Christina Harrison
No description specified.
1-21 (21 Records)
Documents
- Archaeological Phase II Investigation With the Country Lakes Park, City of Lino Lakes, Minnesota, 1982 (1982)
- Archaic Period of Northwestern Wisconsin: a Study Unit (1991)
- Cultural Resources Survey of the Superior National Forest; Cook, Lake and St. Louis Counties, Minnesota (1978)
- Report On a Cultural Resource Reconnaissance Survey of Proposed Development Areas Within Ferry Landing Park, Village of North Hudson, St. Croix County, Wisconsin, Performed On September 2 and 10, 1983 (1983)
- Report on a Cultural Resource Survey and Preliminary Evaluation of FY 81 Proposed Undertakings on the Superior National Forest, Minnesota (1981)
- Report On a Sample Archeological Intensive Field Survey of Boot Lake Waterfowl Production Area, Litchfield Wetland Management District, Jackson County, Minnesota Performed On July 8-9 and August 8-10, 1983 (1983)
- Report On an Archeological Intensive Field Survey of Tract 106, Parcel A, Tatley Lake Waterfowl Production Area, Clay County, Minnesota, Performed On November 2-4, 1983 (1984)
- Report On Archaeological Field Survey of Chippewa Valley Waterfowl Production Area, Douglas County, Minnesota, Performed During October 1985 (1985)
- Report On Archaeological Field Survey On 1) Rosendale Waterfowl Production Area, Meeker County, 2) Jacob Schaff Tract, Meeker County, and 3) Marysville Waterfowl Production Area, Wright County, Minnesota (1985)
- Report On Archaeological Surveys At Sherburne National Wildlife Range (Sherburne County), Swan Lake Waterfowl Production Area (Kandiyohe County), Tamarac National Wildlife Refuge... & Maple Lake Waterfowl Production Area... (1984)
- Report On Archeological Surveys at Sherburne National Wildlife Refuge (Sherburne County), Swan Lake Waterfowl Production Area (Kandiyohi County), Tamarac National Wildlife Refuge (Becker County) and Maple Lake Production Area (Polk County), (1984)
- Report On Cultural Reconnaissance Survey Around the Prairie Lake Reservoir and the Prairie River Hydroelectric Facility, Itasca County, Minnesota (1991)
- Report On Cultural Resource Investigations Along the Trego Reservoir Shoreline, Washburn County, Wisconsin (1990)
- Report On Intensive Archaeological Testing, Western Part of 21AN24, Circle Pines, Anoka County, 1983 (1983)
- Report On Intensive Testing of Prehistoric Sites 21AN23 and 21AN30, Rice Lake Estates Project, Lino Lakes, Anoka County (1984)
- Report On Phase 2 Investigations of Cultural Resources at Proposed Wastewater Treatment Plant in Stoddard, Vernon County, Wisconsin (1980)
- Report On Test Excavations Carried out On the Blackbird Trail #2 Site, 21BK28 (1978)
- Report On the Archaeological Survey Carried out in the Township of Barnes, Bayfield County, Wisconsin, On May 14, 1979 (1979)
- Report On the Archaeological Survey Carried out in the Village of Colfax, Colfax Township, Dunn County, Wisconsin, On Junbe 1-5, 1979 (1979)
- Report On the Archeological Survey Carried out On November 8, 1975, On the Lakeshore Property Owned By Mr. Frank Bohman, Ranier, Minnesota, and Located in the E1 / 2 of Se1 / 4, Sec 28, T.71N., R.23E., Rainy Lake, Koochiching County, Minnesota (1975)
- Terminal Woodland Period of Northwestern Wisconsin: a Study Unit (1990)