Shaune M. Skinner
No description specified.
51-84 (84 Records)
Documents
- Phase I and II Cultural Resources Survey For the Proposed Clay Village, Ltd., Tuscarawas County, Ohio (1985)
- Phase I and Phase II Archaeological and Historic / Architectural Survey of the Preferred Alignment For the Lancaster Bypass (Fai-33-11.22 [P. F. 626]) Fairfield County, Ohio, Volume 1 (1982)
- Phase I Archaeological Survey For the Proposed New Richmond Marina Near New Richmond, Clermont County, Ohio (1981)
- Phase I Cultural Resources Survey For a Proposed Surface Mining Facility in Belmont County, Ohio (1980)
- Phase I Literature Review and Reconnaissance Survey For the Proposed Davidson Road / 138 Kv Extension, Norwich Township, Franklin County, OH (1994)
- Phase I Literature Review For the Hamlin-Hines, Munro and Clarke-Kisko Mining Tracts, Tuscarawas County, Ohio (1986)
- Phase I-III Archaeological Survey of the Proposed Crawdaddys Riverfront Restaurant and Hotel Development (1985)
- Phase II Archaeological Survey For 900 Acres Within the Proposed Mining Tract Application No. D-0447-1 (1986)
- Phase II Archaeological Survey of the Proposed Egypt Valley East II Mining Tract, Belmont County (Permit Application No. 0906) (1987)
- Phase II Archaeological Survey of the Proposed Mahan Mining Tract, Belmont County, Ohio (1987)
- Phase III Archaeological Assessment For Five Sites Within the D-0447-1 Mining Tract, Muskingum County, Ohio (1986)
- Phase III Archaeological Assessment for the Job Run Site 1, 33 Kn 220 and the Job Run Site 4, 33 Kn 223, Knox County, Ohio (1986)
- Phase III Archaeological Assessment of Six Sites in Ross County, Ohio, and Backhoe Testing of Floodplains In Ross and Fayette Counties, Ohio, To Be Crossed By a Segment of the Hopetown-Xenia AT&T Fiber Optics Cable (1988)
- Phase III Archaeological Assessment of the Ott-Hagloch 2 Site (33 Tu 259), Jefferson Township, Tuscarawas County, Ohio (1986)
- Phase III Assessment Survey of Seven Sites in the Proposed Zanesville Industrial Park, Falls Township, Muskingum County, OH (1989)
- Phase III Eligibility Assessment Survey of Archaeologically Sensitive Areas G and H Located Within the Proposed Schrock Road Expansion Corridor (Fra-710-1.57; Cr 82B) (1980)
- Phase III: Detailed Survey of the Route 423 By-Pass Near Portsmouth, Scioto County, Ohio (Sci 423-2-2.40) (1979)
- Prehistoric and Historic Archaeological and Historic / Architectural Cultural Resource Studies Within the Proposed North Westerville Transportation Improvement Corridors, Phase I: Literature Review, Preliminary Alternative Segment (1987)
- Preliminary Archaeological Reconnaissance of Several Possible Routes of Access into Strouds Run State Park, Athens County, Ohio (1978)
- Preliminary Archaeological Reconnaissance of the Smokey Ridge Estates III and Worthington Estates Development Sites, Franklin County, Ohio (1978)
- Preliminary Archaeological Survey For Proposed Improvements To U.S. Route 250 in Erie County, Ohio (Eri-250-4.24) (1981)
- Preliminary Archaeological Survey For the Proposed R.V.G. Mining Tract Application No. D346-2, Jackson Twp., Guernsey County, Ohio (1986)
- Preliminary Archaeological Survey of the Proposed Improvements For the Stone Road and Crouse Chapel Road, Ross County, Ohio (1979)
- Preliminary Archaeological Survey of the Proposed Right-Of-Way For the Ohio Approach To the Greenup Dam Bridge (1978)
- Preliminary Prehistoric Archaeological Survey For the Proposed Barrett Mill By-Pass, Highland County, Ohio (1978)
- Proposed Data Recovery Procedures To Mitigate Potential Adverse Affects To Sites 33 Bl 179 and 33 Bl 180 in Belmont County, Ohio (1990)
- Proposed Phase IV Data Recovery Procedures To Mitigate Potential Adverse Effects From Surface Mining Within the Belville Mining Tract (D-746) of the Brady Run Rockshelter 3 (33 Le 165) (1989)
- Proposed Phase IV Data Recovery Procedures To Mitigate Potential Adverse Effects From the Construction of a Gas Pipeline Across the Hunter I Site (33 Mu 304) (1989)
- Proposed Phase IV Excavations at 33 Ro 385 to Mitigate Potential Adverse Effects From the Construction of the Hopetown-Xenia Segment of the AT&T Fiber Optics Cable in Ross County, Ohio (1988)
- Proposed Phase IV Excavations: To Mitigate Potential Adverse Effects at 33 VI 22 and 33 VI 315 From Construction of the Parkersburg - Hopetown Segment of the AT&T Fiber Optics Cable, Vinton County, Ohio (1988)
- Report On the Phase II Archaeological Survey of the Proposed Expansion of U.S. Route 36, Darke County, Ohio (1977)
- Research Proposal For Data Recovery at 33 Fr 945, Franklin County, Ohio (1992)
- Results of a Data Recovery Program For Portions of the Howard Baum Site (33-R0-270), Ross County, Ohio (1981)
- Summary of Reconnaissance Work Conducted On Portions of the Proposed Indiana-Ohio Pipeline Corridor in Darke, Preble, Montgomery, Warren and Butler Counties, Ohio (1989)