Northwest Pipeline Production
No description specified.
1-16 (16 Records)
Documents
- Archaeological Monitoring of the Proposed Rosa Unit No. 146 Well Pad, Access Road, and Pipeline (1995)
- Archaeological Monitoring of the Rosa Unit No. 016a Well Pad (1995)
- Cultural Resources Survey of the Proposed 30-5 CDP Discharge Loop Pipeline (1995)
- Cultural Resources Survey of the Proposed La Jara Slug Catcher - Revised (1995)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 016a Well Pad (1994)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 072 Well Pad, Rio Arriba County, NM (1995)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 077a Well Pad and Access Road 1575' FSL 1170'FEL T31N R5W Section 33 (1995)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 147 Well Pad 1110' FNL 1675' FWL, Section 33 (1995)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 151 Well Pad (1995)
- Cultural Resources Survey of the Proposed Northwest Pipeline Production Rosa Unit No. 152 Well Pad (T32N, R6W, Section 36) (1995)
- Cultural Resources Survey of the Proposed Rosa Unit No. 149 Wellpad, Access Road and Pipeline, Rio Arriba County, NM (1995)
- Cultural Resources Survey of the Proposed Rosa Unit No. 153 Well Pad and Access Road (1995)
- Cultural Resources Survey of the Proposed San Juan 30-6 #37 Interconnect Pipeline and Access Road (1995)
- Cultural Resources Survey of the Proposed San Juan 31-6 #12 Interconnect Pipeline (1995)
- Cultural Resources Survey of the Proposed Trunk R Extension Pipeline (1995)
- Results of ARPA Testing At Site La 109085 On the Proposed Rosa Unit No. 151 Well Pad (1995)