips Code)
•
Catawissa
•
Clemson Island
•
Columbia (County)
•
North America (Continent)
•
Pennsylvania (State / Territory)
•
Susquehanna River
•
United States of America (Country)
Temporal Keywords
Historic
Spatial Coverage
min long: -76.641; min lat: 40.776 ; max long: -76.208; max lat: 41.309 ;
Individual & Institutional Roles
Sponsor(s): Gannett Fleming Transportation Engineers, Inc., Harrisburg
Prepared By(s): John Milner Assoc. , Inc. , West Chester, PA
Record Identifiers
NADB document id number(s): 12221
NADB citation id number(s): 000000086866
Notes
General Note: Submitted to: Gannett Fleming Transportation Engineers, Inc., Harrisburg
General Note: Sent from: John Milner Assoc., Inc., West Chester, PA