- Addendum To Results of Archaeological Investigations On Access Roads Outside the 200-Foot Right-Of-Way in Newcastle, Tobin, and Benches Division Along the Intermountain Power Project (Ipp) +-500 Kv DC Intermountain-Adelanto Line 1 .. (1984)
- Research Design and Data Recovery Plan for Phase V Archaeological and Historic Resources Studies Along the 500 Kv DC Intermountain-Adelanto Line 1 (Revised) in Utah (1984)
- Results of Archaeological Investigations On Access Roads Outside the 200-Foot Right-Of-Way in Newcastle, Tobin, and Benches Divisions, Along the Intermountain Power Project (Ipp) +-500 Kv DC Intermountain Adelanto Line 1 (Revised) Utah.. (1984)