Utah Power and Light Company, Salt Lake City, UT
No description specified.
151-182 (182 Records)
Documents
- Cultural Resource Survey of the Proposed 120 / 140-Volt Underground Line To Serve the Fishlake National Forest Microwave Site Across BLM Public Land, Beaver County, Utah (1983)
- Cultural Resource Survey of the Proposed Cameron To Spry Transmission Line Beaver, Iron, and Paiute Counties, Utah (1981)
- Cultural Resource Survey of the Proposed Chocolate Rock Water Tank 7.2 Kv Line (1982)
- Green River To Willow Branch Powerline Upgrade in Emery County, Utah (1986)
- Historical and Architectural Study of the Utah Power and Light Facilities On the Beaver River, Utah (1983)
- Historical and Architectural Study of the Utah Power and Light Facilities On the Beaver River, Utah (1983)
- Intensive Archeological Evaluations On the Emery - Spanish Fark Canyon Segment of the Proposed 345 Kv Transmission Corridor in Utah, Carbon and Emery Counties, Utah (1980)
- Intensive Archeological Evaluations On the Emery-Spanish Fork Canyon Segment of the Proposed 345Kv Transmission Corridor in Utah, Carbon and Emery Counties, Utah (1981)
- Intensive Cultural Resource Survey of the Red Spur Mountain 12.5 / 25 K.V. Underground Cable and Relay Station in Rich County, Utah (1981)
- Intensive Survey of Three Transmission Line Routes, Volume 2: Cultural Resource Evaluation Along the Huntington - Spanish Fork Transmission Line for Utah Power and Light Company (1977)
- Intensive Survey of Three Transmission Line Routes, Volume 2: Cultural Resource Evaluation Along the Huntington-Spanish Fork Transmission Line for Utah Power and Light Company (1977)
- Intensive Survey of Three Transmission Line Routes, Volume 2: Cultural Resource Evaluation Along the Huntington-Spanish Fork Trasmission Line for Utah Power and Light Company (1977)
- Intensive Survey of Three Transmission Line Routes, Volume I: Cultural Resource Evaluation Along the Sigurd To Emery Transmission Line for Utah Power and Light Company (1977)
- Intensive Survey of Three Transmission Line Routes: Preliminary Resource Evaluation Along the Sigurd To Camp Williams Transmission Line for Utah Power and Light Company (1978)
- Ivie Creek Rest Area Transmission Line, Utah Power and Light Company (1977)
- Letter Report: a Cultural Resource Inventory of the Amoco and Chevron 25 K.V. Line, Lincoln County, Wyoming (1981)
- Letter Report: a Cultural Resource Survey of the Naughton-Carter Creek Power Line in Lincoln and Unita Counties, Wyoming (1981)
- Letter Report: a Cultural Resource Survey of the Opal Compressor Station Tap Power Line in Lincoln County, Wyoming (1981)
- Letter Report: a Cultural Resource Survey of the Railroad / Natural Gas Power Line, Uinta County, Wyoming (1981)
- Letter Report: Affidavit of Archaeological Surface Inspection, Approximately 13 Miles of Proposed Powerline for Utah Power and Light (1980)
- Letter Report: Affidavit of Cultural Resource Inspection, Naughton Steam Electric Plant Storage Area Site, Liquid Sulfur Dioxide Pipeline and Railroad Siding. Right-Of-Way #W-39486 (1980)
- Letter Report: An Amendment To the Archeological Reconnaissance Report of August 9, 1976, On Drill Stations in the East Mountain Locality of the Manti-Lasal National Forest In Emery County, Utah (1976)
- Letter Report: Archaeological Reconnaissance for a Powerline Corridor Re-Route Near Evanston, Wyoming (1981)
- Letter Report: Archaeological Reconnaissance for the Daniels International Powerline Near Evanston, Wyoming (1980)
- Letter Report: Archaeological Reonnnaissance for a Powerline Corridor Near Evanston, WY (1980)
- Letter To Utah Power and Light Re: Unnecessity To Do Survey in Ws County (1985)
- Preliminary Report On the Cultural Resource Evaluation and Test Excavation in the Cottonwood Canyon, Emery County, Utah (1979)
- Preliminary Report On the Cultural Resource Survey of the Proposed Rock Creek Canyon Dam and Reservoir Project (1982)
- Records Search for the Tooele - Mercur - Silverado Substation Tap (1986)
- Report of Archaeological Clearance Study: Utah Power and Light Company Project, Camp Williams -- Sigurd Transmission Line (1975)
- Significance Test of Site 42Sv1897 Near Elsinore, Sevier County, Utah (1984)
- Significance Testing of Eleven Sites in Cottonwood Creek, Emery County, Utah for the Utah Power and Light Company (1982)