James S. Schmidt
No description specified.
1-18 (18 Records)
Documents
- Appendices a and D: Beneficial Use Areas Survey, Houston-Galveston Navigation Channels, Texas Project, Galveston, Harris, Liberty and Chambers Counties, Texas, Galveston Bay (1995)
- Archival Research and Historic Sites Testing-Houston-Galveston Navigation Channes, Texas Project Galveston, Harris, Liberty, and Chambers Counties, Texas (1999)
- Assessment of Anomaly RB5 Rollover Bay GIWW High Island to Brazos River Feasibility Study Brazoria and Galveston County, Texas (2001)
- Cultural Resource Investigations for the Big Brown CVI Revision (FM 2570 South) Mine Area, Freestone County, Texas (1994)
- Cultural Resources Survey, Proposed 138-KV Sharyland Transmission Line Project, Hidalgo County, TX (1998)
- Cultural Resources Survey, Proposed 4 Inch Pipeline, Lease Blocks 91 and 92, Live Oak Peninsula, Arnasas Bay, Aransas County, Texas (1993)
- Draft: Cultural Resources Survey Camp Swift, Bastrop County, Texas (1995)
- East Texas Electric Cooperative, Inc. Cultural Resources Survey (Clyde Brady Pecan Hills and Pecan Hills Garden Valley Segments), Smith County, Texas (1996)
- Final Report: Cultural Resources Survey, Camp Swift, Bastrop County, Texas (1995)
- Hicross Substation to the Buda Split 138-KV Transmission Line Rebuild Project, Travis and Hays Counties, Texas (1993)
- Initial Investigations Archival Research, Remote Sensing, and Terrisrial Survey, Neches River Saltwater Barrier, Beaumont, Texas, Jefferson, Orange, and Hardin Counties (1998)
- Intensive Archival Research, Close-Order Magnetometer Survey, Dating, and Offshore Diving, Houston-Galveston Navigation Channels, Texas Project, Galveston, Harris, Liberty, and Chambers Counties, Texas, Offshore Galveston Bay (1998)
- Magnetometer Survey and Diving, Gulf Intracoastal Waterway and Houston Ship Channel Intersection, Galveston County, Texas (1995)
- Mapping of th e "Utina" (41NU264) Corpus Christi Entrance Channel, Nueces Co., Texas. (1994)
- Phase Ib Intensive Archaeological Investigations of the MD 100 Wetland Mitigation, Buckingham Tree Nursery and Deep Run Areas, Anne Arundel and Howard Counties, Maryland (1992)
- Reconnaissance Level Study of Historic Period Resources, Selected Areas Along the GIWW, High Island to Brazos River Floodgate Brazoria, Chambers, and Galveston Counties, Texas (1999)
- Underwater Remote-Sensing Survey of Selected Areas, GIWW, High Island to Brazos River, Brazoria and Galveston Counties, Texas (2002)
- Wolf Lane to Lytton Springs 138-KV Trasmission Line Rebuild Project (1993)