Federal Highway Administration
No description specified.
Institution Members
601-650 (6,839 Records)
Documents
- Cultural Properties Assessment - IPE 368 - State Highway 19: From U.S. 287, North Approximately 6.8 Miles (1975)
- Cultural Properties Assessment - IPE 393 - US 69: From McDaniels St. in Mineola, S. To Sabine River (2.9 MI.) (1975)
- Cultural Properties Assessment - IPE 520 - State Highway 16: at Winans Creek, 5.5 Miles West of Bandera (1975)
- Cultural Properties Assessment, F.M. 594: From U.S. 190, 1.0 Mile West of I.H. 35, South and East To I.H. 35 at Loop 121 (1975)
- Cultural Properties Assessment, U.S. Highway 82: From the Montague-Clay County Line To the East City Limits of Saint Jo (1975)
- Cultural Reconnaissance of Approximately 5.3 Miles for the Preferred Alternate For the Bowling Green Bypass in Bowling Green, In Warren County, Kentucky (1988)
- A Cultural Reconnaissance of Approximately 8 Acres for a Proposed Sewage Treatment Facility at Sanders in Owen County, Kentucky (1996)
- Cultural Reconnaissance of Two Proposed Pump Stations in Larue County, Kentucky (1996)
- Cultural Resource Archaeological Survey, PIN 2016.77.101, Route 12 Improvements, Town of Trenton (MCD #06520), Oneida County, New York (2014)
- Cultural Resource Assessment - Foard County FM 98: From US 70 in Crowell, S. and W. To SH 6 (1978)
- Cultural Resource Assessment - IPE 321, County Road 243: at the Guadalupe River, 2.4 Miles W. of US 87 (1983)
- Cultural Resource Assessment - IPE 776- FM Road 3143 (1975)
- Cultural Resource Assessment Brown County Cr 229: Bridge Replacement at Indian Creek (1989)
- Cultural Resource Assessment FM 269: From SH 11 at Pickton To US 67 At Weaver Hopkins County (1988)
- Cultural Resource Assessment FM 968: From 0.3 Mile West of Hatley Creek To 0.2 Mile West of IH 20 - 1.34 Miles, Harrison County (1987)
- Cultural Resource Assessment for the City of Blue Earth Loop of the Faribault County Unity Trail Project, Blue Earth, Faribault County, Minnesota (2000)
- Cultural Resource Assessment of a Proposed Borrow Pit and Waste Area, Jefferson County, Kentucky (1988)
- A Cultural Resource Assessment of a Proposed Water Treatment Plant Near Grayson Lake in Carter County, Kentucky (1998)
- Cultural Resource Assessment of Bridge Replacement Project: East Douglas Avenue Bridge Four Mile Creek, BROS-1945(34)--8J-77, W.O. No. 0212-97-001, City of Des Moines, Polk County Local Systems (1999)
- A Cultural Resource Assessment of Proposed Water / Sewage Lines and Pump Station Locations, Near Mount Sterling, Montgomery County, Kentucky. (1997)
- A Cultural Resource Assessment of the Baileysville Bridge Over the Guyandotte River Wyoming County, West Virginia (1985)
- A Cultural Resource Assessment of the Kentucky Highway 192 Upgrade at London in Laurel County, Kentucky (1998)
- A Cultural Resource Assessment of the Proposed Reroute of Trunk Highway 55, 54th Street to Route 62, Hennepin County, Minnesota (1999)
- Cultural Resource Assessment of Two Proposed Borrow Pits in Washington and Nelson Counties, Kentucky (1990)
- Cultural Resource Assessment, Bexar County, IH 410 (Loop 410): From Moursund Blvd. To IH 10 East of San Antonio - 14.9 Miles, D-8E, 845.715, 0521-06-046 (1986)
- Cultural Resource Assessment, Bexar County, Loop 410: From IH 35 at FM 78, Southwest To Loop 13-0.4 Mile, D-8E 845.715, 0521-06-045 (1985)
- Cultural Resource Assessment, Bexar County, MH: in San Antonio On Bowie St. From Houston St. To Commerce St. and MH: On Houston St. From Bonhma St. To Bowie St. - 0.3 Mile, D-(E, 845.715, 8080-15-001 (1986)
- Cultural Resource Assessment, Hares Corner Interchange, U.S. Route 13 and SR 40, New Castle County, Delaware (1988)
- Cultural Resource Assessment, Lubbock County, Spur 326: From Third Street To Otasca Street in Lubbock - 1.202 Miles, D-8E, 845.705, 0067-07-066 (1986)
- Cultural Resource Assessment, MH 607: On Railroad Drive From Fred Wilson Road To McCombs Street (1981)
- Cultural Resource Assessment, US 77: From Corpus Christi Limit at FM 624 South To Interchange North of Bishop - 17 Miles, D-8E 845.716 0373 (1985)
- A Cultural Resource Evaluation (Phases I and II) for a Portion of Road 1B, Phase I of the TA'U Road Reconstruction Located on TA'U Island, Manu'a, American Samoa (1996)
- A Cultural Resource Evaluation (Phases I and II) for the Ofu-Olosega Road Improvement Project Phases I and II Located on Ofu and Olosega Islands, Manu'a, American Samoa (1996)
- A Cultural Resource Evaluation (Phases I and II) for the Sili Road Extension of the Ofu-Olosega Road Improvement Project on Olosega Island, Manu'a, American Samoa (1996)
- Cultural Resource Evaluation of Improvements on Iowa 25 / US 34 from the Railroad South of US 34 IN Creston, Stp-25-2(20)--38-88,Aka PIN 00-88-025-010, Union County, Primary Roads (2002)
- Cultural Resource Evaluation of Sheldon Recreation Trail 830 City of Sheldon, O'Brien and Sioux Counties, Iowa - Local Systems (1999)
- Cultural Resource Evauation of the Eisenhower Ave. Reconstruction Project, Stp-U-4822(617)--70-17, City of Mason City, Cerro Gordo CO., Local Systems (2002)
- Cultural Resource Inspection of Three Proposed Bridges and Road Relocation Areas On the Kebler Pass Road (Fh71) in Gunnison National Forest, Gunnison County, Colorado (1991)
- Cultural Resource Inventory Along NM 53 Near San Rafael (1994)
- Cultural Resource Inventory and Evaluation of Approximately 6 Miles of Highway Corridor, Colorado Forest Highway 20, Routte County, Colorado (1990)
- Cultural Resource Inventory of Forest Highway 81 (Tarryall Road), Park County, Colorado (1996)
- Cultural Resource Inventory of Proposed Modifications To the Snowy Range Road (State Highway 130) (1979)
- Cultural Resource Inventory Report, Proposed N. Sheridan Blvd., Expansion Project, Jefferson County, Colorado (With Addendum) (1980)
- Cultural Resource Investigation of Utah Forest Highway 39 in Sevier County, Utah (1992)
- Cultural Resource Investigation St. Croix River Bridge (1999)
- Cultural Resource Investigation TH 169 and TH 93 Nicollet and Sibley Counties (1995)
- Cultural Resource Investigation: TH 36 and Stillwater / Houlton Bridge Project (Vols. 1-2) (1994)
- Cultural Resource Investigations of the Christina Gateway Park, Front, Second, French, and Walnut Streets, Block 1192, Wilmington, Delaware (1989)
- Cultural Resource Investigations of the Off-System Federal Aid Bridge Replacement and Rehabilitation Project at Piney Creek, Colorado County, Texas (1986)
- Cultural Resource Management Report Volga City, Flood Mitigation Relocation Site G, Clayton County, Iowa (1999)