Arita Slate
No description specified.
1-7 (7 Records)
Documents
- Letter Report To Eric Dillingham, Carlsbad RA: Monitoring of La 102494 During Central Valley Electric Cooperative, Inc. WO#24312 / Yates Petroleum Corp. Power Line Construction (1995)
- Letter Report: Cultural Resource Stipulations (BLM Report No. 97-NM-067-102 / DWAS Report No. 96-33-Sa), Yates Petroleum Corporation's Cerros AQF Federal Well No. 1 and Access Road (1996)
- Letter Report: Damage Assessment On Turner: A" Well No. 47 [DWAS Report: 96-33F; Dated February 20, 1996] (1996)
- Letter Report: EOTT Pipeline Serving Hallwood "1" Federal Well No. 7 (DWAS Report 96-14M) Re-Route To Avoid La 112584 (1996)
- Letter Report: Monitoring Enron Oil and Gas Company's Electric Line To Hallwood Federal Well No. 7 (1996)
- Letter Report: Monitoring of Fence Placement Near La 112425 Per BLM Cultural Resource Stipulations (BLM Report 96-344 [DWAS 96-24F] Devon Energy-Turner "A" No. 42) (1996)
- Letter Report: To Santa Fe Energy Resources, Inc. Re: Archaeological Testing At La 110831 (1995)