Leah D. Rogers
No description specified.
151-200 (228 Records)
Documents
- Phase I Cultural Resource Survey for a Proposed Canoe Access Site Upper Dam, Upper Iowa River, Winneshiek County, Iowa (1989)
- Phase I Cultural Resource Survey For a Strip Mine Reclamation Project in Mahaska County, Iowa: Hall and Rempe Tracts (1986)
- Phase I Cultural Resource Survey For a Strip Mine Reclamation Project in Van Buren and Marion Counties, Iowa: Wilcox and Hughes / Phillips Tracts (1986)
- Phase I Cultural Resource Survey For the Proposed Windflower Development Project in Warren County, Iowa (1986)
- Phase I Cultural Resource Survey of the Proposed Relief Sewer and Equalization Basin at the Town of Rock Rapids, Lyon County, Iowa (1984)
- Phase I Cultural Resource Survey of Three Proposed Locations For Borrow Areas Associated With One Bridge Replacement Project Bros-9034(12)--8J-34, Contract No. 30251 FHWA #1495 Floyd County, Iowa (1989)
- Phase I Cultural Resources Investigation for Highway 2 / 275 Bypass A.K.A. the Sidney Bypass, Fremont County (1998)
- Phase I Cultural Resources Investigation for the Altoona NE Industrial Area Polk County (1999)
- Phase I Cultural Resources Investigation for the Clinton-Mill Creek Expressway, Clinton County, Iowa (1997)
- Phase I Cultural Resources Investigation for the Council Street NE Bridge Replacement over Dry Creek, City of Cedar Rapids, Linn County, Iowa (2001)
- Phase I Cultural Resources Investigation for the Northern Segment of Clinton-Mill Creek Expressway, Clinton County (1998)
- Phase I Cultural Resources Investigation of 7th Ward Ditch - Culvert Replacement Polk County, Iowa (1998)
- A Phase I Cultural Resources Investigation of a Structure Replacement (BROS-CO91(35)--5F-91; FHWA #333110), Squaw Township, Warren County, Iowa (1999)
- Phase I Cultural Resources Investigation of East Deer Creek Road over Deer Creek Bridge Replacement FHWA # 002260 and Road Grading Project BROS-1415(9)--8J-23, Clinton County (1998)
- Phase I Cultural Resources Investigation of Highway 275 Reconstruction and East South Omaha Bridge Road Reconstruction Project Pottawattamie County (1998)
- Phase I Cultural Resources Investigation of MT. Vernon Road SE Widening Project Linn County (1998)
- Phase I Cultural Resources Investigation of the 6th Street SW Bridge Replacement Project, City of Cedar Rapids, Linn County, Iowa (2000)
- Phase I Cultural Resources Investigation of the 72nd Ave. Reconstruction, Grade and Pave Project Polk County, Iowa (1997)
- Phase I Cultural Resources Investigation of the 7th Ward Ditch Detention Basin Project, City of Des Moines, Polk County, Iowa (1999)
- Phase I Cultural Resources Investigation of the Avenue G Viaduct and Roadway Project IN the City of the City of Council Bluffs, Pottawattamie County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Burlington Family Recreation Complex, City of Burlington, Des Moines County (1998)
- Phase I Cultural Resources Investigation of the Cottage Grove Avenue Bridge Replacement Project (BRM-1187(28)--8N-57) at Indian Creek IN the City of Cedar Rapids, Linn County, Iowa (1999)
- Phase I Cultural Resources Investigation of the Council Bluffs Airport Environmental Assessment Project, Council Bluffs, Pottawattamie County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Easter Lake Basin Master Plan Project Priority 1--Phase 3 Preliminary Design, City of Des Moines, Polk County, Iowa (1999)
- Phase I Cultural Resources Investigation of the Historic Amana Main Street Project, Village of Amana, Iowa County, Iowa (Stp-Es-0140(602)--8I-48 (2001)
- Phase I Cultural Resources Investigation of the I-35 / 80 Douglas Avenue Interchange Reconstruction (Imn-35-2 (269) 86--13-77), Webster Township, Polk County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Indianola-Carlisle Recreational Trail, Warren County, Iowa (1999)
- Phase I Cultural Resources Investigation of the Property Bounded by E. 6th St, Sycmore Street, E 8th Street, and the Cedar River, IN the City of Waterloo, Black Hawk County, Iowa (2001)
- Phase I Cultural Resources Investigation of the Proposed I-80 and Highway 71 Interchange Reconstruction Project, Cass County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Proposed Location of Four New Cabins and Associated Underground Utility Lines IN Pinicon Ridge County Park, Linn County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Proposed Ridge Road Bridge Replacement Project (BROS-CO91(41)--5F-91, A.K.A. P-0960), Squaw Township, Warren County, Iowa (2001)
- Phase I Cultural Resources Investigation of the Proposed Warren County Bridge Replacement Project (Nhxs-5-5(40)--3H-77; A.K.A. PIN 95-77520-9), Greenfield Township, Warren County, Iowa (2000)
- Phase I Cultural Resources Investigation of the Proposed Westerly Box Bridge Replacement Project (BROS-CO91(40)--9F-91, A.K.A. P-0374), Squaw Township, Warren County, Iowa (2001)
- Phase I Cultural Resources Investigation of the Tower Terrace I-380 Interchange Study (Project No. Im-380-6(200)259-13-57), Linn County, Iowa (2001)
- A Phase I Cultural Resources Investigation of the U.S. Highway 30 MT. Vernon / Lisbon Bypass, Linn and Cedar Counties, Iowa (2000)
- Phase I Cultural Resources Investigation of the West Grand Business Park, City of West Des Moines, Dallas and Polk Counties, Iowa (1999)
- Phase I Cultural Resources Investigation of the West Grand Business Park, City of West Des Moines, Dallas and Polk Counties, Iowa (1999)
- Phase I Cultural Resources Investigation of Wind Power Project Cerro Gordo County (1998)
- Phase I Cultural Resources Investigation of Yellow Pole Road Realignment Project BROS-1642(18)--8J--78 Council Bluffs, Pottawattamie County (1998)
- Phase I Cultural Resources Investigationof USPS City N Liberty Construction of New USPS Facility, Johnson County (1998)
- Phase I Cultural Resources Investigations of for (Sic) the Mount Pleasant Trail: Phase Two, City of MT. Pleasant, Center Township, Henry County, Iowa (Project Number 98043) (1999)
- Phase I Cultural Resources Investigations of the Iowa Highway 5 Local Streets Project for the Relocation of S. 50th , S. 22nd, and S 8th Streets IN Bloomfield Township, Polk County, Iowa (2000)
- Phase I Cultural Resources Investigations of the Tower Terrace I-380 Interchange Study (Project No. Im-380-6(200)259-13-57), Linn County, Iowa (2001)
- A Phase I Cultural Resources Survey a Proposed Bridge Replacement FHWA 333830, and Road Grading Project FM-91(L-1570)Project, Warren County (1993)
- A Phase I Cultural Resources Survey of a Proposed Road Grading Project County Roads Project RS-7554 and Bridge Removal FHWA # 333500, Warren County (1992)
- A Phase I Cultural Resources Survey of a Proposed Road Grading Project RS-7522--61-91(L-0559). Warren County (1993)
- A Phase I Cultural Resources Survey of Revised / Updated Road Grading Project FM-91(L-1570), Warren County (1994)
- A Phase I Cultural Resources Survey of the Proposed NE 18th Street Paving Project #Stp-V-0187(2)--70-77, NE Delaware Avenue to US Highway 69, Ankeny, Iowa (1993)
- Phase I Historic Architectural Survey of Area 1 of the Proposed West Lake Project Black Hawk County, Iowa (1991)
- Phase I Resources Investigation of the Proposed Gear Street Box Bridge Replacement Project (BROS-CO91(43)--8J-91, A.K.A. E-0475), Jefferson Township, Warren County, Iowa (2002)