Nathan Young
No description specified.
1-14 (14 Records)
Documents
- Addendum Phase I Archaeological Survey for the Fai-33-1. 20 Project in Violet Township, Fairfield County, Ohio (Pid 13281) (2000)
- Addendum to Phase I Cultural Resource Management Archaeological Reconn. Survey for U. S. Route 68 Preliminary Development Study Proj. (Chp-68-2. 2446[1. 52]) in Concord, Harrison, Mad River, Salem, and Urbana Twps., Champaign Co. , Ohio (Pid 9927) Appendix E (1997)
- Addendum to the Phase I Archaeological and Architectural Investigations in the Appalachian Corridor D Study Area, Belpre Township, Washington County, Ohio (Pid 21009). (2000)
- Addendum to the Phase I Fieldwork for the Proposed Northepointe Drive in Jefferson and Muskingum Townships, Muskingum County, Ohio (2000)
- Assessment Survey of Archaeological Sites to Be Impacted by the Proposed Blacklick Interceptor Sewer in Violet Township, Fairfield County, and Madison Township, Franklin County, Ohio (1999)
- Letter Report: Memo to File for the County Road 40 Bridge (Sfn 6631053) Replacement over Wilson Run in Jackson Township, Pike County, Ohio (2001)
- Phase I Cultural Resource Management Archaeological Reconnaissance Survey for the U. S. Route 68 Preliminary Development Study Project (Chp-68-2. 2446[1. 52]) in Concord, Harrison, Mad River, Salem, and Urbana Townships, Champaign County, Ohio (Pid 9927) (1997)
- Phase I Cultural Resource Management Archaeological Reconnaissance Survey for the U. S. Route 68 Preliminary Development Study Project (Chp-68-2. 2446[1. 52]) in Concord, Harrison, Mad River, Salem, and Urbana Twps., Champaign Co. , Ohio (Pid 9927) Appendix E (1997)
- Phase I Cultural Resource Survey for the Proposed County Line Road Extension in Orange Township, Delaware County, Ohio (2000)
- Phase I Cultural Resource Survey for the Proposed Fulton Road Improvement Project in Jackson Township, Stark County, Ohio (STA-687-2. 57; Pid 20431) (2000)
- A Phase I Cultural Resources Survey for the Proposed State Route 142 Improvements (Mad-142-11. 13; Pid 17790) in Jefferson Township, Madison County, Ohio (2000)
- A Phase I Literature Review and Archaeological Survey for the Proposed Lane Avenue Bridge Replacement in Clinton Township, Franklin County, Ohio. (Fra-CR59-3. 18; Pid 23539). (1999)
- Phase I Literature Review and Cultural Resource Survey for the Proposed Aep Lane Changes (Pic-23-2259; Pid 19062) in Harrison Township, Pickaway County, Ohio (1999)
- Phase I Literature Review and Cultural Resource Survey of Tru-80-10. 57 (Pid 12356) for the Proposed Rest Area and Vehicle Weigh Station on Interstate Route 80 in Hubbard Township, Trumbull County, Ohio (1998)