Federal Energy Regulatory Commission
No description specified.
Alternate Names: Federal Energy Reg. Commission , Federal Energy Regulatory Commission , Federal Energy Commission, Washington, D.C. , Federal Energy Regulation Commission , Federal Energy Regulatory Commission (F2, F19, F31) , Federal Energy Regulatory Commission, Washington, D.C. , Federal Energy Regulaotry Commission , Federal Energy Regulartory Commission , Federal Energy Regulatory Commission, Washington, DC
Institution Members
1,251-1,300 (1,454 Records)
Documents
- Phase I Cultural Resources Survey of Northern Natural Gas CO. Green Brier Pipeline Lowering IN T80N-R32W - 514, Guthrie County (1996)
- A Phase I Cultural Resources Survey of Northern Natural Gas Company's Proposed Pipeline Relocation Project for Dan's Prize Packing House in Long Prairie, Todd County, Minnesota (1994)
- A Phase I Cultural Resources Survey of Northern Natural Gas Company's Proposed Zone E-F Expansion Project in Central and Southern Minnesota (1994)
- Phase I Cultural Resources Survey of Portion of Northern Natural Gas Company Proposed Des Moines A-Line Replacement Project Polk County (1997)
- Phase I Cultural Resources Survey of Portions of Northern Natural Gas Company Redfield Underground Storage Area IN T79N-R28W-S7 Dallas County (1997)
- A Phase I Cultural Resources Survey of Portions of the Wadena to Park Rapids Pipeline Route in Otter Tail, Wadena, and Hubbard Counties, Minnesota, 1992 Supplemental Report. (1992)
- Phase I Cultural Resources Survey of the Alliance Corridor IN IA (1997)
- Phase I Cultural Resources Survey of the D-345 Line Replacement Project in Seneca Township, Seneca County, and Tymochtee Township, Wyandot County, Ohio (2000)
- Phase I Cultural Resources Survey of the D-96 Line Replacement Project in Sandusky Township, Richland County, and Jackson Township, Crawford County, Ohio (2000)
- Phase I Cultural Resources Survey of the Laurel Storage Field Project in Laurel and Benton Townships, Hocking County, Ohio (2002)
- A Phase I Cultural Resources Survey of the Proposed Elk River Branchline Loop (Gas Pipeline) and Phase II Evaluation of Sites 21AN80 and 21AN93 in Anoka County, Minnesota (1993)
- Phase I Cultural Resources Survey of the Proposed Viking 1999 Expansion Project in Kittson, Marshall, Polk, Clay, Otter Tail, and Morrison Counties, Minnesota (1998)
- Phase I Cultural Resources Survey of Williams Gas Pipeline-Transco's Proposed Temporary Pipeyards and Workspaces Along the Bordentown Loop and the Mount Laurel Replacment (2002)
- Phase I Cultural Resources Survey, Marlowe-Boonsboro-Frostown Project: Two Structure Locations, Washington County, Maryland (1994)
- Phase I Intensive Archaeological Survey / Nng Proposed 100-Foot Branchline from the Dewitt Branchline (Section 33, T84N, R3E) to the New Maquoketa #2 Tbs (Section 32, T84N, R3E), That Is Being Installed by Utilicorp. (2000)
- Phase I Intensive Archaeological Survey of a Proposed Anr Pipeline Company Exposed Pipe Repair Project, SE 1 / 4 Section 23, T70N-R12W, Davis County, Iowa (1999)
- Phase I Intensive Archaeological Survey of Proposed Communication Tower Sjli-99-01 Section 19 T67N-R28W Ringgold County (1999)
- Phase I Intensive Archaeological Survey of the Big Sioux River Crossing of the Lower Akron Branch Line Near Akron, Iowa (2001)
- Phase I Intensive Archaeological Survey of the Bristow Branch Line Highway Widening Project Near Holland, Iowa. (2001)
- Phase I Intensive Archaeological Survey of the Dekalb Tbs Near Boone, IN Boone County, Iowa. (2001)
- Phase I Intensive Archeological Survey / Nng Proposed Hydrostatic Testing of B-Line and C-Line -- Section 2, T72N, R43W, and Sections 35 and 36, T73N, R43W (2000)
- Phase I Intensive Archeological Survey of the Britt Branchline Replacement Project, Hancock County, Iowa (2001)
- Phase I Intensive Archeological Survey of the Savanna Branch Pipeline Replacement Near Bernard, IN Dubuque County, Iowa (2002)
- Phase I Intensive Cultural Resources Survey of Northern Natural Gas CO. Proposed Branch Line Relocation / Removal Project Sections 22,227,& 34 T80N-R35W, Audubon County (1999)
- Phase I Intensive Survey of Williams Gas Pipeline - Texas Gas' Proposed Harvey DMS Replacement in Hancock County, Kentucky (2001)
- Phase I Literature Review and Reconnaissance Survey, Eastgate Toll Plaza Improvement Project, Springfield Township, Mahoning County, Ohio (1997)
- Phase I Literature Review for the Blanchard Hydroelectric Project (FERC No. 346), Morrison County, Minnesota (1999)
- Phase I Survey and Phase II Testing of Sites 13Tm369 and 13Tm370Within the Proposed N Border Project Iowa Loop Construction Right-Of-Way (1998)
- Phase I Survey and Phase II Testing of Sites 13Tm369 and 13Tm370Within the Proposed N Border Project Iowa Loop Construction Right-Of-Way (1998)
- Phase I Survey Letter Reports for the Proposed N Border Chicago Project Within Iowa (1994)
- A Phase I Survey of a Temporary Workspace Near Cambridge, Minnesota for Northern Natural Gas Company (1997)
- A Phase I Survey of Access Roads, Extra Workspace, Crossovers, Reroutes, and Unsurveyed Portions of the Pipeline Corridor in Loop 2 for the Great Lakes Gas Transmission Limited Partnership Pipeline Corridor: 1998 Expansion Project, Minnesota (1997)
- A Phase I Survey of the Rockford Looping Project, Hennepin County, Minnesota (1995)
- Phase I Survey Report: The Hickory Grove Cemetery and the Iowa Eletric Light and Power CO. Proposed 34Kv Transmission Line Boone County (1992)
- A Phase II Archaeological Evaluation of the Prairie Lake Reservoir, Arbo Township, Itasca County, Minnesota (1992)
- Phase II Archaeological Investigations at Site 33 Ho 621, Hocking County, Ohio (1998)
- Phase II Archaeological Investigations at Sites 33 De 272 and 273, Defiance County, Ohio (1998)
- Phase II Archaeological Investigations Within the Northern Border Pipeline Expansion / Extension Project Corridor: Harper, Iowa, to the Mississippi River (1991)
- Phase II Archaeological Investigations Within the Northern Border Pipeline Expansion / Extension Project Corridor: Harper, Iowa, To the Mississippi River (1991)
- Phase II Archaeological Survey For the Reroute of a Six Mile Segment of the Proposed Texas Eastern Pipeline Corridor Through Blue Rock and Meigs Townships, Muskingum County, Ohio (1989)
- Phase II Archaeological Testing at Site 18HA174, Harford County, Maryland (1991)
- Phase II Cultural Resources Investigations for the Falling Rock Creek (46KA292) and Coco Station (46KA294) Sites, Columbia Gas Transmission Corporation's Coco Transmission Project, Kanawha County, WV (1995)
- A Phase II Cultural Resources Report for Proposed Construction of Facilities for Incremental Services to Indiana Gas Corporation at 15Bc 138 & 15Bc164 Breckenridge County, Kentucky (1990)
- Phase II Cultural Resources Report for Proposed Construction of Facilities For Incremental Services To Indiana Gas Corporation: (Kentucky Portion of 14.24 Miles of 20 Inch Loop Line, Breckinridge County, KY) (1990)
- Phase II Evaluation of Site 13Tm267 Within the Proposed Northern Border Project Iowa Loop Survey Corridor (1997)
- Phase II Evaluation of Sites 13Ws359, 13Ws148, 13Ws387, and 13Ws668 Within Proposed Border Project Iowa, Illinois Extension Iowa Segment Survey Corridor (1997)
- A Phase II Evaluation of the Archaeological Sites on the Rockford Looping Project, Hennepin County, Minnesota (1995)
- Phase II Evaluations of Sites Along the Great Lakes Gas Transmission Limited Partnership Pipeline Corridor: 1998 Expansion Project, Minnesota (1997)
- Phase II Significance Evaluations of Archaeological Sites 33HA677, 33HA680, and 33HA686, Crosby Township, Hamilton County, Ohio (1996)
- Phase II Testing at Site 18CV316 and Archaeological Investigations (Phases II and III) at Sites 18ST552 and 18ST601, Patuxent Pipeline, Calvert and St. Mary's Counties, Maryland (1994)