Federal Energy Regulatory Commission
No description specified.
Alternate Names: Federal Energy Reg. Commission , Federal Energy Regulatory Commission , Federal Energy Commission, Washington, D.C. , Federal Energy Regulation Commission , Federal Energy Regulatory Commission (F2, F19, F31) , Federal Energy Regulatory Commission, Washington, D.C. , Federal Energy Regulaotry Commission , Federal Energy Regulartory Commission , Federal Energy Regulatory Commission, Washington, DC
Institution Members
751-800 (1,454 Records)
Documents
- Cultural Resources Management Plan, Flint River Hydroelectric Generating Station: Cultural Properties GP-Ou-01 and GP-Du-02 (1983)
- Cultural Resources Monitoring of Top Soiling of a Work Area Near Keg Creek for Northern Natural Gas CO. Glenwood Interconnect Project Hydrostatic Testing Segment Mills County (1997)
- Cultural Resources Overview of the Bucks Creek Incline and Narrow Gauge Railroad Systems and Grizzly Creek Tunnel and Forebay Construction Road, Plumas National Forest (1984)
- Cultural Resources Overview of the Rock Creek-Cresta Project, Butte and Plumas Counties, California (1986)
- Cultural Resources Overview of Transcontinental Gas Pipe Line Company's Proposed Central Texas Expansion Natural Gas Pipeline, Wharton and Matagorda Counties, Texas, No. 52 (1981)
- Cultural Resources Overview of Two East Texas Pipelines Routes, Report 81-8 (1981)
- Cultural Resources Program Guidebook - Northern Border Project - Docket No CP95-194-001 (1996)
- Cultural Resources Reconnaissance of the Horsetail Hydroelectric Projec, Mono County, California (1982)
- Cultural Resources Reconnaissance Survey of the Proposed Extension of the M.O.P.S. - United Pipeline (1983)
- Cultural Resources Report for Proposed Construction of the Terrestrial Portion of Columbia Gas Transmission Corporation's 20 Inch Pipeline in New Castle County, Delaware (1987)
- Cultural Resources Report of a Proposed Gas Pipeline, Northwest Central, Located In Kay County, Oklahoma (1986)
- Cultural Resources Report of Panhandle Eastern Tologa Delivery System, Pipeline, In Sections 29 and 28, Dewey County, Oklahoma (1994)
- Cultural Resources Report of Property For TXO Service Drilling For Proposed Spears #2-24 Pipeline In Haskell County, Oklahoma (1985)
- Cultural Resources Report On the Proposed Conoco-Stotts #2-33 Gas Well Connect, Located In Major County, Oklahoma (1987)
- Cultural Resources Studies of the Northern Border Pipeline Project Literature / Records Search and Proposed Field Methodology Plan (1979)
- Cultural Resources Study of the Blackhawk Hydroelectric Facility and Associated Study Area For the Wisconsin Power and Light Company in Rock County, Wisconsin (1991)
- A Cultural Resources Study of the International Falls Power Co. Facilities and an Associated Project Corridor in Koochiching County, Minnesota (1993)
- Cultural Resources Study of the Rockton Hydroelectric Facility in Rockton, Illinois (1991)
- Cultural Resources Study of the Scott Paper Company Facilities in Oconto Falls, Wisconsin (1990)
- Cultural Resources Study of the Upper Dam and Hydroelectic Facility of the Flambeau Paper Corporation, Park Falls, Wisconsin (1990)
- Cultural Resources Study of the Weyerhaeuser Corporation Paper Mill in Rothschild, Wisconsin (1990)
- Cultural Resources Survey and Site Testing of the Bonneville Power Administrations Malin-Warner 230 Kv Transmission Line (1985)
- A Cultural Resources Survey for the Forrest Hills Compressor Station to GPM Kingfisher Plant Segment of the Proposed Carney Pipeline.
- Cultural Resources Survey For the Proposed Brazos Gas Pipeline, Matagorda County, Texas (1980)
- Cultural Resources Survey of a Proposed 1.1 Mile Gas Pipeline Replacement and Relocation, Salem Township, Columbiana County, Ohio (1989)
- Cultural Resources Survey of a Proposed 10 Inch Natural Gas Feeder Pipeline Route Between Oskaloosa and Eddyville on Mahaska and Wapello Counties, Iowa (1991)
- Cultural Resources Survey of a Proposed 10.8 Mile Pipeline Corridor in Pike County, Kentucky (1986)
- Cultural Resources Survey of a Proposed 16 Inch Natural Gas Feeder Pipeline Route Near Riverside IN Washington County, Iowa (1990)
- Cultural Resources Survey of a Proposed 4" Gas Pipeline Right-Of-Way Between the H.C. Kaffie No. 1 and H.C. Kaffie No. 2 Wells, Live Oak County, Texas (1988)
- Cultural Resources Survey of a Proposed Connecting Pipeline by NorAm for Existing Well Louis Drufus House 2-31, Canadian County, Oklahoma (1998)
- Cultural Resources Survey of a Proposed Gas Compressor Project In Section 10 of McCurtain County, Oklahoma (1982)
- Cultural Resources Survey of a Proposed Natural Gas Pipeline in Harrison County, Texas (1983)
- Cultural Resources Survey of a Proposed Pipeline Right-Of-Way Near Port Hudson, East Baton Rouge Parish, Louisiana (1980)
- Cultural Resources Survey of a Proposed Pipeline Route in Smith County, Texas (1983)
- Cultural Resources Survey of a Proposed Switch Yard and Access Corridor (1982)
- A Cultural Resources Survey of Erosion Control for the Northern Natural Gas Pipeline IN Mills County, Iowa (1995)
- Cultural Resources Survey of Five Proposed Well Connector Lines (D.H. Neuman GU #1 and GU "A", G.P. Stewart GU #1 and M.R. Saner GU #1) in the North Apple By Field, Rusk and Nacodoches Counties, Texas (1985)
- A Cultural Resources Survey of Northern Natural Gas Company's Mississippi River Crossing - Minnesota (1996)
- Cultural Resources Survey of Northern Natural Gas Company's Proposed B-Line Hydrostatic Testing Project IN Mills County, Iowa (2000)
- Cultural Resources Survey of Northern Natural Gas Company's Proposed Ngpl Glenwood Interconnect Project IN Mills County, Iowa. (2000)
- Cultural Resources Survey of Northern Natural Gas Company's Proposed Palisade on the East Side of the Floyd River IN Sioux County, Iowa (2001)
- Cultural Resources Survey of Northern Natural Gas Company's Proposed Preston Branchline Replacement on the Copper Creek Crossing IN Jackson County, Iowa (2002)
- Cultural Resources Survey of ONG Proposed Pipeline, Tap, and Meter On ARKLA A-1300, Located In McCurtain County, Oklahoma (1993)
- Cultural Resources Survey of Panhandle Eastern Proposed Evergreen Pipeline Project In Sections 10, 6, and 34 To 12, Dewey County, Oklahoma (1994)
- Cultural Resources Survey of Property For the Proposed Drilling of a Gas Pipeline, Lateral-OZARK, Haskell County, Oklahoma (1991)
- Cultural Resources Survey of Proposed Electric Line for Arkansas Valley Electric Cooperation, LeFlore County, Oklahoma. (1997)
- Cultural Resources Survey of Proposed Well Sites and Access Road, State Oil and Gas Lease No. 82053, Mustang Island, Nueces County, Texas, No. 44 (1981)
- Cultural Resources Survey of the Harlan Branch Line Project (Wo #SN0214) IN Cass CO., Iowa (2000)
- Cultural Resources Survey of the Highway 141 Des Moines a and B Pipeline Relocation IN Polk County, Iowa (2002)
- A Cultural Resources Survey of the Iowa Loops on Anr's Southwest Gathering System (1990)