Richard A. Cowan
No description specified.
1-6 (6 Records)
Documents
- Cultural Resource Survey of the Proposed Southern California Edison Palo Verde-Devers 500 Kv Transmission Line (1977)
- Cultural Resource Survey of the Proposed Southern California Edison Palo Verde-Devers 500 Kv Transmission Line, Volume II (1977)
- Field Work and Initial Artifact Analysis: Southern California Edison No.2 Control-Casa Diablo 115Kv Transmission Line (1974)
- Fieldwork and Artifact Analysis, Sce No. 2 Control - Casa Diablo 115 Kv Transmission Line (1974)
- Final Report-Field Work and Artifact Analysis. Southern California Edison No.2 Control-Casa Diablo 115Kv Transmission Line (1974)
- Pacheco Site (Marin-152) and the Middle Horizon in Central California (1983)