Russell L. Miller
No description specified.
1-8 (8 Records)
Documents
- Cultural Resources Survey, Harry S. Truman Dam and Reservoir Project, Volume 6, Euro-American Settlement of the Lower Pomme De Terre River Valley (1977)
- Cultural Resources Survey, Harry S. Truman Dam and Reservoir Project, Volume VI, Euro-American Settlement of the Lower Pomme De Terre River Valley (1983)
- Phase I Cultural Resource Survey, Route C Bridge Construction 7 Miles South of Eastwood, Carter County, Missouri (1981)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23An108, 0.3 Miles East of Route I-29, Route T, Andrew County (1986)
- Phase I Cultural Resources Survey and Phase II Archaeological Testing of Site 23Cm55, 1.2 Miles West of Route C, Route A, Camden County (1988)
- Phase I Cultural Resources Survey of Route 60 Bridge Replacements, 1 Mile East of Fremont, Carter County, Missouri (1980)
- Phase I Cultural Resources Survey, Job No. 9-P-60-24B, Route 60, Carter County, Bridge Replacements 1 Mile East of Fremont (1980)
- Zumwalt`S Fort: An Archaeological Study of Frontier Process In Missouri (1979)