Paul R. Nickens
No description specified.
151-200 (244 Records)
Documents
- Mitchell Energy Hells Hole Fed 1-35-1-104 Well and Access Road (1985)
- Mitchell Energy Park Mountain Federal 1-12-3-104 Well (1985)
- Moon Lake - Prospecting License Area (Report 79-2) (1979)
- Moon Lake - Railroad Corridor Construction Mitigation (1982)
- Moon Lake - Two Power Plant Sites and Water Pipeline Corridors / Impacts To Archaeological Resources and a Recommended Program of Mitigation (2 Addendums, One To Moon Lake Project Report 79-5 and One To Moon Lake Project Report 79-4) / Coal (1979)
- Moon Lake Electric Assoc Trns Line (1978)
- Moulton Valley Units 15 28 and 13 22 (1981)
- Moulton Valley Units 15-28 and B-22: Report of Examination for Cultural Resources (1981)
- Natural Bridges Road and Campground Inventory (1987)
- Natural Gas Well Sites (1977)
- Natural Gas Well Sites (1977)
- Natural Gas Well Sites and Access RDS (1978)
- New Evidence of a Mass Burial and Possible Cannibalism From an Early Pueblo III Kiva in Southwestern Colorado (1980)
- North Crcdo Federal #1 (1984)
- NPS-BLM Waste Disposal Site (1986)
- Oil Springs Unit 310 and Road (1985)
- One Well Pad Near Natural Bridge (1982)
- An Overview of Ethnographical and Archaeological Data for Ute Burial Practices (1984)
- Overview of Ethnographical and Archaeological Data For Ute Burial Practices (1984)
- Paleoenvironmental Changes and Anasazi Biocultural Adaptations (1981)
- Paleoepidemology of Mesa Verde Anasazi Population: Lines of Increased Density (1975)
- Palmer Oil & Gas Well Fed 12-6 (1978)
- Palmer Oil & Gas Well Fed 29-5 and Rd (1978)
- Palmer Oil & Gas Well Fed 6-8 (1978)
- Palmer Oil and Gas Cpy SW Garfield Cty (1978)
- Perspectives On Archeological Site Protection and Preservation (1991)
- Phillips Petroleum Seismic Line (1981)
- Prehistoric Cultural Resources of Rio Grande National Forest, South-Central Colorado (1979)
- Preliminary Report of the 1985 and 1986 Survey, Cultural Resources Inventory for the Colorado-Ute Electric Association Rifle To San Juan Transmission Line Project; Report No. 18: Highway 160 To Long Hollow (1986)
- Primary Bore Hole #3 (1982)
- Proposed Gas Pipeline Was Surveyed for Cultural Resources. One Isolated Find Was Recorded and One Previously Recorded Site Reevaluated (1985)
- Proposed Locations of Guy Line Anchors at Two Structures Along the Desert Bonanza-Rangely Transmission Line (1983)
- Proposed Locations of Mitchell Energy Hells Hole Fed 2-11-2-104 Well and Access Road Were Inspected for Cultural Resources (1985)
- Proposed Locations of Mitchell Energy Rabbit Mountain Fed. 2-18-2-103 and Access Road Were Inspected for Cultural Resources. Two Historic Sites Were Recorded (1985)
- Proposed Route of Access Road in Big Trujillo Wash Servicing the Deseret Bonanza-Rangely Transmission Line (1983)
- Proposed Spoil Area for Excess Excavated Materials Was Inspected (1982)
- Proposed TXO Production Corp. Hells Hole Federal #2 Well and Access Road (1985)
- Proposed TXO Production Corp. Hells Hole Federal #3 and Access Road (1985)
- R.O.W. for a Proposed Access Road To the Moon Lake Project Property (1982)
- R.O.W. Within a Corridor for the Moon Lake Project Railroad Was Monitored (1982)
- Research Design and Mitigation Plan For the Yellowhouse Dam and Reservoir, Pueblo of Zuni, New Mexico (Final Report) (1980)
- Results of a Class III Intensive Inventory of the MT. Logan Resevoir Facilities in Roan Creek Valley, Colorado (1983)
- Results of Archeological Testing at Sites 5Me4959, 5Me1524 and 5Me4778, Rifle-Grand Junction Segment of the Rifle-San Juan Transmission Line Project (1985)
- Rifle - San Juan Transmission Line Project (1985)
- Rifle To San Juan Resurvey of Access Rd (1984)
- Rifle To San Juan Transmission Line - Summary Report Colorado (1987) (1987)
- Rifle-San Juan Transmission Line Project (1985)
- Rifle-San Juan Transmission Line Project, Access Roads (1985)
- Rio Blanco Oil Shale Company - Airstrip Expansion (1980) (1980)
- Rock Ck Dam Rcc Aggregate Project (1986)