Oglethorpe Power, Tucker, GA
No description specified.
51-77 (77 Records)
Documents
- Cultural Resources Survey of the Proposed Morris Transmission Line, Clay County, Georgia (1994)
- A Cultural Resources Survey of the Proposed New Light Church to Orange Transmission Line, Cherokee County, Georgia (1989)
- Cultural Resources Survey of the Proposed Northeast Emanuel Substation and Tap Transmission Line, Emanuel and Burke Counties, Georgia (1992)
- Cultural Resources Survey of the Proposed Northeast Emanuel Substation and Tap Transmission Line, Emanuel and Burke Counties, Georgia: Addendum (1992)
- Cultural Resources Survey of the Proposed Oglethorpe Power Corporation Dublin Chip Mill Transmission Line Corridor and Substation Site, Laurens County, Georgia (1988)
- Cultural Resources Survey of the Proposed Oglethorpe Power Corporation MT. Carmel 230 / 25KV Substation, Douglas County, Georgia (1988)
- Cultural Resources Survey of the Proposed Oglethorpe Power Corporation South Griffin-Double Cabins 115 KV Transmission Line, Spalding County, Georgia (1988)
- Cultural Resources Survey of the Proposed Pecan City Transmission Line and Substation, Dougherty County, Georgia (1985)
- A Cultural Resources Survey of the Proposed Preston to Long Branch Transmission Line Right-Of-Way Widening (1990)
- A Cultural Resources Survey of the Proposed Rocky Mountain to Plant Hammond Transmission Line and Switching Station, Floyd County, Georgia (1988)
- Cultural Resources Survey of the Proposed Sandersville 230 kV Loop Transmission Line Corridor, Washington County, Georgia (1991)
- Cultural Resources Survey of the Proposed Scenic Square Substation and Transmission Line, Gwinnett County, Georgia (1994)
- Cultural Resources Survey of the Proposed Sharpsburg 115 / 12 kV Substation and Tap Transmission Line, Coweta County, Georgia (1992)
- Cultural Resources Survey of the Proposed Smarr Substation and Transmission Line, Monroe County, Georgia (1989)
- Cultural Resources Survey of the Proposed Steele Road Substation Site, Spalding County, Georgia (1991)
- Cultural Resources Survey of the Proposed Sugarloaf Transmission Line and Substation, Gwinnett County, Georgia (1986)
- A Cultural Resources Survey of the Proposed Transmission Line from Fitzgerald Primary to Swakers Substations, Ben Hill County, Georgia (1988)
- Cultural Resources Survey of the Rhine-Jacksonville Transmission Line, Dodge and Telfair Counties, Georgia (1988)
- Cultural Resources Survey of the Tatum Substation and Transmission Line, Troup County, Georgia (1987)
- Data Recovery at a Utility Pole Location 9Le(SAS)1, Lee County, Georgia, Cobb-Warwick Transmission Line (1985)
- Letter Report: Summary of Phase I Cultural Resource Survey of the Proposed Sixes Substation, Cherokee County, Georgia (1992)
- Oglethorpe Power Corporation Pumped Storage Hydroelectric Facility Site Evaluations Prefeasibility Report: Historical / Archeological Resources, Cedar Grove Alternative (1986)
- Oglethorpe Power Corporation Pumped Storage Hydroelectric Facility Site Evaluations Prefeasibility Report: Historical / Archeological Resources: Johnson Crook Alternative (1986)
- Preliminary Survey for the Proposed Brookstone Substation, Cobb County, Georgia (1990)
- Results of a Preliminary Reconnaissance Cultural Resources Survey of the Proposed Route of the Due West - Cobb Waterworks Transmission Line (1987)
- Scared Corn and Rich Mountain: Intensive Cultural Resources Survey of Oglethorpe Power Corporation's Proposed Hydroelectric Facility, Pickens County, Georgia, Volume 1 (1988)
- Second Addendum to: Cultural Resources Survey of the Proposed Oglethorpe Power Corporation Asbury-Nord Kaolin 115 kV Transmission Line and Nord Kaolin 115 / 25 kV Substation, Twiggs County, Georgia (1989)