Federal Highway Administration (FHWA)
No description specified.
Alternate Names: Federal Highways Adminstration , Federal Highway Administration, Unknown Location , Federal Highways Administration , Federal Highway Administrat9Ion , Federal Highway Administartion , Federal Highway Administration , Federal Highway Adminstration , Federal Highway Admininstration
5,701-5,750 (6,886 Records)
Documents
- Phase I Cultural Resources Reconnaissance Survey Report, MNDOT SP6703-16 for Reconstruction of TH 23 from I-90 to Jasper, Rock and Pipestone Counties (Vols. 1-2 and Addendum) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report, MNDOT SP7601-11 / 13 for Replacement of TH 7 Bridge No. 5211 over the Pomme de Terre River in Appleton, Swift County (Draft Copy) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report, MNDOT SP7701-29 for Reconstruction and Curb, Gutter, and Sidewalk Along TH 210 in Staples, Todd County (Draft Copy) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report: MNDOT SP1401-14007 / 14009 for Replacement of TH 10 Bridges No. 3712 and No. 3713 Near Stockwood and Glyndon, Clay County (Draft Copy) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report: MNDOT SP1805-58 for Upgrading TH 210 to a Four Lane Design from 0.6 Miles East of the West Crow Wing County Line to TH 371 in Baxter, Crow Wing County (Vols. 1-2, Draft Copy) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report: MNDOT SP2713-64 for Channelization and Turn Lanes Along TH 12 Between Orono and Long Lake, Hennepin County (Draft Copy) (1994)
- Phase I Cultural Resources Reconnaissance Survey Report: MNDOT SP5404-20 for Construction of a Right Turn Lane Along TH 32 in Twin Valley, Norman County (Draft Copy) (1994)
- Phase I Cultural Resources reconnaisssance Survey for the Proposed Interstate 35 / 185th Street Interchange Ramps Lakeville, Dakota County, Minnesota (2000)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume I, Draft (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume I, Final (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume II, Final (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume III, Final (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume IV, Final (1994)
- Phase I Cultural Resources Study of US 34 Improvements Des Moines to Burlington Corridor, Wapello, Jefferson, and Henry Counties Volume V, Final (1994)
- Phase I Cultural Resources Study of US Highway 34 Improvements Des Moines to Burlington Corridor Wapello, Jefferson, Henry Counties (1994)
- A Phase I Cultural Resources Survey a Proposed Bridge Replacement FHWA 333830, and Road Grading Project FM-91(L-1570)Project, Warren County (1993)
- Phase I Cultural Resources Survey Along Five Disconnected Sections of Route A, Shannon and Dent Counties, and Phase II Archaeological Testing of Prehistoric Sites 23Sh322, 23Sh323, 23Sh325, 23Sh326, 23De94 and 23De95 (1991)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing For the Route 79 Old Monroe Relocation, Lincoln / St. Charles Counties (1983)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Prehistoric Site 23Sc609, Interstate 70 - Route 79 Interchange, St. Charles County (1985)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23An108, 0.3 Miles East of Route I-29, Route T, Andrew County (1986)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23Be1059, 23Be1060 and 23Be1061, and Two Bridge Replacements On Route 52, Benton County (1984)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23Cm55, 1.2 Miles West of Route C, Route A, Camden County (1988)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23Mn1211, Route 15, Monroe County, Crooked Creek Bridge Replacement (1985)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Sites 23Sc586, 23Sc587 and 23Sc588, Route P, St. Charles County, Peruque Creek Bridge Replacement (1983)
- Phase I Cultural Resources Survey CSAH 7 Between Bigfork and Scenic State Park, Itasca County, Minnesota (1998)
- Phase I Cultural Resources Survey for 17 Proposed Culvert Replacements and Modifications Along County Road L-66 Washington, York, and Minden Townships, Pottawattamie County (1997)
- Phase I Cultural Resources Survey for a Bank Stabilization Project, Washington Township, Pottawattamie County (1997)
- Phase I Cultural Resources Survey for a Curve Relocation on County Road E18, Dodge Township. Boone County, IA (1996)
- A Phase I Cultural Resources Survey for a Proposed Borrow Area and Bridge Replacement IN Wright Township, Wayne County, Iowa, Project No. BRS-CO93(30)--60-93; FHWA No. 340580 (2000)
- Phase I Cultural Resources Survey for a Proposed Borrow IN Byron Township, Buchanan County, Iowa (2001)
- Phase I Cultural Resources Survey for a Proposed Borrow IN Pleasant Township, Wright County, Iowa (2001)
- A Phase I Cultural Resources Survey for a Proposed Borrow, Village Township, Van Buren County, Iowa (2001)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement and Channel, Straightening, Cold Water Township, Butler County, Iowa. FHWA 089830; County ID C34N10. BCA 907 (2001)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement and Road Improvements IN Canoe Township, Winneshiek County, Iowa. BROS-CO9(56)--8J-96; FHWA #348610. BCA #845. (2000)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement and Road Realignment Project Along Suttle Creek, Linion Township, Allamakee County BROS-03(9)--8J-03 (1996)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement and Road Realignment, South Branch and Long Lake Townships, Watonwan County, Minnesota (1995)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement BROS-96(44) Bloomfield Township, Winneshiek County (1997)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement Franklin County (1992)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement Franklin County (1992)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Clayton County (1991)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Des Moines Township, Jasper County, Iowa (2001)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Jefferson Township, Rnggold County (1992)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Pottawattamie County (1991)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Poyner Township, Black Hawk County (1995)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Tingley Township, Ringgold County (1992)
- A Phase I Cultural Resources Survey for a Proposed Bridge Replacement IN Union County, Shelby County, Iowa (1991)
- Phase I Cultural Resources Survey for a Proposed Bridge Replacement Lincoln and Spring Creek Township. Tama County (1992)