Stephen R. Hammond
No description specified.
1-50 (127 Records)
Documents
- Archaeological Survey & Historic Resource Evaluation Report for the Realignment and Rehabilitatin of US 95, San Bernardino County, CA. 60PP (1997)
- Archaeological Survey Report for 08-Riv-74 Pm 62.6 (1980)
- Archaeological Survey Report for 08-Sbd-10 / 30 P.M. R30.2-R33.2 (1980)
- Archaeological Survey Report for 08-Sbd-142 P.M 0.46 (1980)
- Archaeological Survey Report for 08-Sbd-15 P.M. 29.7 / 30.6 (1980)
- Archaeological Survey Report for 08-Sbd-18 P.M 44.30 / 44.93 (1979)
- Archaeological Survey Report for 08-Sbd-30 P.M. T31:9 / T33.0 (1981)
- Archaeological Survey Report for 08-Sbd-40 Pm 149.1 / 154.6 (1980)
- Archaeological Survey Report for Category 4B and 5 Projects 08-Riv-74 Pm 92.2 (1980)
- Archaeological Survey Report for Category 4B and 5 Projects 08-Sbd-38 Pm 17-18.8 (1980)
- Archaeological Survey Report for the Peterson Channel and Laterals a and B (1981)
- Archaeological Survey Report for the Proposed Crowder Canyon Controlled Access Highway (and Proposed Pine Lodge Railroad Grade Separations Materials Site) San Bernardino County, California (1980)
- Archaeological Survey Report for the Proposed Glen Ivey Safty Roadside Rest (1981)
- Archaeological Survey Report for the Proposed Improvement of Haun Road Between Garboni Road and Holland Road, Riverside County, California (1988)
- Archaeological Survey Report for the Proposed Improvment of Route 194, from 0.5 Mile North of Van Buren To Route 60 Junction, 08-Riv-194, Pm 34.7 / 38.3 (1982)
- Archaeological Survey Report for the Proposed Project To Upgrade the Wildwood Safety Roadside Rest, San Bernardino County, California (1980)
- Archaeological Survey Report for the Proposed Replacement of Horse Creek Bridge On State Highway Route 74, Riverside County, California, 08-Riv-74, Post Mile 75.7 (1982)
- Archaeological Survey Report for the Proposed Safety Project On Interstate Route 10 Between Chiriaco Summit and Willey's Well Overcrossing, Riverside County, California (1981)
- Archaeological Survey Report for the Proposed Whitewater Safety Roadside Rest Expansion Project On Interstate Route 10, Riverside County, California (1982)
- Archaeological Survey Report for the Proposed Widening of Interstate Route 15 Between Glen Ivy Undercrossing and 0.4 Mile South of Ontario Avenue 08-Riv-15, P.M.33.3 / 38.3 (1985)
- Archaeological Survey Report for the Realignment of State Route 58 Between Hinckley and Interstate Route 15 in the City of Barstow, San Bernardino County (1986)
- Archaeological Survey Report Wildwood Safety Roadside Rest 08-Sbd-10 P.M. 38.2 (1980)
- Archaeological Survey Report, Roadside Rest Facilities, South of Victorville (1980)
- Archaeological Survey Report: Burnt Mill Maintenance Station (1981)
- Archaeological Survey Report: Drainage Improvement (1980)
- Archaeological Survey Report: Flatten Cut Slopes at Two Locations and Curve Realignment At Another Location (1980)
- Archaeological Survey Report: Long Point, State Route 330 (1981)
- Archaeological Survey Report: Minor Curve Realignment On Route 62, San Bernardino County, California (1983)
- Archaeological Survey Report: Park 'n Ride Facility Adjacent To Irwin Road Route 58, Pm 36.4 (1982)
- Archaeological Survey Report: Proposed Drainage Improvement Project Along West Side of Route 247 (1982)
- Archaeological Survey Report: Proposed Patton Park and Ride Location (1981)
- Archaeological Survey Report: Proposed Realignment of Route 95 Near Arrowhead Junction (1980)
- Archaeological Survey Report: Realignment of State Route 18, East of Junction of Route 38 at Big Bear (Lake) Dam (1980)
- Archaeological Survey Report: Realignment On Route 95 at Lobecks Pass, San Bernardino County, California (1982)
- Archaeological Survey Report: Relocation of State Route 58 West of Kramer Junction (1982)
- Archaeological Survey Report: Route 15, P.M. 140 / 155, Expansion of Existing Materials Site (1982)
- Archaeological Survey Report: Route 30 Between Third Street and Route 10 at Tennessee Street (1980)
- Archaeological Survey Report: Route 30 Near the City of Redlands (1981)
- Archaeological Survey Report: Route 30, City of Rialto (1979)
- Archaeological Survey Report: Three Material Source Sites Along 115 in the Eastern Mojave Desert (1981)
- Archaeological Survey Report: Two Borrow Pit Areas, Needles Area (1980)
- Archaeological Survey Report: Yucaipa Boulevard Reconstruction (1983)
- Archeological Survey Report for 08- Sbd-330 P.M. 40.3 (1981)
- Archeological Survey Report for 08-Riv-111 P.M. 43.5 / 43.85 (1981)
- Archeological Survey Report for 08-Riv-15 P.M. 31.3 / 31.9 (1980)
- Archeological Survey Report for 08-Sbd-15 P.M. 101.0 / 139.0 (1980)
- Archeological Survey Report for 08-Sbd-18 P.M. 25.2 (1981)
- Archeological Survey Report for 08-Sbd-247 P.M. 1.0 / 1.3 (1981)
- Archeological Survey Report for 08-Sbd-30 P.M. 28.1 (1981)
- Archeological Survey Report for 08-Sbd-95 P.M. 45.5 / 45.7 (1981)