Department of Energy
No description specified.
Institution Members
651-700 (724 Records)
Documents
- Results of the Assessment Survey of Ten Lithic Scatters (33 PE 351, 33 PE 354-356, 33 PE 360-362, 33 PE 369, 33 PE 371, and 33 PE 373) and Deep Testing Along the West Fork of Duck Creek Within a Proposed Texas Eastern Gas Pipeline R. O. W., P (1993)
- Review of Existing Cultural Resource Literature For the Craig - Bonanza 34Kv Transmission Line Project (1987)
- Rifle To San Juan Transmission Line - 1981 (1982)
- Rifle To San Juan Transmission Line - Summary Report Colorado (1987) (1987)
- Rocky Flats (1989)
- Rocky Flats Environmental Technology Site Cultural Resource Management Plan (1996)
- Rocky Flats Plant Property Co (1979)
- Salida Hydroelectric Project Area and Addendum (1991)
- Salida Hydroelectric Project-Public Service Company (1991)
- Sampling Strategy in Archaeological Survey, Archaeological Reconnaissance In West Louisiana and East Texas: Texoma Group Strategic Petroleum Reserve Sites (1977)
- San Juan and NY Smelter Stack (1986)
- San Miguel Hydroelectric Prj (1987)
- Savannah and Ogeechee Canal: Documentation for a Request For a Determination of Eligibility (1978)
- Seismic Hazards Investigation - 1995 Cultural Resource Survey Report (1995)
- Semi-Annual Report On Archaeological Survey Activities (1986)
- Several Maintenance Projects On the Dixon-Flatiron & Flatiron-Weld Transmission Lines (1996)
- Sidney-North Yuma 230-Kilovolt Transmission Line (Original and Addendum) (1991)
- Site 5Da510 Data Recovery Excavations For a Colorado Interstate Gas Company Metering and Distribution Facility (1992)
- Slick Rock Uranium Mill Tailings Remedial Site (1996)
- Slv - Rec Hooper Transmission Line (1985)
- South Table Mountain - Golden, Colorado (Camp George West) (1980)
- Standley Lake Kin Near Ditch Pipeline Replacement Project (1994)
- Standley Lake Protection Project (Original and Addendum) (1992)
- Stanley Canyon Hydroelectric Project (1987)
- Status Report of the Blue River - Gore Pass Transmission Line (1985)
- Sterling Compressor Station Site, Access Road & Access Right-Of-Way To Pipeline For Kn Interstate Gas Co. Plus Addendum (1996)
- Sterling Holyoke 115 Kv Trns Line (1980)
- Study of the Archeological and Historical Resources To Be Affected By Proposed and Alternate Transmission Line Routes, South Texas Project (1974)
- Study of the Archeological and Historical Resources To Be Affected By Proposed and Alternate Transmission Line Routes, South Texas Project (1974)
- Summary Report of the Colo-Ute Electric Assoc Rifle To San Juan Trans Line (1987)
- Summary Report: a Cultural Resource Investigation of the Proposed Comanche Peak-Walnut Springs 345 KV Transmission Line, Erath, Hood, and Somervell Counties, Texas (1985)
- Summary Reports of Monitoring at Sites 41BO160 and 41BO162 (1987)
- Superconducting Supe Collider: a Report of Potential Project Effects To National Register or Eligible Prospects at the Happy Site, Castro and Swisher Counties, Texas (1987)
- Superconducting Super Collider: a Report of Potential Effects To National Reigster or Eligible Prospects at the Happy Site, Castro and Swisher Counties, Texas (1987)
- Supplemental Cultural Resource Inventory of 6.9 Miles of Proposed Transmission Line Right-Of-Way For the Craig - Bonanza 345 Kv Transmission Line Project (1988)
- Survey of Historic Structures.Southern Nevada and Death Valley Inyo County California (1978)
- Survey of Historic Structures.Southern Nevada and Death Valley,Inyo County,California (1978)
- Survey of Historic Structures: Southern Nevada and Death Valleys, Inyo County, California (1978)
- TA-16 Heating System Replacement Cultural Resource Survey Report (1995)
- TA-39 Hardening Upgrade (1996)
- Tampa Lateral For Colorado Interstate Gas Company (Original and Addendum) (1992)
- Technical Area 21, Buildings 3 & 4; Decontamination and Decommissioning (1996)
- Test Excavations at Four Archaeological Sites For the Limestone-Gering-McGrew Transmission Line Project, Wyoming and Nebraska (1990)
- Test Pit Locations Slick Rock Naturita (1986)
- Testing of Two Sites (5Mn3036 & 5Mn3037) In the Naturita Umtra Windblown Contaminant Area (1996)
- Three Potential Lower Reservoir Sites For the Stanley Canyon Pumped Storage Project (1989)
- Three Proposed Alternate Rights-Of-Way For a Reroute of the Blue Mesa-Salida Transmission Line, Poncha Springs (1992)
- Treatment Plan For Sites Within Western Area Power Administration's Curecanti-Blue Mesa-Salida 115 Kv Transmission Line Access Roads Rehabilitation Project (1993)
- Tri-State Generation & Transmission Association, Inc. Galien Substation (1996)
- Tri-State Generation and Transmission Association, Inc. South Fork-Burlington 155 Kv Transmission Line (1994)