Richard Stallings
No description specified.
101-150 (235 Records)
Documents
- A Phase I Cultural Resource Survey of a 1.5 Acre Borrow Site Located East of Poole Road, Boone County, Kentucky. (1992)
- Phase I Cultural Resource Survey of a 1.5 Acre Electricity Transmission Substation, Adair County, Kentucky (1995)
- Phase I Cultural Resource Survey of a 1.5 Acre Electricty Transmission Substation Located Near Independence, Kenton County, Kentucky (1995)
- A Phase I Cultural Resource Survey of a 1.5 Acre Power Substation Located Near South Elkhorn, Jessamine County, Kentucky (1995)
- Phase I Cultural Resource Survey of a 1.5 Acre Power Substation, McCreary County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 1.661 Acre Electrical Substation, Montgomery County, Kentucky (1995)
- Phase I Cultural Resource Survey of a 10 Acre Sewer Treatment Plant Located Near the Makers Mark Distillery, Marion County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 10 Acre Water Treatment Plant, Located at Augusta, Bracken County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 100 X 100 Foot Water Tabk Site, Albany, Clinton County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 100x100 Foot Water Tank and a 200x20 Foot Access Road, Russell County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 100X100 Foot Water Tank Located On Button Knob, Casey County, Kentucky (1992)
- A Phase I Cultural Resource Survey of a 100x100 Foot Water Tank Site Located Near Olga, Russell County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 100X100 Foot Water Tank Site Located Near Shelby City, Lincoln County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 100X100 Foot Water Tank Site Near the Eastern End of Poplar Mountain, Wayne County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 102.9 Acre Proposed Mining Permit Located in Black John Branch and Upper Smith Branch In Knott County, Kentucky (1991)
- A Phase I Cultural Resource Survey of a 145 Acre Proposed Landfill Complex, Mason County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 15 Acre Industrial Development Site, Cynthiana, Harrison County, Kentucky (1992)
- A Phase I Cultural Resource Survey of a 17.4 Mile Realignment of US231, Bowling Green to Scottsville, Warren and Allen Counties, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 1l5 Acre Water Tank Site and 2900 Foot Water Pipeline Located in Monticello, Wayne County, Kentucky (1991)
- A Phase I Cultural Resource Survey of a 2.25 Acre Borrow Site for the Highway 110 Bridge Replacement Project, Breckinridge County, Kentucky (1991)
- Phase I Cultural Resource Survey of a 2.5 Acre Borrow Site Located Near Rosetta, Breckinridge County, Kentucky (1993)
- A Phase I Cultural Resource Survey of a 2.5 Acre Borrow Site Located Near Veechvale, Shelby County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 2.7 Acre Electricty Transmission Substation, Pulaski County, Kentucky (1995)
- Phase I Cultural Resource Survey of a 2.7 Acre Senior Citizen Apartment Complex Located at Shelbyville, Shelby County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 2.9 Acre Substation Site, Rowan County, Kentucky (1995)
- Phase I Cultural Resource Survey of a 20 Acre Storage Facility Located Near Melbourne, Campbell County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 2000 Foot Access Road and Two Water Pipelines Located in Adair County, Kentucky. Project 91-11 (1991)
- Phase I Cultural Resource Survey of a 23.5 Acre Industrial Park Development Near Stanton, Powell County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 25 Acre Industrial Development Site, Cynthiana, Harrison County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 25X25 Foot Water Tank Site, Franklin County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 28 Acre Addition To the Maysville / Mason County Landfill, Mason County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 3.5 Acre Borrow Site Located Near Simpsonville, Shelby County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 3.5 Acre Borrow Site West of State Route 657, Hancock County, Kentucky (1992)
- A Phase I Cultural Resource Survey of a 3.7 Acre Borrow Site Located Near Mount Washington, Bullitt County, Kentucky (1944)
- Phase I Cultural Resource Survey of a 30 Acre Industrial Development Located Near Somerset, Pulaski County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 40 Acre Office and Storage Facility Located Near Elizabethtown, Hardin County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 40.4 Acre Coal Permit Area Located at Graham, Muhlenberg County, Kentucky (1992)
- A Phase I Cultural Resource Survey of a 5 Acre Sewer Treatment Plant Located at Glencoe, Gallatin County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 5.5 Mile Highway Corridor, Shepherdsville, Bullitt County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 5.7 Mile Highway Corridor, Garrard County, Kentucky (1993)
- Phase I Cultural Resource Survey of a 50X50 Foot Water Tank Located Near Mortonsville, Woodford County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 50X50 Foot Water Tank Site Located Near the Mortonsville School, Woodford County, Kentucky (1992)
- Phase I Cultural Resource Survey of a 75 Acre Industrial Complex Located Near Owenton, Owen County, Kentucky (1992)
- Phase I Cultural Resource Survey of a Five Acre Boat Ramp Located at Roberts Bend, Pulaski County, Kentucky (1995)
- Phase I Cultural Resource Survey of a Five Acre Borrow Site Located Near Falls of Rough in Breckenridge County, Kentucky (1991)
- Phase I Cultural Resource Survey of a Five Acre Sewage Treatment Plant Located at Bonnieville, Hart County, Kentucky (1993)
- A Phase I Cultural Resource Survey of a Four Acre Borrow Site in Scott County, Kentucky (1991)
- Phase I Cultural Resource Survey of a Four Acre Housing Project Located in Harrodsburg, Mercer County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a Four and One-Half Acre Borrow Sit in Bullitt County, Kentucky (1991)
- Phase I Cultural Resource Survey of a One Acre Borrow Site for the Highway 25 Eagle Creek Brdige Replacement Project, Scott County, Kentucky (1991)