UMF - Archaeology Research Center
No description specified.
1-31 (31 Records)
Documents
- Archaeological Investigations in the Hanover,NH / Norwich, VT Ledyard Bridge Project Area, ST-AC-DPR-BRM-0038(001), 10029-A: Phase II Testing at the Dartmouth Pottery Site and, Phase III Data Recovery at the Lewis Site. (2001)
- An Archaeological Phase I Survey and Phase II Testing of the Springlet Proposed Development Project (1996)
- An Archaeological Phase I Survey of the Duxbury VT RT. 100 Proposed Highway Improvement Project, F 013-4(11)S (1998)
- An Archaeological Phase I Survey of the Eastern Component of the Bennington Bypass Project, F019-1(5) and F110-1(5) (2000)
- An Archaeological Phase I Survey of the Readsboro-Whitingham Vermont Route 100 Proposed Improvement Project, RS 0102(13) (1997)
- Archaeological Phase IA Study of the Southern Vermont Natural Gas Corp. Proposed Natural Gas Pipeline Project, Bennington and Rutland Counties (1999)
- An Archaeological Phase IB Survey and Phase II Testing of the Proposed Mendon BRO 1443(35), Bridge Replacement Project (2001)
- An Archaeological Phase IB Survey of the C-6 Alignment, Southern Connector Project, MEGC-M5000(1) (1997)
- An Archaeological Phase IB Survey of the Proposed Clarendon, BRO 1443(34) Bridge Replacement Project (2001)
- An Archaeological Phase IB Survey of the Proposed Groton Bridge Replacement Project, TH2-9435 (2000)
- Archaeological Phase II Testing of the Western Component of the Bennington Bypass Project, DPI 0146(1) (2000)
- Archaeological Phase II Testing, Underhill Bridge Improvement Project BRS 0233 (2) (1998)
- Archeological Phase I Survey and Phase II Testing of the Brentwood Commercial and Industrial Development Project, Colchester (2000)
- Archeological Phase I Survey of the Vermont Segment of the Champlain Pipeline Project FERC Docket No. CP98-646-000. (1991)
- Archeological Phase IA Study of the C-6 Alignment, Southern Connector Project, MEGC-M5000 (1) (1998)
- Archeological Phase IB Survey for the Redesigned Approach Component of the Arrowhead Mountain Lake Bridge Crossing and the Husky Injection Molding Systems, Inc. Campus Expansion, Master Plan for Buildings 2,3,4,5. Milton (1999)
- Archeological Resource Assessment of the Brattleboro Transportation Center and Union Station Project (2000)
- Draft an Archaeological Phase IB Survey of the Barton Project STP0113(58)SC (2000)
- Draft Archeological Phase IA Study of the C-6 Alignment, Southern Connector Project, MEGC-M5000 (1) (1996)
- Draft Essex No.19 Hydroelectric Project (1991)
- Draft Phase II Testing of the Cheshire, Furnace Brook, and Hadwen Sites in the Eastern Component of the Bennington Bypass Project F019-1 (5) Archaeological Testing (1999)
- Draft Royalton Vermont Route 14 Improvement and Bridge No. 2 Replacement Project Archaeological Survey (1998)
- Draft South Royalton Proposed Bridge Improvement Project BRZ 1444(22) Archaeological Testing (1998)
- People Land and History: The Cultural Landscape of the Nulhegan District Cultural Resource Assessment and Management Plan of the Former Champion Lands Held in Public Ownership (2001)
- Pownal-Bennington Project, F019-1(16) Acrhaeological Phase I Survey and Phase II Testing (1999)
- Proposed Rochester Salt Sheds Project, Salt 001-100 (1999)
- Research Design for the Phase I Archaeological Reconnaissance Survey of Champlain Pipeline Company's Proposed Interstate natural Gas Pipeline Corridor in the States of VT, NH, and Mass. (FERC No. CP98-646-000) (1989)
- Royalton VT Rte. 14 Improvement and Bridge No. 28 Replacement Project Archaeological Survey (1999)
- Survey of the BLS Bennington L.C. Monument Plaza Project (2000)
- Sutton-Barton U.S. Route 5 Proposed Highway Improvement Project, RS 0113(47). Caledonia and Orleans Counties. (1998)
- Witch Gutter and Quarry Road Sites / Archaeological Phase III Data Recovery Excavations (1998)