National Park Service
Institution Members
1,401-1,450 (7,489 Records)
Documents
-
Archeological Clearance Survey for Replacement of the Thirteen Mile Bridge (20.9 Kilometers) and Minor Realignment of the Chilkoot Trail (1987)
-
Archeological Clearance Survey for Several Construction Projects at Bartlett Cove (1985)
-
Archeological Clearance Survey for Sewer Upgrade - Installation of Septic Tank and Lift Station, Bl-3 Residence, Brooks Lake (1988)
-
Archeological Clearance Survey for Sewer Upgrade For National Park Service Housing at Brooks Lake (1987)
-
Archeological Clearance Survey for Sewer Upgrade, Force Main Between Bl-3 and Leachfield, Brooks Lake (1988)
-
Archeological Clearance Survey for Sign Board and Food Cache Installation (1985)
-
Archeological Clearance Survey for Slippery Creek Reclamation Project (1987)
-
Archeological Clearance Survey for Subsurface Fuel Line For the Headquarters Building, Eagle (1987)
-
Archeological Clearance Survey for Subsurface Installation of Electrical Service from Bl-2 Cabin To the Existing Well House, Brooks Lake (1987)
-
Archeological Clearance Survey for Subsurface Installation of Metal Chain Link Mesh Around the Foundation (Exterior) of Bl-1 and Bl-2 Cabins (1987)
-
Archeological Clearance Survey for Taylor's Dog Barn Stabilization (1985)
-
Archeological Clearance Survey for the Arctic Entry For Headquarters Building, Eagle (1987)
-
Archeological Clearance Survey for the Chitina Ranger Station Renovation (1991)
-
Archeological Clearance Survey for the Cobb Hill Remote Radio Station (Base) (1985)
-
Archeological Clearance Survey for the Construction of a Radio Repeater Station at Kathul (1985)
-
Archeological Clearance Survey for the Construction of a Radio Repeater Station at Twin Mountain (1985)
-
Archeological Clearance Survey for the Douglas B. Vaden Land Exchange and Concession Permit (1985)
-
Archeological Clearance Survey for the Establishment of a New Campground On the East Side of Valley Road Near Park Road Junction (1988)
-
Archeological Clearance Survey for the Excavation of Cache Postholes at the Airport Parking Pad, Brooks Lake (1988)
-
Archeological Clearance Survey for the Harding Icefield Trail Rehabilitation (1991)
-
Archeological Clearance Survey for the Harvest of House Logs By Ray McNutt at Chisana (1983)
-
Archeological Clearance Survey for the Hotel Drainage Project, Denali National Park and Preserve (1986)
-
Archeological Clearance Survey for the Installation of a Fuel Storage Tank, Brooks Lake (1985)
-
Archeological Clearance Survey for the Installation of a Septic Tank and Lift Station at Bl-1 and Bl-2 Residences, Brooks Lake (1988)
-
Archeological Clearance Survey for the Installation of Wooden Bulletin Board Sign Along Main Road into Historic Townsite of Dyea, Alaska (1985)
-
Archeological Clearance Survey for the Installation of Wooden Posts On Various Trails at Dyea, Alaska (1985)
-
Archeological Clearance Survey for the Klawasi Remote Radio Station (Repeater) (1985)
-
Archeological Clearance Survey for the Kotzebue Quarters (4-Plex) Construction (1991)
-
Archeological Clearance Survey for the Leachfield For Bl-1, Bl-2, and Bl-3 Cabins, Sewer Upgrade Project, Brooks Lake (1988)
-
Archeological Clearance Survey for the Mile 64 Nabesna Road Upgrade at Rufus Creek, Wrangell-St. Elias National Park and Preserve (1989)
-
Archeological Clearance Survey for the Moore Lot Fence Line Relocation and Post Hole Excavation (1987)
-
Archeological Clearance Survey for the Moose Creek Terrace No. 2 Borrow Pit (1991)
-
Archeological Clearance Survey for the New Tent Frames at Brooks Camp (1991)
-
Archeological Clearance Survey for the Placement of Pit Toilets at the Dyea Slide Cemetery (1983)
-
Archeological Clearance Survey for the Placement of Small Wooden Stakes To Support Wooden Grave Markers at the Slide Cemetery, Dyea, Alaska (1985)
-
Archeological Clearance Survey for the Proposed C-Camp Maintenance Yard Expansion (1991)
-
Archeological Clearance Survey for the Rehabilitation of 11 Buildings: Boss Bakery, Mascot Saloon, and Verbauwedes Grocery and Confectionary (1984)
-
Archeological Clearance Survey for the Rehabilitation of the William Moore Cabin, Skagway Historic District (1984)
-
Archeological Clearance Survey for the Relocation of the Shop, Installation of the Weatherport and Development of a Materials Storage Area Brooks River Road Near Bl-3 (1987)
-
Archeological Clearance Survey for the Relocation of Two Outhouses, Campground Area, Brooks Camp (1987)
-
Archeological Clearance Survey for the Removal of Concrete Foundation and Slab Base of Old Brooks Camp Generator (1987)
-
Archeological Clearance Survey for the Replacement of an Underground Telephone Line at the New Headquarters Building, Eagle, Alaska (1985)
-
Archeological Clearance Survey for the Replacement of Radio Repeater at Hillard Benchmark (1985)
-
Archeological Clearance Survey for the Replacement of the Sheep Camp Ranger Station (1987)
-
Archeological Clearance Survey for the Reroute of the Valley Road at the Margot Creek Crossing (1987)
-
Archeological Clearance Survey for the Riley Creek Campground Sewer Rehabilitation (1986)
-
Archeological Clearance Survey for the Rock Creek Trail Rehab (1991)
-
Archeological Clearance Survey for the Sheep Camp Sanitation Facility and Water Line (1985)
-
Archeological Clearance Survey for the Sign Board / Food Cache and Well Relocation, Head of Brooks River, and the Sign Board, Mouth of Brooks River (1985)
-
Archeological Clearance Survey for the Slana Ranger Cabin Construction, Wrangell-St. Elias National Park and Preserve (1983)