Karen Crotteau
No description specified.
1-26 (26 Records)
Documents
- 1984 First Addendum: Acquisition of a 45 Acre Parcel for Use as a Maintenance Station and Alternate Site 11-SD-L-5702, 11209-135401 (1984)
- 1984 Negative Archaeological Survey Report-Second Addendum for Road Widening on Route 78. 11-SD-78, 20.3-20.5 11212-124991 (1984)
- 1984 Road Bed Widening for a Left Turn Lane at Mina de Oro Road 11-SD-67 P.M. 16.1-16.3 11359-910052-5957067. (1984)
- 1984 Road Widening on Route 94 11-SD-94 63.2-63.7 11601-936081. (1984)
- Archaeological Phase I Survey Report for Proposed Rock Outcrop Removal on 11-SD-76 (P.M. 18.25, 18.7, 19.15, 20.25) 11212-185021 (1981)
- Archaeological Reconnaissance of the North Corbin II Timber Sale, Arr# 05-08-09 (1980)
- Archaeological Reconnaissance of the Powell Cabin Timber Sale, Arr# 05-08-10 (1980)
- Archaeological Survey of Several Highway Route Alternatives in Kearny Mesa, San Diego, California (1981)
- Archaeological Survey Report for a Proposed Realignment Near Weekend Villa Road On Route 78 in San Diego County (1984)
- Archaeological Survey Report For Proposed Storm Damage Project On Interstate 8 Eastbound in Imperial COunty, California (1983)
- Archaeological Survey Report for the Proposed MTDB Urban Transir Corridor (11812-634517-6T11232B). (1983)
- Archaeological Test Excavation at Sites CA-SDI-5655, 5658, 9239, 9240, 9246, 9247, 9913 in Shepherd Canyon, San Diego, California 11-SD-52 P.M. 7.3 / 17.2 11222-047050 (1985)
- Asr for Proposed Storm Drainage Project On Interstate 8 Eastbound in Imperial County, California (1983)
- First Addendum Archaeological Survey Report for a Proposed Material Site for the Sweetwater River Bridge Replacement 11-SD-94 P. M. T15. 2 / T15. 5 (1983)
- Historic Property Survey 11-SD-78 P. M. 32. 9-33. 1 (1984)
- Historic Property Survey Report 11-SD-8 P. M. 17. 6, Proposed Acquisition of a 4. 5 Acre Parcel for Use As a Maintenance Station (1983)
- Nasr for Sr 15, Pm 1.1 / 1.6 (1984)
- Negative Archaeological Survey Report - Second Addendum - Route 15, P.M.1.1 / 1.6 (1984)
- Negative Archaeological Survey Report 11-SD-94, P. M. 54. 7-54. 8-Improving Drainage by Raising the Roadbed out of the Floodplain (1983)
- Negative Archaeological Survey Report 11-SD-L-5702-Acquisition of a 4-5 Acre Parcel for Use As a Maintenance Station (1984)
- Negative Archaeological Survey Report for 08-Riv-15-1.1 / 1.6 (1984)
- Negative Archaeological Survey Report Road Widening 11-SD-67 Post Mile 16.1-16.3 (1984)
- Negative Archaeological Survey Report, Widening of Roadbed on North Side of Roughe 778 Between Mileposts 20. 3-20. 5 (1984)
- Negative Archaeological Survey Report: Route 15, P.M. 1.1 / 1.6 (1984)
- Realignment Survey 11-SD-94 P.M. 54.7-54.8 11212-183150 (1983)
- Third Addendum Archaeological Survey Report for a Proposed Material Site and Biological Mitigation Parcel Sweetwater River Bridge Replacement 11-SD-94 P. M. T15. 0 / 15. 5 (1984)